@@ -38,7 +38,7 @@ is insufficient for [[full-takeoff]].
Budget per Unit Count. Budget per Unit Count.
Compare to Bid Sheet. Compare to Bid Sheet.
> [!info] Alternate method as described by Joel > [!info] Alternate method as described by [[joel-jansen]]
> Takeoff unit risers normally > Takeoff unit risers normally
> with Length * 1.5 to cover house panel feeders. > with Length * 1.5 to cover house panel feeders.
@@ -54,5 +54,5 @@ See [[switchgear-takeoff#Generator]].
Budget per Unit Count. Compare to Bid Sheet. Budget per Unit Count. Compare to Bid Sheet.
> [!info] Alternate method as described by Joel > [!info] Alternate method as described by [[joel-jansen]]
> Takeoff per [[subfeeds-takeoff]], use average for length. > Takeoff per [[subfeeds-takeoff]], use average for length.
+1 -1
View File
@@ -23,7 +23,7 @@ dg-publish: true
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>` All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
> [!cite] Joel Jansen, in reference to Omni Hotels Raleigh (pp.) > [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)
> It is acceptable to use typicals for identical feeders > It is acceptable to use typicals for identical feeders
> (i.e. meter centers fed from bus plugs) > (i.e. meter centers fed from bus plugs)
> so long as the typical is in `Area` = "01 - Feeders/Risers ...". > so long as the typical is in `Area` = "01 - Feeders/Risers ...".
+2 -2
View File
@@ -50,8 +50,8 @@ not especially consistent with the actual install.
> This scope is included here for its similarity in content. > This scope is included here for its similarity in content.
> It may be more appropriate in [[electrical-takeoff]] > It may be more appropriate in [[electrical-takeoff]]
> [!quote] Joel Jansen 2026-01-20T16:30 (pp.) > [!quote] [[joel-jansen]] 2026-01-20T16:30 (pp.)
> Josh Ford prefers it in electrical, but I'm not concerned. > [[josh-ford]] prefers it in electrical, but I'm not concerned.
> So long as it's named "Pool Bonding" it's fine. > So long as it's named "Pool Bonding" it's fine.
1. * `Area` = _Contentious_ 1. * `Area` = _Contentious_
+4 -2
View File
@@ -13,8 +13,10 @@ dg-publish: true
# Me-isms # Me-isms
* (when misunderstood) "No, no, no." * (when misunderstood) "No, no, no."
* certainly * "certainly"
* "ought", "ought not"
## Others-isms
* "... and stuff." * "... and stuff."
* "Also too ..." * "Also too ..."
*
+1 -2
View File
@@ -414,8 +414,7 @@ All 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles in the area
* (8) Assisted living facilities * (8) Assisted living facilities
> [!info] Informational Note No. 1: > [!info] Informational Note No. 1:
> This requirement would include receptacles identified as 5-15, 5-20, 6-15, and 6-20 in ANSI/NEMA WD 6- > This requirement would include receptacles identified as 5-15, 5-20, 6-15, and 6-20 in ANSI/NEMA WD 6-2016, Wiring Devices — Dimensional Specifications.
2016, Wiring Devices — Dimensional Specifications.
> [!info] Informational Note No. 2: > [!info] Informational Note No. 2:
> Assisted living facilities are Institutional Use Group I-1 per IBC 2015. > Assisted living facilities are Institutional Use Group I-1 per IBC 2015.
+4 -1
View File
@@ -15,4 +15,7 @@ A package manager is a service that curates software
## For Linux ## For Linux
On Linux machines, On Linux machines,
package managers are the package managers are the defacto means
for installing any software.
## For Windows
+1 -1
View File
@@ -229,7 +229,7 @@ delivers high-quality results and takes initiative.
### Comment ### Comment
> [quote] Joel Jansen > [quote] [[joel-jansen]]
> Zane has been a great addition to our team in these short few months. > Zane has been a great addition to our team in these short few months.
> He's shown genuine enthusiasm while learning, > He's shown genuine enthusiasm while learning,
> asks the right questions, and has picked up our PDI standards quickly. > asks the right questions, and has picked up our PDI standards quickly.
