## Charlotte South End Hotel Spec Interpretation
Spec interpretation notes for [[charlotte-south-end-hotel]]
with clarification by [[joel-jansen]]:
### EMT Fittings
@@ -54,7 +55,7 @@ No definition is provided for a liquid-tight flexible non-metallic raceway
> in mechanical rooms or where subject to moisture or weather.
> [!quote] Joel Jansen 2026-03-10 (pp.)
>
> Assume LFMC.
[^1]: I feel fairly confident this is erroneous.
@@ -130,7 +131,7 @@ These are captured as a budget
Assuming that this line includes master switches
based on sum of quote and switch allowance
> [!quote] PDR Lutron Lighting Control Quote 2025-12-10, Pricing Summary Turnkey
> [!quote] PDR Lutron Lighting Control Quote 2025-12-10, Pricing Summary Turnkey
> Lighting Control: Lutron $ 738,400.00
### EV Chargers