vault backup: 2026-03-30 22:54:00
This commit is contained in:
@@ -38,7 +38,7 @@ is insufficient for [[full-takeoff]].
|
||||
Budget per Unit Count.
|
||||
Compare to Bid Sheet.
|
||||
|
||||
> [!info] Alternate method as described by Joel
|
||||
> [!info] Alternate method as described by [[joel-jansen]]
|
||||
> Takeoff unit risers normally
|
||||
> with Length * 1.5 to cover house panel feeders.
|
||||
|
||||
@@ -54,5 +54,5 @@ See [[switchgear-takeoff#Generator]].
|
||||
|
||||
Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
> [!info] Alternate method as described by Joel
|
||||
> [!info] Alternate method as described by [[joel-jansen]]
|
||||
> Takeoff per [[subfeeds-takeoff]], use average for length.
|
||||
|
||||
+1
-1
@@ -23,7 +23,7 @@ dg-publish: true
|
||||
|
||||
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
|
||||
> [!cite] Joel Jansen, in reference to Omni Hotels Raleigh (pp.)
|
||||
> [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)
|
||||
> It is acceptable to use typicals for identical feeders
|
||||
> (i.e. meter centers fed from bus plugs)
|
||||
> so long as the typical is in `Area` = "01 - Feeders/Risers ...".
|
||||
|
||||
@@ -50,8 +50,8 @@ not especially consistent with the actual install.
|
||||
> This scope is included here for its similarity in content.
|
||||
> It may be more appropriate in [[electrical-takeoff]]
|
||||
|
||||
> [!quote] Joel Jansen 2026-01-20T16:30 (pp.)
|
||||
> Josh Ford prefers it in electrical, but I'm not concerned.
|
||||
> [!quote] [[joel-jansen]] 2026-01-20T16:30 (pp.)
|
||||
> [[josh-ford]] prefers it in electrical, but I'm not concerned.
|
||||
> So long as it's named "Pool Bonding" it's fine.
|
||||
|
||||
1. * `Area` = _Contentious_
|
||||
|
||||
+4
-2
@@ -13,8 +13,10 @@ dg-publish: true
|
||||
# Me-isms
|
||||
|
||||
* (when misunderstood) "No, no, no."
|
||||
* certainly
|
||||
* "certainly"
|
||||
* "ought", "ought not"
|
||||
|
||||
## Others-isms
|
||||
|
||||
* "... and stuff."
|
||||
* "Also too ..."
|
||||
*
|
||||
@@ -414,8 +414,7 @@ All 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles in the area
|
||||
* (8) Assisted living facilities
|
||||
|
||||
> [!info] Informational Note No. 1:
|
||||
> This requirement would include receptacles identified as 5-15, 5-20, 6-15, and 6-20 in ANSI/NEMA WD 6-
|
||||
2016, Wiring Devices — Dimensional Specifications.
|
||||
> This requirement would include receptacles identified as 5-15, 5-20, 6-15, and 6-20 in ANSI/NEMA WD 6-2016, Wiring Devices — Dimensional Specifications.
|
||||
|
||||
> [!info] Informational Note No. 2:
|
||||
> Assisted living facilities are Institutional Use Group I-1 per IBC 2015.
|
||||
|
||||
+4
-1
@@ -15,4 +15,7 @@ A package manager is a service that curates software
|
||||
## For Linux
|
||||
|
||||
On Linux machines,
|
||||
package managers are the
|
||||
package managers are the defacto means
|
||||
for installing any software.
|
||||
|
||||
## For Windows
|
||||
|
||||
@@ -229,7 +229,7 @@ delivers high-quality results and takes initiative.
|
||||
|
||||
### Comment
|
||||
|
||||
> [quote] Joel Jansen
|
||||
> [quote] [[joel-jansen]]
|
||||
> Zane has been a great addition to our team in these short few months.
|
||||
> He's shown genuine enthusiasm while learning,
|
||||
> asks the right questions, and has picked up our PDI standards quickly.