+1 -1
View File
@@ -42,7 +42,7 @@ Clear **Field** for other than the project's [[pdi-building-types|building type]
* **Cost/Unit** <- 8.5 * **Cost/Unit** <- 8.5
* **Duration** <- 0.01 * **Duration** <- 0.01
%% Approved by Joel Jansen 2026-02-20 %% %% Approved by [[joel-jansen]] 2026-02-20 %%
### Garden Style, High Rise ### Garden Style, High Rise
+1 -1
View File
@@ -126,7 +126,7 @@ Does not include finished restaurants
* `Area` = "XX - Level XX Retail Building" * `Area` = "XX - Level XX Retail Building"
* `Phase` = "Office Space" * `Phase` = "Office Space"
> [!quote] Joel Jansen to William Bonn 2025-12-05 (pp.) > [!quote] [[joel-jansen]] to William Bonn 2025-12-05 (pp.)
> PDI Accubid `Phase` "Office Space" > PDI Accubid `Phase` "Office Space"
> is normally used for core & shell retail office space > is normally used for core & shell retail office space
+3 -3
View File
@@ -37,9 +37,9 @@ Paste the completed template content to the body of a new email.
* Bid Estimator or Associate Estimator (if applicable) * Bid Estimator or Associate Estimator (if applicable)
**CC:** **CC:**
* Senior Construction Estimator %% Joel %% * Senior Construction Estimator %% [[joel-jansen]] %%
* ConEst Manager (Josh Ford) * ConEst Manager ([[josh-ford]])
* Director of Estimating (Corwin Fluit) * Director of Estimating ([[corwin-fluit]])
* Jessalyn Williams * Jessalyn Williams
* Other ConEst Estimators (if applicable) * Other ConEst Estimators (if applicable)
+37
View File
@@ -23,6 +23,14 @@ believed to be implied by the context.
One must write with clarity sufficient for an outsider to understand, One must write with clarity sufficient for an outsider to understand,
because the writer will eventually be the outsider. because the writer will eventually be the outsider.
In this note and elsewhere
I strongly associate the concept of PKM
and effective note-taking in general
with the use of [hypertext](https://en.wikipedia.org/wiki/Hypertext).
Notes you don't reference are useless and,
short of reading your entire collection every few weeks,
liberal use of links is the best way to increase availability.
## Getting Started ## Getting Started
Getting started with PKM will feel so intimidating that you'll want to give up, Getting started with PKM will feel so intimidating that you'll want to give up,
@@ -35,6 +43,35 @@ so you may leave some of those videos feeling like you need to pick up boulderin
It speaks to the highly personal nature of PKM that, of these hundreds, It speaks to the highly personal nature of PKM that, of these hundreds,
there is no consensus larger than two on best practice. there is no consensus larger than two on best practice.
### My Advice
#### Write Literally Everything
Plain text is too cheap to have high standards.
Write dumb ideas, write about trivial conversations,
write anything you can make two sentences out of.
When you don't yet know your goals for your vault
this is how you figure out how it can help you,
but you should never stop doing this.
I recommend setting up timestamped notes
to make this workflow as easy as possible.
Naming topics is one of the hardest parts of PKM
and the more it can be avoided the better
as far as I'm concerned.
#### Use Version Control
In service to my preferred method of moving fast and breaking stuff,
[[git]] allows me to make massive changes to my vault,
including deleting entire files that have gone stale,
without fear of regret,
because what's lost can always be recovered.
To get the most benefit out of git,
commit your changes at least once a day.
## See Also ## See Also
* [[digital-gardens]] * [[digital-gardens]]
+2 -2
View File
@@ -61,7 +61,7 @@ tags:
## Chef's Notes ## Chef's Notes
This recipe has very low [[utility]]. This recipe has very low [[utility]].
It is easily the most complex of all my It is easily the most complex of all I've curated,
but it has very little to offer in reward.
%% %%
+1 -1
View File
@@ -32,7 +32,7 @@ Seek additional clarification.
## Breakdowns ## Breakdowns
> [!quote] Joel Jansen 2026-02-02 12:10, while reviewing Howard University East Towers (pp.) > [!quote] [[joel-jansen]] 2026-02-02 12:10, while reviewing Howard University East Towers (pp.)
> Match breakdowns of the relevant system, > Match breakdowns of the relevant system,
> i.e. don't change breakdowns after taking off > i.e. don't change breakdowns after taking off
> the assembly to be sleeved. > the assembly to be sleeved.
