vault backup: 2025-09-29 13:43:57
This commit is contained in:
Vendored
+1
-1
@@ -16,7 +16,7 @@
|
||||
"slash-command": false,
|
||||
"editor-status": true,
|
||||
"bookmarks": true,
|
||||
"markdown-importer": false,
|
||||
"markdown-importer": true,
|
||||
"zk-prefixer": false,
|
||||
"random-note": false,
|
||||
"outline": true,
|
||||
|
||||
Vendored
+9
-1
@@ -33,5 +33,13 @@
|
||||
"key": "ArrowDown"
|
||||
}
|
||||
],
|
||||
"editor:toggle-checklist-status": []
|
||||
"editor:toggle-checklist-status": [],
|
||||
"obsidian-linter:lint-file": [
|
||||
{
|
||||
"modifiers": [
|
||||
"Mod"
|
||||
],
|
||||
"key": "S"
|
||||
}
|
||||
]
|
||||
}
|
||||
+116
-116
@@ -1,20 +1,132 @@
|
||||
{
|
||||
"recentFiles": [
|
||||
{
|
||||
"basename": "full-takeoff",
|
||||
"path": "full-takeoff.md"
|
||||
"basename": "estimating-methodologies",
|
||||
"path": "estimating-methodologies.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-ergonomics",
|
||||
"path": "estimating-ergonomics.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-detail",
|
||||
"path": "estimating-detail.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-culture",
|
||||
"path": "estimating-culture.md"
|
||||
},
|
||||
{
|
||||
"basename": "electrical-estimators-manual",
|
||||
"path": "electrical-estimators-manual.md"
|
||||
},
|
||||
{
|
||||
"basename": "electrical-estimating-methods",
|
||||
"path": "electrical-estimating-methods.md"
|
||||
},
|
||||
{
|
||||
"basename": "electrical",
|
||||
"path": "electrical.md"
|
||||
},
|
||||
{
|
||||
"basename": "distributed-antenna-systems",
|
||||
"path": "distributed-antenna-systems.md"
|
||||
},
|
||||
{
|
||||
"basename": "design-build-budget",
|
||||
"path": "design-build-budget.md"
|
||||
},
|
||||
{
|
||||
"basename": "breakdowns",
|
||||
"path": "breakdowns.md"
|
||||
},
|
||||
{
|
||||
"basename": "calibration-questions",
|
||||
"path": "calibration-questions.md"
|
||||
},
|
||||
{
|
||||
"basename": "construction-estimating",
|
||||
"path": "construction-estimating.md"
|
||||
},
|
||||
{
|
||||
"basename": "construction-estimating-using-excel",
|
||||
"path": "construction-estimating-using-excel.md"
|
||||
},
|
||||
{
|
||||
"basename": "automating-email",
|
||||
"path": "automating-email.md"
|
||||
},
|
||||
{
|
||||
"basename": "assembly-philosophy",
|
||||
"path": "assembly-philosophy.md"
|
||||
},
|
||||
{
|
||||
"basename": "assembly-objects",
|
||||
"path": "assembly-objects.md"
|
||||
},
|
||||
{
|
||||
"basename": "area-of-refuge",
|
||||
"path": "area-of-refuge.md"
|
||||
},
|
||||
{
|
||||
"basename": "ai-in-estimating",
|
||||
"path": "ai-in-estimating.md"
|
||||
},
|
||||
{
|
||||
"basename": "accubid-setup",
|
||||
"path": "accubid-setup.md"
|
||||
},
|
||||
{
|
||||
"basename": "2025-07-18_estimating-isnt-engineering",
|
||||
"path": "2025-07-18_estimating-isnt-engineering.md"
|
||||
},
|
||||
{
|
||||
"basename": "90-day-performance-review",
|
||||
"path": "90-day-performance-review.md"
|
||||
},
|
||||
{
|
||||
"basename": "3-phase-power",
|
||||
"path": "3-phase-power.md"
|
||||
},
|
||||
{
|
||||
"basename": "construction-estimating-software",
|
||||
"path": "construction-estimating-software.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-as-code",
|
||||
"path": "estimating-as-code.md"
|
||||
},
|
||||
{
|
||||
"basename": "birds",
|
||||
"path": "birds.md"
|
||||
},
|
||||
{
|
||||
"basename": "favorite-quotes",
|
||||
"path": "favorite-quotes.md"
|
||||
},
|
||||
{
|
||||
"basename": "pre-takeoff-confirmation",
