From eacb746f18c87d355c48a82c1298066714a2de2e Mon Sep 17 00:00:00 2001 From: Zane Meyers Date: Thu, 30 Apr 2026 08:36:31 -0400 Subject: [PATCH] vault backup: 2026-04-30 08:36:31 --- consolidate-estimating-thoughts.md | 2 +- heterodoxy.md | 2 +- ...imating-methods.md => orthodox-construction-estimating.md | 0 orthodoxy.md | 5 +++++ timestamped/2026-04-23_18-07-49.md | 2 +- 5 files changed, 8 insertions(+), 3 deletions(-) rename traditional-estimating-methods.md => orthodox-construction-estimating.md (100%) create mode 100644 orthodoxy.md diff --git a/consolidate-estimating-thoughts.md b/consolidate-estimating-thoughts.md index 22bfb0d..1b7e3b3 100644 --- a/consolidate-estimating-thoughts.md +++ b/consolidate-estimating-thoughts.md @@ -63,7 +63,7 @@ Create and use cross-topic notes for complex thoughts: * [[estimating-philosophy]] * [[purpose-of-construction-estimating]] -* [[traditional-estimating-methods]] +* [[orthodox-construction-estimating]] ## Relevant Notes diff --git a/heterodoxy.md b/heterodoxy.md index 6f0601d..0d10d96 100644 --- a/heterodoxy.md +++ b/heterodoxy.md @@ -5,7 +5,7 @@ tags: [] # Heterodoxy **Heterodoxy** refers to beliefs in disagreement -with those of an official (orthodox) position. +with those of an official position ([[orthodoxy]]). [Wikipedia](https://en.wikipedia.org/wiki/Heterodoxy) at first the term has purely religious connotation, diff --git a/traditional-estimating-methods.md b/orthodox-construction-estimating.md similarity index 100% rename from traditional-estimating-methods.md rename to orthodox-construction-estimating.md diff --git a/orthodoxy.md b/orthodoxy.md new file mode 100644 index 0000000..d6cf931 --- /dev/null +++ b/orthodoxy.md @@ -0,0 +1,5 @@ +--- +title: Orthodoxy +tags: [] +--- +# Orthodoxy diff --git a/timestamped/2026-04-23_18-07-49.md b/timestamped/2026-04-23_18-07-49.md index aeacb51..6e91295 100644 --- a/timestamped/2026-04-23_18-07-49.md +++ b/timestamped/2026-04-23_18-07-49.md @@ -15,7 +15,7 @@ I'm less convinced that "detailed takeoff" (for lack of a better term[^1]) could easily be removed from the [[pdi-estimating]] process. -[^1]: See [[traditional-estimating-methods]]. +[^1]: See [[orthodox-construction-estimating]]. Suppose that an ongoing project with 1000 feet of #2 CU in its CBOM