|
||||
|
||||
@@ -42,7 +42,7 @@ Clear **Field** for other than the project's [[pdi-building-types|building type]
|
||||
* **Cost/Unit** <- 8.5
|
||||
* **Duration** <- 0.01
|
||||
|
||||
%% Approved by Joel Jansen 2026-02-20 %%
|
||||
%% Approved by [[joel-jansen]] 2026-02-20 %%
|
||||
|
||||
### Garden Style, High Rise
|
||||
|
||||
|
||||
+1
-1
@@ -126,7 +126,7 @@ Does not include finished restaurants
|
||||
* `Area` = "XX - Level XX Retail Building"
|
||||
* `Phase` = "Office Space"
|
||||
|
||||
> [!quote] Joel Jansen to William Bonn 2025-12-05 (pp.)
|
||||
> [!quote] [[joel-jansen]] to William Bonn 2025-12-05 (pp.)
|
||||
> PDI Accubid `Phase` "Office Space"
|
||||
> is normally used for core & shell retail office space
|
||||
|
||||
|
||||
@@ -37,9 +37,9 @@ Paste the completed template content to the body of a new email.
|
||||
* Bid Estimator or Associate Estimator (if applicable)
|
||||
|
||||
**CC:**
|
||||
* Senior Construction Estimator %% Joel %%
|
||||
* ConEst Manager (Josh Ford)
|
||||
* Director of Estimating (Corwin Fluit)
|
||||
* Senior Construction Estimator %% [[joel-jansen]] %%
|
||||
* ConEst Manager ([[josh-ford]])
|
||||
* Director of Estimating ([[corwin-fluit]])
|
||||
* Jessalyn Williams
|
||||
* Other ConEst Estimators (if applicable)
|
||||
|
||||
|
||||
@@ -23,6 +23,14 @@ believed to be implied by the context.
|
||||
One must write with clarity sufficient for an outsider to understand,
|
||||
because the writer will eventually be the outsider.
|
||||
|
||||
In this note and elsewhere
|
||||
I strongly associate the concept of PKM
|
||||
and effective note-taking in general
|
||||
with the use of [hypertext](https://en.wikipedia.org/wiki/Hypertext).
|
||||
Notes you don't reference are useless and,
|
||||
short of reading your entire collection every few weeks,
|
||||
liberal use of links is the best way to increase availability.
|
||||
|
||||
## Getting Started
|
||||
|
||||
Getting started with PKM will feel so intimidating that you'll want to give up,
|
||||
@@ -35,6 +43,35 @@ so you may leave some of those videos feeling like you need to pick up boulderin
|
||||
It speaks to the highly personal nature of PKM that, of these hundreds,
|
||||
there is no consensus larger than two on best practice.
|
||||
|
||||
### My Advice
|
||||
|
||||
#### Write Literally Everything
|
||||
|
||||
Plain text is too cheap to have high standards.
|
||||
Write dumb ideas, write about trivial conversations,
|
||||
write anything you can make two sentences out of.
|
||||
|
||||
When you don't yet know your goals for your vault
|
||||
this is how you figure out how it can help you,
|
||||
but you should never stop doing this.
|
||||
|
||||
I recommend setting up timestamped notes
|
||||
to make this workflow as easy as possible.
|
||||
Naming topics is one of the hardest parts of PKM
|
||||
and the more it can be avoided the better
|
||||
as far as I'm concerned.
|
||||
|
||||
#### Use Version Control
|
||||
|
||||
In service to my preferred method of moving fast and breaking stuff,
|
||||
[[git]] allows me to make massive changes to my vault,
|
||||
including deleting entire files that have gone stale,
|
||||
without fear of regret,
|
||||
because what's lost can always be recovered.
|
||||
|
||||
To get the most benefit out of git,
|
||||
commit your changes at least once a day.
|
||||
|
||||
## See Also
|
||||
|
||||
* [[digital-gardens]]
|
||||
|
||||
+2
-2
@@ -61,7 +61,7 @@ tags:
|
||||
## Chef's Notes
|
||||
|
||||
This recipe has very low [[utility]].
|
||||
It is easily the most complex of all my
|
||||
|
||||
It is easily the most complex of all I've curated,
|
||||
but it has very little to offer in reward.
