# 2026-04-22 11:50:05
## Recursive Typicals
A competent quantity takeoff software must support **recursive typicals**.
> "Building Type A" has Levels
> * Level 01,
> * Level 02,
> * Level 03,
> * Level 04,
> * Level 05
>
> "Building Type A Levels 02-04" is typical of
> * "Building Type A/Level 02",
> * "Building Type A/Level 03",
> * "Building Type A/Level 04"
>
> "Building Type A" is typical of
> * "Building 1",
> * "Building 2",
> * "Building 3"
In all cases, a typical must behave as the **Type** it is typical of,
(i.e. the process to assign takeoff to "Levels 02-10"
must be essentially the same as to do so to "Level 01")
and the use of a typical must not exclude the use of the breakdowns it is typical of
(i.e. the use of "Levels 02-10" must not exclude the use of "Level 02").
+18
View File
@@ -0,0 +1,18 @@
---
id: 2026-04-22T13:41:20-0400
title: 2026-04-22 13:41:20
tags:
- occupational
daily: "[[2026-04-22]]"
---
# 2026-04-22 13:41:20
## Trust the Process
Separate UG, OH, and Flex Feeder assemblies
add extra terminations, wire, and conduit fittings
that will not be necessary for installation.
Mech Connection assemblies
do not include disconnects
nor labor to install them.
+100
View File
@@ -0,0 +1,100 @@
---
id: 2026-04-23T10:01:40-0400
title: 2026-04-23 10:01:40
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 10:01:40
## Virginia Live! Director Review
[[estimating-director-review]] for
[[virginia-live-casino-and-hotel]]:
## Switchgear
Note extensive emergency power provisions
verify control wiring for generator to ATS
#### Lighting HR's
count of circuits, control zones in takeoff notes
lot length
#### Temporary Power
Used two `TEMPORARY POWER - HR`
Narrative
extended light layouts
#### Generator
3000 gallons * 6 dollars per gallon = $18000
#### Labor
ASL Column 2 with adjustments
Site Labor +50%
#### Telecom Backbone
#### Medium Voltage
Medium voltage cabling downstream of
#### Underground Runs
need rigid 90's for PVC runs 200ft and above
> horizontal? vertical? both?
#### Fixture Labor
Tape light: 1 hour per 6 feet
snap together linear: 1 hour per 5 feet
##### Center Bar Fixture
assuming each crystal is an individual fixture
over 5000 crystals
80 circuits
A-GAM-442
##### Dragon Fixture
1000 hours
#### Lighting Control
"Networked" to mean either
"Centralized"
or "Standalone" with Network Bridges.
> Wattstopper Network Bridges are limited to 64 devices (zones)
#### DAS
Sold Design Build
#### Historicals
Want to know
casino cost per square foot
#### Composite Cleanup
#### Multi-Shift Impact
20% of hours
add $5 per hour
#### Indirect Labor
16% burden
#### Facade
Extra cost for facade lighting install
250,000
"Go to 150k"
+14
View File
@@ -0,0 +1,14 @@
---
id: 2026-04-23T14:36:51-0400
title: 2026-04-23 14:36:51
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 14:36:51
Need to refresh myself on
[[nfpa-70_311_mv-conductors]]
Note that 2023 moved MV content to
Article 314 Part 3
and Article 315
+19
View File
@@ -0,0 +1,19 @@
---
id: 2026-04-23T16:24:49-0400
title: 2026-04-23 16:24:49
tags:
- occupational
daily: "[[2026-04-23]]"
---
# 2026-04-23 16:24:49
I asked a former [[pdi-operations#Project Manager|PM]]
what purpose [[conest|ConEst]] serves
if [[pdi-operations|Ops]] is doing the same takeoff.
He said I was mistaken,
that Ops modifies the ConEst estimate,
they don't redo it.
When Ops receives the [[pdi-vdc|VDC]] Feeder Verification Sheet
(which is based on our own [[pdi-project-start-notification#Feeder Verification]])
they change our takeoff to match.
+13
View File
@@ -0,0 +1,13 @@
---
id: 2026-04-23T17:41:32-0400
title: 2026-04-23 17:41:32
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 17:41:32
## Professional Certifications
* Project Management Professional (PMP)
* Certified Quality Engineer (CQE)
* Lean Six Sigma Black Belt (LSBB)