+1 -1
View File
@@ -55,7 +55,7 @@ dg-publish: true
2. ==1" to 1-1/2" EMT riser== 2. ==1" to 1-1/2" EMT riser==
* [ ] TODO: Establish Power Monitoring riser takeoff procedure with Joel and document * [ ] TODO: Establish Power Monitoring riser takeoff procedure with [[joel-jansen]] and document
## Generator ## Generator
+1 -1
View File
@@ -27,5 +27,5 @@ timestamp based on my teams message to Joel.
> * Coupling Method: Compression coupling or Setscrew coupling. > * Coupling Method: Compression coupling or Setscrew coupling.
> Setscrew couplings with only single screw per conduit are unacceptable. > Setscrew couplings with only single screw per conduit are unacceptable.
> [!quote] Joel Jansen via Microsoft Teams @ 2025-10-15 09:33 AM > [!quote] [[joel-jansen]] via Microsoft Teams @ 2025-10-15 09:33 AM
> use set screw 🙂 > use set screw 🙂
+4 -2
View File
@@ -15,7 +15,9 @@ dg-publish: true
### Belle Meade Director Review ### Belle Meade Director Review
[[belle-meade-plaza]] Estimating Director Review for [[belle-meade-plaza]]
lead by [[corwin-fluit]],
attended by [[joel-jansen]] and myself.
#### Takeoff Review #### Takeoff Review
@@ -59,7 +61,7 @@ Joel to add these.
> [!info] Circuits per Raceway > [!info] Circuits per Raceway
> Corwin stated that---assuming no overriding specification--- > Corwin stated that---assuming no overriding specification---
> up to 6 circuits in a raceway are permissible. > up to 6 circuits per raceway are permissible.
##### Lighting Control ##### Lighting Control
+1 -1
View File
@@ -11,7 +11,7 @@ dg-publish: true
# 2025-11-10 11:14:?? # 2025-11-10 11:14:??
I was updating my notes, I was updating my notes,
filling in gaps in scripts based on Joel's, filling in gaps in scripts based on [[joel-jansen]]'s,
when I noticed a strange paragraph: when I noticed a strange paragraph:
> [!quote] `OneNote`/`Joel Take-off`/`Misc. Notes` > [!quote] `OneNote`/`Joel Take-off`/`Misc. Notes`
+1 -1
View File
@@ -18,7 +18,7 @@ dg-publish: true
%% %%
Transcription of notes Transcription of notes
taken while reviewing Elliot St. with Joel Jansen. taken while reviewing Elliot St. with [[joel-jansen]].
%% %%
Adorne USB Heating Designation was built with standard device. Adorne USB Heating Designation was built with standard device.
+1 -1
View File
@@ -12,7 +12,7 @@ dg-publish: true
[[2025w51|This week]] [[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers, William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff. used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior Joel Jansen approved of the method. Our senior [[joel-jansen]] approved of the method.
I'd like to use the method tentatively for takeoff strictly typical of all units I'd like to use the method tentatively for takeoff strictly typical of all units
(e.g. master switches, MSDE's, etc.), (e.g. master switches, MSDE's, etc.),
+1 -1
View File
@@ -66,7 +66,7 @@ I would, but I usually extract the schedules anyway
so I just use the actual average. so I just use the actual average.
> Thank you for that. > Thank you for that.
> Joel wagged his finger at me about missing terms this morning--- > [[joel-jansen|Joel]] wagged his finger at me about missing terms this morning---
> I wanted to see how it's preferred. > I wanted to see how it's preferred.
> I was told terms are captured by feeders/mech connections > I was told terms are captured by feeders/mech connections
> and have never added them to panelboards. > and have never added them to panelboards.
+2 -1
View File
@@ -13,7 +13,8 @@ dg-publish: true
## 2100 Crystal Drive Takeoff Review ## 2100 Crystal Drive Takeoff Review
[[2100-crystal-drive]] Notes on my takeoff for [[2100-crystal-drive]]
as reviewed with [[joel-jansen]]:
### Generators ### Generators
+4 -1
View File
@@ -10,7 +10,8 @@ dg-publish: true
## 2100 Crystal Drive Closeout ## 2100 Crystal Drive Closeout
[[2100-crystal-drive]] Notes on [[2100-crystal-drive]]
as reviewed with [[joel-jansen]]:
### Extension ### Extension
@@ -50,6 +51,8 @@ Joel is having me change them to \#12/2.