|
||||
|
||||
%%
|
||||
+1
-1
@@ -32,7 +32,7 @@ Seek additional clarification.
|
||||
|
||||
## Breakdowns
|
||||
|
||||
> [!quote] Joel Jansen 2026-02-02 12:10, while reviewing Howard University East Towers (pp.)
|
||||
> [!quote] [[joel-jansen]] 2026-02-02 12:10, while reviewing Howard University East Towers (pp.)
|
||||
> Match breakdowns of the relevant system,
|
||||
> i.e. don't change breakdowns after taking off
|
||||
> the assembly to be sleeved.
|
||||
|
||||
@@ -55,7 +55,7 @@ dg-publish: true
|
||||
|
||||
2. ==1" to 1-1/2" EMT riser==
|
||||
|
||||
* [ ] TODO: Establish Power Monitoring riser takeoff procedure with Joel and document
|
||||
* [ ] TODO: Establish Power Monitoring riser takeoff procedure with [[joel-jansen]] and document
|
||||
|
||||
## Generator
|
||||
|
||||
|
||||
@@ -27,5 +27,5 @@ timestamp based on my teams message to Joel.
|
||||
> * Coupling Method: Compression coupling or Setscrew coupling.
|
||||
> Setscrew couplings with only single screw per conduit are unacceptable.
|
||||
|
||||
> [!quote] Joel Jansen via Microsoft Teams @ 2025-10-15 09:33 AM
|
||||
> [!quote] [[joel-jansen]] via Microsoft Teams @ 2025-10-15 09:33 AM
|
||||
> use set screw 🙂
|
||||
|
||||
@@ -15,7 +15,9 @@ dg-publish: true
|
||||
|
||||
### Belle Meade Director Review
|
||||
|
||||
[[belle-meade-plaza]]
|
||||
Estimating Director Review for [[belle-meade-plaza]]
|
||||
lead by [[corwin-fluit]],
|
||||
attended by [[joel-jansen]] and myself.
|
||||
|
||||
#### Takeoff Review
|
||||
|
||||
@@ -59,7 +61,7 @@ Joel to add these.
|
||||
|
||||
> [!info] Circuits per Raceway
|
||||
> Corwin stated that---assuming no overriding specification---
|
||||
> up to 6 circuits in a raceway are permissible.
|
||||
> up to 6 circuits per raceway are permissible.
|
||||
|
||||
##### Lighting Control
|
||||
|
||||
|
||||
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
# 2025-11-10 11:14:??
|
||||
|
||||
I was updating my notes,
|
||||
filling in gaps in scripts based on Joel's,
|
||||
filling in gaps in scripts based on [[joel-jansen]]'s,
|
||||
when I noticed a strange paragraph:
|
||||
|
||||
> [!quote] `OneNote`/`Joel Take-off`/`Misc. Notes`
|
||||
|
||||
@@ -18,7 +18,7 @@ dg-publish: true
|
||||
|
||||
%%
|
||||
Transcription of notes
|
||||
taken while reviewing Elliot St. with Joel Jansen.
|
||||
taken while reviewing Elliot St. with [[joel-jansen]].
|
||||
%%
|
||||
|
||||
Adorne USB Heating Designation was built with standard device.
|
||||
|
||||
@@ -12,7 +12,7 @@ dg-publish: true
|
||||
[[2025w51|This week]]
|
||||
William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
|
||||
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
|
||||
Our senior Joel Jansen approved of the method.
|
||||
Our senior [[joel-jansen]] approved of the method.
|
||||
|
||||
I'd like to use the method tentatively for takeoff strictly typical of all units
|
||||
(e.g. master switches, MSDE's, etc.),
|
||||
|
||||
@@ -66,7 +66,7 @@ I would, but I usually extract the schedules anyway
|
||||
so I just use the actual average.
|
||||
|
||||
> Thank you for that.
|
||||
> Joel wagged his finger at me about missing terms this morning---
|
||||
> [[joel-jansen|Joel]] wagged his finger at me about missing terms this morning---
|
||||
> I wanted to see how it's preferred.
|
||||
> I was told terms are captured by feeders/mech connections
|
||||
> and have never added them to panelboards.