|
||||
"path": "pre-takeoff-confirmation.md"
|
||||
},
|
||||
{
|
||||
"basename": "burndy_AYP300",
|
||||
"path": "Assets/subfeeds/burndy_AYP300.png"
|
||||
},
|
||||
{
|
||||
"basename": "birds",
|
||||
"path": "birds.md"
|
||||
"basename": "location-vs-scope",
|
||||
"path": "Excalidraw/location-vs-scope.md"
|
||||
},
|
||||
{
|
||||
"basename": "standalone-systems",
|
||||
"path": "standalone-systems.md"
|
||||
},
|
||||
{
|
||||
"basename": "full-takeoff",
|
||||
"path": "full-takeoff.md"
|
||||
},
|
||||
{
|
||||
"basename": "feeders",
|
||||
"path": "feeders.md"
|
||||
},
|
||||
{
|
||||
"basename": "README",
|
||||
@@ -24,30 +136,6 @@
|
||||
"basename": "grounding",
|
||||
"path": "grounding.md"
|
||||
},
|
||||
{
|
||||
"basename": "feeders",
|
||||
"path": "feeders.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-as-code",
|
||||
"path": "estimating-as-code.md"
|
||||
},
|
||||
{
|
||||
"basename": "construction-estimating-software",
|
||||
"path": "construction-estimating-software.md"
|
||||
},
|
||||
{
|
||||
"basename": "3-phase-power",
|
||||
"path": "3-phase-power.md"
|
||||
},
|
||||
{
|
||||
"basename": "90-day-performance-review",
|
||||
"path": "90-day-performance-review.md"
|
||||
},
|
||||
{
|
||||
"basename": "breakdowns",
|
||||
"path": "breakdowns.md"
|
||||
},
|
||||
{
|
||||
"basename": "functional-estimating",
|
||||
"path": "functional-estimating.md"
|
||||
@@ -76,18 +164,10 @@
|
||||
"basename": "traditional-estimating-methods",
|
||||
"path": "traditional-estimating-methods.md"
|
||||
},
|
||||
{
|
||||
"basename": "standalone-systems",
|
||||
"path": "standalone-systems.md"
|
||||
},
|
||||
{
|
||||
"basename": "sleeving",
|
||||
"path": "sleeving.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-methodologies",
|
||||
"path": "estimating-methodologies.md"
|
||||
},
|
||||
{
|
||||
"basename": "realism-vs-instrumentalism",
|
||||
"path": "realism-vs-instrumentalism.md"
|
||||
@@ -100,26 +180,10 @@
|
||||
"basename": "automating-estimating-project-creation",
|
||||
"path": "automating-estimating-project-creation.md"
|
||||
},
|
||||
{
|
||||
"basename": "automating-email",
|
||||
"path": "automating-email.md"
|
||||
},
|
||||
{
|
||||
"basename": "assembly-philosophy",
|
||||
"path": "assembly-philosophy.md"
|
||||
},
|
||||
{
|
||||
"basename": "assembly-objects",
|
||||
"path": "assembly-objects.md"
|
||||
},
|
||||
{
|
||||
"basename": "breakdown-objects",
|
||||
"path": "breakdown-objects.md"
|
||||
},
|
||||
{
|
||||
"basename": "pre-takeoff-confirmation",
|
||||
"path": "pre-takeoff-confirmation.md"
|
||||
},
|
||||
{
|
||||
"basename": "subfeeds",
|
||||
"path": "subfeeds.md"
|
||||
@@ -128,10 +192,6 @@
|
||||
"basename": "project-setup",
|
||||
"path": "project-setup.md"
|
||||
},
|
||||
{
|
||||
"basename": "2025-07-18_estimating-isnt-engineering",
|
||||
"path": "2025-07-18_estimating-isnt-engineering.md"
|
||||
},
|
||||
{
|
||||
"basename": "markdown-formatter-cli",
|
||||
"path": "markdown-formatter-cli.md"
|
||||
@@ -139,66 +199,6 @@
|
||||
{
|
||||
"basename": "separating-estimating-concerns",
|
||||
"path": "separating-estimating-concerns.md"
|
||||
},
|
||||
{
|
||||
"basename": "project-info",
|
||||
"path": "project-info.md"
|
||||
},
|
||||
{
|
||||
"basename": "pathfinding",
|
||||
"path": "pathfinding.md"
|
||||
},
|
||||
{
|
||||
"basename": "feeder-sizing",
|
||||
"path": "feeder-sizing.md"
|
||||
},
|
||||
{
|
||||
"basename": "estimating-ergonomics",
|
||||
"path": "estimating-ergonomics.md"
|
||||