### Labor Plan ### Labor Plan
Relevant to [[pdi-labor-plan]]:
$$ $$
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening} \mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
$$ $$
+1 -1
View File
@@ -17,4 +17,4 @@ Drawings show 2 separate duplex receptacles for dishwasher and disposal
Takeoff used `DW & DISPOSAL DUAL CIR - ...`, Takeoff used `DW & DISPOSAL DUAL CIR - ...`,
which includes only one receptacle. which includes only one receptacle.
According to Joel this takeoff is correct for the scenario. According to [[joel-jansen]] this takeoff is correct for the scenario.
+1 -1
View File
@@ -9,7 +9,7 @@ dg-publish: true
--- ---
# 2026-01-12 12:23:?? # 2026-01-12 12:23:??
Travelling with Brian Smarslok and Joel Jansen on [[2026-01-15]] Travelling with Brian Smarslok and [[joel-jansen]] on [[2026-01-15]]
to visit [[woodbury-heights|an awarded project]] in New Jersey. to visit [[woodbury-heights|an awarded project]] in New Jersey.
Flying from TPA to PHL, departure @ 7:00AM. Flying from TPA to PHL, departure @ 7:00AM.
We'll be meeting with the developer, [Greystar](https://www.greystar.com/). We'll be meeting with the developer, [Greystar](https://www.greystar.com/).
+1 -1
View File
@@ -11,7 +11,7 @@ dg-publish: true
--- ---
# 2026-01-12 13:02:?? # 2026-01-12 13:02:??
Joel attributes the [[#GP Variance|apparent variance]] [[joel-jansen]] attributes the [[#GP Variance|apparent variance]]
of [[woodbury-heights]] to of [[woodbury-heights]] to
1. missed Polaris lugs for feeders for one building, 1. missed Polaris lugs for feeders for one building,
2. insufficient budget for equipment rental, and 2. insufficient budget for equipment rental, and
+4
View File
@@ -15,6 +15,10 @@ dg-publish: true
### 2100 Crystal Drive ConEst Manager Review ### 2100 Crystal Drive ConEst Manager Review
ConEst Manager Review for [[2100-crystal-drive]]
lead by [[josh-ford]],
attended by [[joel-jansen]] and myself.
#### Josh's Review Order #### Josh's Review Order
1. Backwards from Final Pricing through rest of closeout, 1. Backwards from Final Pricing through rest of closeout,
+1 -1
View File
@@ -14,7 +14,7 @@ dg-publish: true
Follow-up to [[2026-01-13_11-28-14#Lighting Control]] Follow-up to [[2026-01-13_11-28-14#Lighting Control]]
> [!quote] Conversation between Joel Jansen and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]: > [!quote] Conversation between [[joel-jansen]] and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]:
> >
> **Joel:** "It was sold as local." > **Joel:** "It was sold as local."
> >
+1 -1
View File
@@ -16,7 +16,7 @@ dg-publish: true
#### Quote #### Quote
> [!quote] Joel Jansen 2026-01-15 13:27 (pp.) > [!quote] [[joel-jansen]] 2026-01-15 13:27 (pp.)
> I'd rather have an accurate budget than an accurate BOM. > I'd rather have an accurate budget than an accurate BOM.
#### Context #### Context
+1 -1
View File
@@ -16,7 +16,7 @@ dg-publish: true
## Sleeving Takeoff Breakdown Direction ## Sleeving Takeoff Breakdown Direction
Updated [[sleeving-takeoff#Breakdowns]] Updated [[sleeving-takeoff#Breakdowns]]
per clarification with Joel. per clarification with [[joel-jansen]].
Previous direction below. Previous direction below.
> * `Area` = "01 - Feeders/Risers ..." > * `Area` = "01 - Feeders/Risers ..."
+1 -1
View File
@@ -26,7 +26,7 @@ Anything else?
How do they rank in importance? How do they rank in importance?
Why are other departments so confused about ConEst's purpose? Why are other departments so confused about ConEst's purpose?