|
||||
|
||||
@@ -13,7 +13,8 @@ dg-publish: true
|
||||
|
||||
## 2100 Crystal Drive Takeoff Review
|
||||
|
||||
[[2100-crystal-drive]]
|
||||
Notes on my takeoff for [[2100-crystal-drive]]
|
||||
as reviewed with [[joel-jansen]]:
|
||||
|
||||
### Generators
|
||||
|
||||
|
||||
@@ -10,7 +10,8 @@ dg-publish: true
|
||||
|
||||
## 2100 Crystal Drive Closeout
|
||||
|
||||
[[2100-crystal-drive]]
|
||||
Notes on [[2100-crystal-drive]]
|
||||
as reviewed with [[joel-jansen]]:
|
||||
|
||||
### Extension
|
||||
|
||||
@@ -50,6 +51,8 @@ Joel is having me change them to \#12/2.
|
||||
|
||||
### Labor Plan
|
||||
|
||||
Relevant to [[pdi-labor-plan]]:
|
||||
|
||||
$$
|
||||
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
|
||||
$$
|
||||
|
||||
@@ -17,4 +17,4 @@ Drawings show 2 separate duplex receptacles for dishwasher and disposal
|
||||
Takeoff used `DW & DISPOSAL DUAL CIR - ...`,
|
||||
which includes only one receptacle.
|
||||
|
||||
According to Joel this takeoff is correct for the scenario.
|
||||
According to [[joel-jansen]] this takeoff is correct for the scenario.
|
||||
|
||||
@@ -9,7 +9,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-12 12:23:??
|
||||
|
||||
Travelling with Brian Smarslok and Joel Jansen on [[2026-01-15]]
|
||||
Travelling with Brian Smarslok and [[joel-jansen]] on [[2026-01-15]]
|
||||
to visit [[woodbury-heights|an awarded project]] in New Jersey.
|
||||
Flying from TPA to PHL, departure @ 7:00AM.
|
||||
We'll be meeting with the developer, [Greystar](https://www.greystar.com/).
|
||||
|
||||
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-12 13:02:??
|
||||
|
||||
Joel attributes the [[#GP Variance|apparent variance]]
|
||||
[[joel-jansen]] attributes the [[#GP Variance|apparent variance]]
|
||||
of [[woodbury-heights]] to
|
||||
1. missed Polaris lugs for feeders for one building,
|
||||
2. insufficient budget for equipment rental, and
|
||||
|
||||
@@ -15,6 +15,10 @@ dg-publish: true
|
||||
|
||||
### 2100 Crystal Drive ConEst Manager Review
|
||||
|
||||
ConEst Manager Review for [[2100-crystal-drive]]
|
||||
lead by [[josh-ford]],
|
||||
attended by [[joel-jansen]] and myself.
|
||||
|
||||
#### Josh's Review Order
|
||||
|
||||
1. Backwards from Final Pricing through rest of closeout,
|
||||
|
||||
@@ -14,7 +14,7 @@ dg-publish: true
|
||||
|
||||
Follow-up to [[2026-01-13_11-28-14#Lighting Control]]
|
||||
|
||||
> [!quote] Conversation between Joel Jansen and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]:
|
||||
> [!quote] Conversation between [[joel-jansen]] and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]:
|
||||
>
|
||||
> **Joel:** "It was sold as local."
|
||||
>
|
||||
|
||||
@@ -16,7 +16,7 @@ dg-publish: true
|
||||
|
||||
#### Quote
|
||||
|
||||
> [!quote] Joel Jansen 2026-01-15 13:27 (pp.)
|
||||
> [!quote] [[joel-jansen]] 2026-01-15 13:27 (pp.)
|
||||
> I'd rather have an accurate budget than an accurate BOM.
|
||||
|
||||
#### Context
|
||||
|
||||
@@ -16,7 +16,7 @@ dg-publish: true
|
||||
## Sleeving Takeoff Breakdown Direction
|
||||
|
||||
Updated [[sleeving-takeoff#Breakdowns]]
|
||||
per clarification with Joel.
|
||||
per clarification with [[joel-jansen]].
|
||||
Previous direction below.