},
|
||||
{
|
||||
"basename": "calibration-questions",
|
||||
"path": "calibration-questions.md"
|
||||
},
|
||||
{
|
||||
"basename": "bpm-award-analysis",
|
||||
"path": "bpm-award-analysis.md"
|
||||
},
|
||||
{
|
||||
"basename": "ai-in-estimating",
|
||||
"path": "ai-in-estimating.md"
|
||||
},
|
||||
{
|
||||
"basename": "misc-budgets",
|
||||
"path": "misc-budgets.md"
|
||||
},
|
||||
{
|
||||
"basename": "fire-alarm",
|
||||
"path": "fire-alarm.md"
|
||||
},
|
||||
{
|
||||
"basename": "distributed-antenna-systems",
|
||||
"path": "distributed-antenna-systems.md"
|
||||
},
|
||||
{
|
||||
"basename": "area-of-refuge",
|
||||
"path": "area-of-refuge.md"
|
||||
},
|
||||
{
|
||||
"basename": "lightning-protection",
|
||||
"path": "lightning-protection.md"
|
||||
},
|
||||
{
|
||||
"basename": "fixture-designations",
|
||||
"path": "fixture-designations.md"
|
||||
},
|
||||
{
|
||||
"basename": "fixtures",
|
||||
"path": "fixtures.md"
|
||||
},
|
||||
{
|
||||
"basename": "construction-estimating",
|
||||
"path": "construction-estimating.md"
|
||||
}
|
||||
],
|
||||
"omittedPaths": [],
|
||||
|
||||
@@ -1,3 +1,10 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- topic/other
|
||||
- status/fleeting
|
||||
---
|
||||
# Birds I've Seen Around Here
|
||||
|
||||
## [Order _Pelecaniformes_](https://en.wikipedia.org/wiki/Pelecaniformes)
|
||||
|
||||
@@ -1,4 +1,6 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- topic/estimating
|
||||
- topic/software
|
||||
|
||||
@@ -35,8 +35,9 @@ With intelligent work breakdown, jobs can be cleanly segmented for work in paral
|
||||
Estimators working in the same room can be an invaluable resource
|
||||
for brainstorming ideas and beneficial conversation.
|
||||
|
||||
It is the failure of [[estimating-culture]] and of [[construction-estimating-software]]
|
||||
that so many estimators are wary of collaboration
|
||||
It is the failure of [[estimating-culture]]
|
||||
and of [[construction-estimating-software]]
|
||||
that so many estimators are wary of collaboration.
|
||||
|
||||
The value of a second set of eyes can not be overstated.
|
||||
|
||||
|
||||
@@ -6,28 +6,24 @@ tags:
|
||||
---
|
||||
# Estimating Detail
|
||||
|
||||
In [[construction-estimating]], the acceptable level of detail of an estimate is a contentious subject.
|
||||
The acceptable level of detail of an [[construction-estimating|estimate]] is a contentious subject.
|
||||
What's worse, estimators often disagree on what makes an estimate more detailed than another.
|
||||
With our [[risk-oriented-estimating]] approach,
|
||||
detail is essentially the inverse of epistemic [[uncertainty]].
|
||||
|
||||
That said, the correct answer is this.
|
||||
The commonly repeated answer is this:
|
||||
|
||||
> As detailed as possible, given required turnaround and available estimating resources.
|
||||
|
||||
%%
|
||||
TODO: This analysis is not much better than the common belief.
|
||||
A commonality of both is the implication that more time ought to be preferred,
|
||||
This analysis is flawed
|
||||
because it implies more time ought to be preferred,
|
||||
when the reality is that when considering larger organizational factors (strategy),
|
||||
ideal estimate certainty is likely far lower than most expect.
|
||||
|
||||
The _correct_ correct answer involves optimizing for these factors:
|
||||
* value of increased bid certainty
|
||||
* value of increased estimate volume
|
||||
%%
|
||||
|
||||
An estimate's detail is irrelevant to its quality.