(Ops stakeholder auditing CBOM to Joel: "missing screws") (Ops stakeholder auditing CBOM to [[joel-jansen]]: "missing screws")
If we don't know, and Ops doesn't know, who does? If we don't know, and Ops doesn't know, who does?
That is, who defines our purpose? That is, who defines our purpose?
+1 -1
View File
@@ -20,7 +20,7 @@ yearly: "[[2026]]"
## Mechanical Connection Selection ## Mechanical Connection Selection
Relevant to [[electrical-takeoff]], Relevant to [[electrical-takeoff]],
sourced from Joel Jansen's OneNote Takeoff Notes "Mechanical Connections". sourced from [[joel-jansen]]'s OneNote Takeoff Notes "Mechanical Connections".
Ben says he has never used any PVC assembly except .../`PVC - ...`. Ben says he has never used any PVC assembly except .../`PVC - ...`.
+6 -4
View File
@@ -20,15 +20,17 @@ yearly: "[[2026]]"
## Hampton Roads Navy - Norfolk: Director Review ## Hampton Roads Navy - Norfolk: Director Review
[[hampton-roads-navy_norfolk]] Director Review of [[hampton-roads-navy_norfolk]].
### Dramatis Personae ### Dramatis Personae
Director of ConEst: Corwin Fluit Director of ConEst: [[corwin-fluit|Corwin Fluit]]
Bid Estimator: Christian Pereiro Bid Estimator: [[christian-pereiro|Christian Pereiro]]
Senior ConEst Estimator: Joel Jansen Senior ConEst Estimator: [[joel-jansen|Joel Jansen]]
ConEst Estimator: [[zane-meyers|Zane Meyers]]
### Lighting Control ### Lighting Control
+1 -1
View File
@@ -17,7 +17,7 @@ yearly: "[[2026]]"
--- ---
# 2026-02-20 09:39:20 # 2026-02-20 09:39:20
A few minutes ago I asked Joel about [[units-takeoff|unit takeoff]], A few minutes ago I asked [[joel-jansen]] about [[units-takeoff|unit takeoff]],
specifically if I should provide a GFI for each bathroom specifically if I should provide a GFI for each bathroom
even if the receptacles are on the same circuit, even if the receptacles are on the same circuit,
which he confirmed. which he confirmed.
+2 -1
View File
@@ -20,7 +20,8 @@ yearly: "[[2026]]"
## Fire Alarm Wiring Methods ## Fire Alarm Wiring Methods
[[fire-alarm-takeoff]] direction for [[fire-alarm-takeoff]]
as confirmed by [[joel-jansen]]:
> [!quote] Zane Meyers @ 09:35 to Joel Jansen via Teams regarding [[1990-k-street]] > [!quote] Zane Meyers @ 09:35 to Joel Jansen via Teams regarding [[1990-k-street]]
> From our Pre-Takeoff email: > From our Pre-Takeoff email:
+1 -1
View File
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
## Trainee Development Scorecard ## Trainee Development Scorecard
[[2026-02-20]] reviewed with [[joel-jansen]] [[2026-02-20]]:
### Skill: WBS ### Skill: WBS
+1 -1
View File
@@ -19,7 +19,7 @@ yearly: "[[2026]]"
## Values & Competencies ## Values & Competencies
Reviewed in-person with Joel Jansen [[2026-03-03]]. Reviewed in-person with [[joel-jansen]] [[2026-03-03]].
Regarding the scoring, Regarding the scoring,
Joel stated that in past years, Joel stated that in past years,
+2 -1
View File
@@ -20,6 +20,7 @@ yearly: "[[2026]]"
## Charlotte South End Hotel Spec Interpretation ## Charlotte South End Hotel Spec Interpretation
Spec interpretation notes for [[charlotte-south-end-hotel]] Spec interpretation notes for [[charlotte-south-end-hotel]]
with clarification by [[joel-jansen]]:
### EMT Fittings ### EMT Fittings
@@ -54,7 +55,7 @@ No definition is provided for a liquid-tight flexible non-metallic raceway
> in mechanical rooms or where subject to moisture or weather. > in mechanical rooms or where subject to moisture or weather.
> [!quote] Joel Jansen 2026-03-10 (pp.) > [!quote] Joel Jansen 2026-03-10 (pp.)
> > Assume LFMC.
[^1]: I feel fairly confident this is erroneous. [^1]: I feel fairly confident this is erroneous.