|
||||
|
||||
> * `Area` = "01 - Feeders/Risers ..."
|
||||
|
||||
@@ -26,7 +26,7 @@ Anything else?
|
||||
How do they rank in importance?
|
||||
|
||||
Why are other departments so confused about ConEst's purpose?
|
||||
(Ops stakeholder auditing CBOM to Joel: "missing screws")
|
||||
(Ops stakeholder auditing CBOM to [[joel-jansen]]: "missing screws")
|
||||
If we don't know, and Ops doesn't know, who does?
|
||||
That is, who defines our purpose?
|
||||
|
||||
|
||||
@@ -20,7 +20,7 @@ yearly: "[[2026]]"
|
||||
## Mechanical Connection Selection
|
||||
|
||||
Relevant to [[electrical-takeoff]],
|
||||
sourced from Joel Jansen's OneNote Takeoff Notes "Mechanical Connections".
|
||||
sourced from [[joel-jansen]]'s OneNote Takeoff Notes "Mechanical Connections".
|
||||
|
||||
Ben says he has never used any PVC assembly except .../`PVC - ...`.
|
||||
|
||||
|
||||
@@ -20,15 +20,17 @@ yearly: "[[2026]]"
|
||||
|
||||
## Hampton Roads Navy - Norfolk: Director Review
|
||||
|
||||
[[hampton-roads-navy_norfolk]]
|
||||
Director Review of [[hampton-roads-navy_norfolk]].
|
||||
|
||||
### Dramatis Personae
|
||||
|
||||
Director of ConEst: Corwin Fluit
|
||||
Director of ConEst: [[corwin-fluit|Corwin Fluit]]
|
||||
|
||||
Bid Estimator: Christian Pereiro
|
||||
Bid Estimator: [[christian-pereiro|Christian Pereiro]]
|
||||
|
||||
Senior ConEst Estimator: Joel Jansen
|
||||
Senior ConEst Estimator: [[joel-jansen|Joel Jansen]]
|
||||
|
||||
ConEst Estimator: [[zane-meyers|Zane Meyers]]
|
||||
|
||||
### Lighting Control
|
||||
|
||||
|
||||
@@ -17,7 +17,7 @@ yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-20 09:39:20
|
||||
|
||||
A few minutes ago I asked Joel about [[units-takeoff|unit takeoff]],
|
||||
A few minutes ago I asked [[joel-jansen]] about [[units-takeoff|unit takeoff]],
|
||||
specifically if I should provide a GFI for each bathroom
|
||||
even if the receptacles are on the same circuit,
|
||||
which he confirmed.
|
||||
|
||||
@@ -20,7 +20,8 @@ yearly: "[[2026]]"
|
||||
|
||||
## Fire Alarm Wiring Methods
|
||||
|
||||
[[fire-alarm-takeoff]]
|
||||
direction for [[fire-alarm-takeoff]]
|
||||
as confirmed by [[joel-jansen]]:
|
||||
|
||||
> [!quote] Zane Meyers @ 09:35 to Joel Jansen via Teams regarding [[1990-k-street]]
|
||||
> From our Pre-Takeoff email:
|
||||
|
||||
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
|
||||
|
||||
## Trainee Development Scorecard
|
||||
|
||||
[[2026-02-20]]
|
||||
reviewed with [[joel-jansen]] [[2026-02-20]]:
|
||||
|
||||
### Skill: WBS
|
||||
|
||||
|
||||
@@ -19,7 +19,7 @@ yearly: "[[2026]]"
|
||||
|
||||
## Values & Competencies
|
||||
|
||||
Reviewed in-person with Joel Jansen [[2026-03-03]].
|
||||
Reviewed in-person with [[joel-jansen]] [[2026-03-03]].
|
||||
|
||||
Regarding the scoring,
|
||||
Joel stated that in past years,
|
||||
|
||||
@@ -20,6 +20,7 @@ yearly: "[[2026]]"
|
||||
## Charlotte South End Hotel Spec Interpretation
|
||||
|
||||
Spec interpretation notes for [[charlotte-south-end-hotel]]
|
||||
with clarification by [[joel-jansen]]:
|
||||
|
||||
### EMT Fittings
|
||||
|
||||
@@ -54,7 +55,7 @@ No definition is provided for a liquid-tight flexible non-metallic raceway
|
||||
> in mechanical rooms or where subject to moisture or weather.
