From dcb4c30887aa79765a274957218e3a4036e36d49 Mon Sep 17 00:00:00 2001 From: Zane Meyers Date: Fri, 27 Mar 2026 14:00:24 -0400 Subject: [PATCH] vault backup: 2026-03-27 14:00:24 --- timestamped/2026-03-11_11-58-49.md | 4 +++- timestamped/2026-03-25_12-53-30.md | 5 ++++- 2 files changed, 7 insertions(+), 2 deletions(-) diff --git a/timestamped/2026-03-11_11-58-49.md b/timestamped/2026-03-11_11-58-49.md index d49ce2f..b0cf818 100644 --- a/timestamped/2026-03-11_11-58-49.md +++ b/timestamped/2026-03-11_11-58-49.md @@ -19,6 +19,8 @@ yearly: "[[2026]]" --- # 2026-03-11 11:58:49 +## Selling Scope + When an estimator provides a proposal, they are said to be "selling" the scope of work. @@ -30,7 +32,7 @@ are potentially very different. * contractor's intended meaning (most favorable to contractor) * professional legal interpretation of scope (somewhere in between) -## See Also +### See Also * [[2025-12-03_15-54-22#Excluding Vs. Ignoring Project Requirements]] * [[2025-11-06_18-12-00#"Bad Bid Practice"]] diff --git a/timestamped/2026-03-25_12-53-30.md b/timestamped/2026-03-25_12-53-30.md index 28e60ad..7da5674 100644 --- a/timestamped/2026-03-25_12-53-30.md +++ b/timestamped/2026-03-25_12-53-30.md @@ -22,6 +22,9 @@ Regarding [[statistical-modeling-for-construction-estimating#Average Distance Gi I'd like to look further into this topic. -Multi-family has several factors that make run distances more consistent than the kitchen sink roster I was used to. +Multi-family has several factors +that make run distances more consistent +than the kitchen sink roster I was used to. + Area per unit falls within a predictable range. Floors are long and narrow to ensure all units have windows.