+2 -1
View File
@@ -18,7 +18,8 @@ yearly: "[[2026]]"
--- ---
# 2026-03-18 11:31:07 # 2026-03-18 11:31:07
Takeoff directive for [[charlotte-south-end-hotel]]: Takeoff directive for [[charlotte-south-end-hotel]]
from [[joel-jansen]]:
## Feeder Length Rounding ## Feeder Length Rounding
+3 -3
View File
@@ -21,7 +21,7 @@ yearly: "[[2026]]"
## Pre-Takeoff Email Template Meeting ## Pre-Takeoff Email Template Meeting
Meeting lead by Josh Ford Meeting lead by [[josh-ford]]
to discuss acceptable use of [[conest-pre-takeoff-email-template]]. to discuss acceptable use of [[conest-pre-takeoff-email-template]].
### Topics ### Topics
@@ -44,7 +44,7 @@ an area the OneNote is poor in.
*** ***
Direction from Aaron to improve turnaround Direction from [[aaron-permuy]] to improve turnaround
while maintaining standards while maintaining standards
including presentability of information; including presentability of information;
raise issues with missing BPM tasks ASAP raise issues with missing BPM tasks ASAP
@@ -73,7 +73,7 @@ Intent is to have conversations before contract
There will be bad estimates, bad proposals, There will be bad estimates, bad proposals,
but ConEst's role is to prevent PDI _from making bad deals_ but ConEst's role is to prevent PDI _from making bad deals_
> [!quote] Joel Jansen, pp. > [!quote] [[joel-jansen]], pp.
> Similar could be said by Ops about ConEst. > Similar could be said by Ops about ConEst.
> ~~They have more time than us~~ > ~~They have more time than us~~
+1 -1
View File
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
Follow-up to [[2026-03-19_09-00-43]] Follow-up to [[2026-03-19_09-00-43]]
> [!quote] Josh Ford @ 2026-03-20 09:10 via Outlook > [!quote] [[josh-ford]] @ 2026-03-20 09:10 via Outlook
> Good Morning, Team, > Good Morning, Team,
> >
> Following up from our meeting yesterday. > Following up from our meeting yesterday.
+1 -1
View File
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
Relevant to [[fire-alarm-takeoff]], Relevant to [[fire-alarm-takeoff]],
while reviewing my takeoff for [[1990-k-street]] while reviewing my takeoff for [[1990-k-street]]
Joel had to fix the assemblies I used for unit smoke detectors. [[joel-jansen]] had to fix the assemblies I used for unit smoke detectors.
Unit plans show combo smoke/CO detectors in all cases, Unit plans show combo smoke/CO detectors in all cases,
but bedroom smokes are to be smoke only but bedroom smokes are to be smoke only
+1 -1
View File
@@ -18,7 +18,7 @@ yearly: "[[2026]]"
--- ---
# 2026-03-23 12:48:49 # 2026-03-23 12:48:49
Joel asked me to give feedback on the project engineer [[joel-jansen]] asked me to give feedback on the project engineer
I've had shadowing and helping me on [[charlotte-south-end-hotel]]. I've had shadowing and helping me on [[charlotte-south-end-hotel]].
They've been exceptionally engaged, They've been exceptionally engaged,
+1 -1
View File
@@ -33,7 +33,7 @@ Strictly speaking, requirements for communications wiring
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]]) (governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
are minimal. are minimal.
> [!quote] Joel Jansen 2026-03-24 (pp.) > [!quote] [[joel-jansen]] 2026-03-24 (pp.)
> If rough-in for Telecom or a Low Voltage system is included, > If rough-in for Telecom or a Low Voltage system is included,
> even if qualified as "free-air per code" or similar, > even if qualified as "free-air per code" or similar,
> always provide backboxes and conduit stub-ups for outlets > always provide backboxes and conduit stub-ups for outlets
+3 -2
View File
@@ -21,7 +21,8 @@ yearly: "[[2026]]"
## BPM Tasks Meeting ## BPM Tasks Meeting
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]] Meeting lead by [[josh-ford]]
regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
for [[pdi-pre-takeoff-confirmation]]: for [[pdi-pre-takeoff-confirmation]]:
Intent is to reduce WBS turnaround, Intent is to reduce WBS turnaround,
@@ -45,7 +46,7 @@ and it is not already open (or completed) in BPM.