|
||||
|
||||
> [!quote] Joel Jansen 2026-03-10 (pp.)
|
||||
>
|
||||
> Assume LFMC.
|
||||
|
||||
[^1]: I feel fairly confident this is erroneous.
|
||||
|
||||
|
||||
@@ -18,7 +18,8 @@ yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-03-18 11:31:07
|
||||
|
||||
Takeoff directive for [[charlotte-south-end-hotel]]:
|
||||
Takeoff directive for [[charlotte-south-end-hotel]]
|
||||
from [[joel-jansen]]:
|
||||
|
||||
## Feeder Length Rounding
|
||||
|
||||
|
||||
@@ -21,7 +21,7 @@ yearly: "[[2026]]"
|
||||
|
||||
## Pre-Takeoff Email Template Meeting
|
||||
|
||||
Meeting lead by Josh Ford
|
||||
Meeting lead by [[josh-ford]]
|
||||
to discuss acceptable use of [[conest-pre-takeoff-email-template]].
|
||||
|
||||
### Topics
|
||||
@@ -44,7 +44,7 @@ an area the OneNote is poor in.
|
||||
|
||||
***
|
||||
|
||||
Direction from Aaron to improve turnaround
|
||||
Direction from [[aaron-permuy]] to improve turnaround
|
||||
while maintaining standards
|
||||
including presentability of information;
|
||||
raise issues with missing BPM tasks ASAP
|
||||
@@ -73,7 +73,7 @@ Intent is to have conversations before contract
|
||||
There will be bad estimates, bad proposals,
|
||||
but ConEst's role is to prevent PDI _from making bad deals_
|
||||
|
||||
> [!quote] Joel Jansen, pp.
|
||||
> [!quote] [[joel-jansen]], pp.
|
||||
> Similar could be said by Ops about ConEst.
|
||||
> ~~They have more time than us~~
|
||||
|
||||
|
||||
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
|
||||
|
||||
Follow-up to [[2026-03-19_09-00-43]]
|
||||
|
||||
> [!quote] Josh Ford @ 2026-03-20 09:10 via Outlook
|
||||
> [!quote] [[josh-ford]] @ 2026-03-20 09:10 via Outlook
|
||||
> Good Morning, Team,
|
||||
>
|
||||
> Following up from our meeting yesterday.
|
||||
|
||||
@@ -22,7 +22,7 @@ yearly: "[[2026]]"
|
||||
|
||||
Relevant to [[fire-alarm-takeoff]],
|
||||
while reviewing my takeoff for [[1990-k-street]]
|
||||
Joel had to fix the assemblies I used for unit smoke detectors.
|
||||
[[joel-jansen]] had to fix the assemblies I used for unit smoke detectors.
|
||||
|
||||
Unit plans show combo smoke/CO detectors in all cases,
|
||||
but bedroom smokes are to be smoke only
|
||||
|
||||
@@ -18,7 +18,7 @@ yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-03-23 12:48:49
|
||||
|
||||
Joel asked me to give feedback on the project engineer
|
||||
[[joel-jansen]] asked me to give feedback on the project engineer
|
||||
I've had shadowing and helping me on [[charlotte-south-end-hotel]].
|
||||
|
||||
They've been exceptionally engaged,
|
||||
|
||||
@@ -33,7 +33,7 @@ Strictly speaking, requirements for communications wiring
|
||||
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
|
||||
are minimal.
|
||||
|
||||
> [!quote] Joel Jansen 2026-03-24 (pp.)
|
||||
> [!quote] [[joel-jansen]] 2026-03-24 (pp.)
