title: Switchgear
---
# Switchgear
[[distribution-equipment]]
## Sequence
### 1. Preparation
1. Initial the OneNote
2. In the drawings, locate:
* Riser Diagrams
* House Panels
### 2. Takeoff
> [!info]
> See [[distribution-equipment]].
1. Build Items in Distribution:
* Panelboards
@@ -49,15 +39,15 @@ When building panelboards/switchboards,
add terminations according to an example from the schedules.
**Do not include feeder terminations.**
Items to Avoid:
* Tap Boxes
* Bus Duct
* Vault Room
* Anything FPL
* Grounding
* Elevator Room
> [!important] Scope to Exclude
> * Tap Boxes
> * Bus Duct
> * Vault Room
> * Anything FPL
> * Grounding
> * Elevator Room
#### SPD's/TVSS's
## SPD's/TVSS's
Labor only.
@@ -66,44 +56,38 @@ Specific item is not important, but I use
(Labor = 1.5hrs)
for consistency.
#### Submeters/Power Monitors
## Submeters/Power Monitors
See [[switchgear#SPD's/TVSS's]]
#### Panelboards
## Panelboards
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
#### Enclosed Circuit Breakers
## Disconnects and Enclosed Circuit Breakers
Treat as disconnect switch.
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`MANUAL DISCONNECTS`/...
#### Generators
## Generators
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
#### Generator Connection Cabinets
## Generator Connection Cabinets
Use a Distribution Panel of equal amps.
Or a transfer switch.
#### Transfer Switches
## Transfer Switches
> "300A ATS"
##### Transfer Switches 1200A+
### Transfer Switches 1200A+
Use 1200A and add an additional `TRANSFER SWITCH` item
to make up the remaining amps.
#### Meter Centers
## Meter Centers
`SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION`
Adjust Factor 1 for meter stacks, delete zeroed items.
### 3. Review
1. Generator
* Ensure takeoff is in the generator Area and System breakdowns
* Put location, quantity, and type on OneNote