If all necessary tasks are open or completed: If all necessary tasks are open or completed:
"No tasks missing." "No tasks missing."
Prompted by Joel, Prompted by [[joel-jansen]],
Josh clarified that "... Raceway Design" tasks Josh clarified that "... Raceway Design" tasks
are not necessary for Low Voltage, Telecom systems, are not necessary for Low Voltage, Telecom systems,
only Public Safety DAS. only Public Safety DAS.
+2 -2
View File
@@ -21,8 +21,8 @@ yearly: "[[2026]]"
Follow-up to [[2026-03-20_13-44-59#2026-03-20 13:44:59]]. Follow-up to [[2026-03-20_13-44-59#2026-03-20 13:44:59]].
Comments by Joel Jansen Comments by [[joel-jansen]]
Relevant to my takeoff for [[1990-k-street]]: relevant to my takeoff for [[1990-k-street]]:
### Lighting Control Assemblies ### Lighting Control Assemblies
+2 -2
View File
@@ -21,14 +21,14 @@ yearly: "[[2026]]"
## 1990 K Street ConEst Manager Review ## 1990 K Street ConEst Manager Review
ConEst Manager Review for [[1990-k-street]] ConEst Manager Review for [[1990-k-street]]
lead by Josh Ford and Joel Jansen lead by Josh Ford and [[joel-jansen]]
### Purpose of ConEst Manager Review ### Purpose of ConEst Manager Review
Josh explains purpose of this review to PE Josh explains purpose of this review to PE
Jobs below 12% margin Jobs below 12% margin
are reviewed further with Corwin Fluitt are reviewed further with [[corwin-fluit]]
who is able and authorized who is able and authorized
to "make judgement calls" on pricing concerns to "make judgement calls" on pricing concerns
in order to get GP to an acceptable number. in order to get GP to an acceptable number.
+1 -1
View File
@@ -60,7 +60,7 @@ require communication systems per
> redundant with the standard takeoff described above. > redundant with the standard takeoff described above.
> These assemblies can be ignored > These assemblies can be ignored
> unless given specific direction otherwise. > unless given specific direction otherwise.
> Confirmed by Joel Jansen 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]]. > Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...` `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`
+2 -2
View File
@@ -75,7 +75,7 @@ Used in lieu of individual split systems.
### Dedicated Circuit Receptacles ### Dedicated Circuit Receptacles
> [!quote] Joel Jansen 2025-11-11, pp. > [!quote] [[joel-jansen]] 2025-11-11, pp.
> >
> For N5-15R/N5-20R receptacles serving fixed equipment such as: > For N5-15R/N5-20R receptacles serving fixed equipment such as:
> >
@@ -100,7 +100,7 @@ Used in lieu of individual split systems.
### Dishwasher/Disposal Receptacles ### Dishwasher/Disposal Receptacles
> [!quote] Joel Jansen 2026-01-12 in Reference to [[woodbrook]] (pp.)[^1] > [!quote] [[joel-jansen]] 2026-01-12 in Reference to [[woodbrook]] (pp.)[^1]
> Even when drawings show 2 separate duplex receptacles, > Even when drawings show 2 separate duplex receptacles,
> use `DW & DISPOSAL DUAL CIR - ...`, > use `DW & DISPOSAL DUAL CIR - ...`,
> which includes only one receptacle. > which includes only one receptacle.
+3 -3
View File
@@ -124,10 +124,10 @@ may be routed through with special permission.
[[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]] [[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]]
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.) > [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> No affect on takeoff. Routing in slab still possible. > No affect on takeoff. Routing in slab still possible.
> [!cite] Joel Jansen 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.) > [!cite] [[joel-jansen]] 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> PT slabs do have some affect on takeoff. > PT slabs do have some affect on takeoff.
> 3in conduit can not be run in an 11in PT slab. > 3in conduit can not be run in an 11in PT slab.
@@ -135,7 +135,7 @@ may be routed through with special permission.
[[construction-methods#Pan Deck Slab|Pan Deck Slab]] [[construction-methods#Pan Deck Slab|Pan Deck Slab]]
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.) > [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> Do not route in slab. > Do not route in slab.
### MC Cable Overhead ### MC Cable Overhead