|
||||
A less detailed estimate is a more [[risk]]y bid,
|
||||
A less detailed estimate is a more [[risk|risky]] bid,
|
||||
but **it is not the role of the estimator to determine acceptable risk**.
|
||||
|
||||
## Experiment
|
||||
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- status/fleeting
|
||||
---
|
||||
# Favorite Quotes
|
||||
|
||||
## About Tools
|
||||
|
||||
+21
-12
@@ -21,10 +21,10 @@ may be routed through with special permission.
|
||||
> STRUCTURAL SLAB IS AN 8-INCH THICK
|
||||
> UNBONDED POST-TENSIONED TWO-WAY SLAB UNLESS NOTED OTHERWISE.
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza, pp.
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza (pp.)
|
||||
> No affect on takeoff. Routing in slab still possible.
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-21, in reference to Belle Meade Plaza, pp.
|
||||
> [!cite] Joel Jansen 2025-08-21, in reference to Belle Meade Plaza (pp.)
|
||||
> PT slabs do have some affect on takeoff.
|
||||
> 3in conduit can not be run in an 11in PT slab.
|
||||
|
||||
@@ -34,15 +34,27 @@ may be routed through with special permission.
|
||||
> STRUCTURAL SLAB IS 3 1/2 INCHES OF NORMALWEIGHT CONCRETE
|
||||
> ON 3-INCH COMPOSITE STEEL DECK UNLESS NOTED OTHERWISE.
|
||||
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza, pp.
|
||||
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza (pp.)
|
||||
> Do not route in slab.
|
||||
|
||||
#### Fire Rated Feeders
|
||||
|
||||
PDI estimating practice is to run all "emergency" feeds
|
||||
(life-safety or just standby)
|
||||
in a 2-hour rated assembly.
|
||||
This usually requires no change to takeoff for high-rises
|
||||
since electrical riser rooms are themselves fire-rated.
|
||||
|
||||
* RHW-2 insulated conductors in conduit -- "Lifeline Cable"
|
||||
* 2-hour rated metal clad cable -- "Vitalink"
|
||||
|
||||
### Formatting
|
||||
|
||||
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
|
||||
> [!cite] Joel Jansen, in reference to Omni Hotels Raleigh, pp.
|
||||
> It is acceptable to use typicals for identical feeders
|
||||
> (i.e. meter centers fed from bus plugs)
|
||||
> so long as the typical is in the Feeders `Area`.
|
||||
|
||||
## Sequence
|
||||
@@ -50,23 +62,20 @@ All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
### 1. Estimate preparation
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Delivery Method (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring method
|
||||
* Conductor material (Aluminum/Copper)
|
||||
* Wiring methods
|
||||
* Conductor material
|
||||
* Wire terminations (set-screw acceptable or compression required?)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
* Routing (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
* Choose a starting point on the riser
|
||||
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
|
||||
* Measure off the length of the feed _ADDERS_
|
||||
* Square corners, use corridors if possible
|
||||
Run parallel to building lines
|
||||
and route through corridors where possible.
|
||||
|
||||
> [!important]
|
||||
> All takeoffs in Systems with names including "site"
|
||||
@@ -84,7 +93,7 @@ Add an additional 5ft (total 15ft) for site runs
|
||||
|
||||
#### Primaries
|
||||
|
||||
Empty conduit.
|
||||
Usually only empty conduit if included.
|
||||
|
||||
#### Secondaries
|
||||
|
||||
|
||||
+5
-2
@@ -11,14 +11,17 @@ tags:
|
||||
This script is intended to cover both electrical and telecom grounding
|
||||
in lieu of detail sufficient for standard takeoff (e.g. a grounding riser).
|
||||
|
||||
Note that the material provided in this system
|
||||
is intended to be budgetary,
|
||||
Note that the material provided in this system is intended to be budgetary,
|
||||
not especially consistent with the actual install.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
Locate:
|
||||
* Main electric room (service entrance)
|
||||
* Remote electric rooms
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
`COMMON ASSEMBLIES`/`GROUNDING`
|
||||
|
||||
@@ -1,3 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Pre-Takeoff Confirmation
|
||||
|
||||
The purpose of the pre-takeoff confirmation
|
||||
|
||||
Reference in New Issue
Block a user