|
||||
> If rough-in for Telecom or a Low Voltage system is included,
|
||||
> even if qualified as "free-air per code" or similar,
|
||||
> always provide backboxes and conduit stub-ups for outlets
|
||||
|
||||
@@ -21,7 +21,8 @@ yearly: "[[2026]]"
|
||||
|
||||
## BPM Tasks Meeting
|
||||
|
||||
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
||||
Meeting lead by [[josh-ford]]
|
||||
regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
||||
for [[pdi-pre-takeoff-confirmation]]:
|
||||
|
||||
Intent is to reduce WBS turnaround,
|
||||
@@ -45,7 +46,7 @@ and it is not already open (or completed) in BPM.
|
||||
If all necessary tasks are open or completed:
|
||||
"No tasks missing."
|
||||
|
||||
Prompted by Joel,
|
||||
Prompted by [[joel-jansen]],
|
||||
Josh clarified that "... Raceway Design" tasks
|
||||
are not necessary for Low Voltage, Telecom systems,
|
||||
only Public Safety DAS.
|
||||
|
||||
@@ -21,8 +21,8 @@ yearly: "[[2026]]"
|
||||
|
||||
Follow-up to [[2026-03-20_13-44-59#2026-03-20 13:44:59]].
|
||||
|
||||
Comments by Joel Jansen
|
||||
Relevant to my takeoff for [[1990-k-street]]:
|
||||
Comments by [[joel-jansen]]
|
||||
relevant to my takeoff for [[1990-k-street]]:
|
||||
|
||||
### Lighting Control Assemblies
|
||||
|
||||
|
||||
@@ -21,14 +21,14 @@ yearly: "[[2026]]"
|
||||
## 1990 K Street ConEst Manager Review
|
||||
|
||||
ConEst Manager Review for [[1990-k-street]]
|
||||
lead by Josh Ford and Joel Jansen
|
||||
lead by Josh Ford and [[joel-jansen]]
|
||||
|
||||
### Purpose of ConEst Manager Review
|
||||
|
||||
Josh explains purpose of this review to PE
|
||||
|
||||
Jobs below 12% margin
|
||||
are reviewed further with Corwin Fluitt
|
||||
are reviewed further with [[corwin-fluit]]
|
||||
who is able and authorized
|
||||
to "make judgement calls" on pricing concerns
|
||||
in order to get GP to an acceptable number.
|
||||
|
||||
+1
-1
@@ -60,7 +60,7 @@ require communication systems per
|
||||
> redundant with the standard takeoff described above.
|
||||
> These assemblies can be ignored
|
||||
> unless given specific direction otherwise.
|
||||
> Confirmed by Joel Jansen 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
|
||||
> Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
|
||||
|
||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`
|
||||
|
||||
|
||||
+2
-2
@@ -75,7 +75,7 @@ Used in lieu of individual split systems.
|
||||
|
||||
### Dedicated Circuit Receptacles
|
||||
|
||||
> [!quote] Joel Jansen 2025-11-11, pp.
|
||||
> [!quote] [[joel-jansen]] 2025-11-11, pp.
|
||||
>
|
||||
> For N5-15R/N5-20R receptacles serving fixed equipment such as:
|
||||
>
|
||||
@@ -100,7 +100,7 @@ Used in lieu of individual split systems.
|
||||
|
||||
### Dishwasher/Disposal Receptacles
|
||||
|
||||
> [!quote] Joel Jansen 2026-01-12 in Reference to [[woodbrook]] (pp.)[^1]
|
||||
> [!quote] [[joel-jansen]] 2026-01-12 in Reference to [[woodbrook]] (pp.)[^1]
|
||||
> Even when drawings show 2 separate duplex receptacles,
|
||||
> use `DW & DISPOSAL DUAL CIR - ...`,
|
||||
> which includes only one receptacle.
|
||||
|
||||
@@ -124,10 +124,10 @@ may be routed through with special permission.
|
||||
|
||||
[[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]]
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> No affect on takeoff. Routing in slab still possible.
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> PT slabs do have some affect on takeoff.
|
||||
> 3in conduit can not be run in an 11in PT slab.
|
||||
|
||||
@@ -135,7 +135,7 @@ may be routed through with special permission.
|
||||
|
||||
[[construction-methods#Pan Deck Slab|Pan Deck Slab]]
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||
> Do not route in slab.
|
||||
|
||||
### MC Cable Overhead
|
||||
|
||||