@@ -124,10 +124,10 @@ may be routed through with special permission.
|
||||
|
||||
[[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]]
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> No affect on takeoff. Routing in slab still possible.
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> PT slabs do have some affect on takeoff.
|
||||
> 3in conduit can not be run in an 11in PT slab.
|
||||
|
||||
@@ -135,7 +135,7 @@ may be routed through with special permission.
|
||||
|
||||
[[construction-methods#Pan Deck Slab|Pan Deck Slab]]
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> Do not route in slab.
|
||||
|
||||
### MC Cable Overhead
|
||||
|
||||