title: Switchgear
|
||||
---
|
||||
# Switchgear
|
||||
|
||||
[[distribution-equipment]]
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
|
||||
### 2. Takeoff
|
||||
> [!info]
|
||||
> See [[distribution-equipment]].
|
||||
|
||||
1. Build Items in Distribution:
|
||||
* Panelboards
|
||||
@@ -49,15 +39,15 @@ When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
**Do not include feeder terminations.**
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
> [!important] Scope to Exclude
|
||||
> * Tap Boxes
|
||||
> * Bus Duct
|
||||
> * Vault Room
|
||||
> * Anything FPL
|
||||
> * Grounding
|
||||
> * Elevator Room
|
||||
|
||||
#### SPD's/TVSS's
|
||||
## SPD's/TVSS's
|
||||
|
||||
Labor only.
|
||||
|
||||
@@ -66,44 +56,38 @@ Specific item is not important, but I use
|
||||
(Labor = 1.5hrs)
|
||||
for consistency.
|
||||
|
||||
#### Submeters/Power Monitors
|
||||
## Submeters/Power Monitors
|
||||
|
||||
See [[switchgear#SPD's/TVSS's]]
|
||||
|
||||
#### Panelboards
|
||||
## Panelboards
|
||||
|
||||
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
|
||||
|
||||
#### Enclosed Circuit Breakers
|
||||
## Disconnects and Enclosed Circuit Breakers
|
||||
|
||||
Treat as disconnect switch.
|
||||
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`MANUAL DISCONNECTS`/...
|
||||
|
||||
#### Generators
|
||||
## Generators
|
||||
|
||||
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
|
||||
|
||||
#### Generator Connection Cabinets
|
||||
## Generator Connection Cabinets
|
||||
|
||||
Use a Distribution Panel of equal amps.
|
||||
Or a transfer switch.
|
||||
|
||||
#### Transfer Switches
|
||||
## Transfer Switches
|
||||
|
||||
> "300A ATS"
|
||||
|
||||
##### Transfer Switches 1200A+
|
||||
### Transfer Switches 1200A+
|
||||
|
||||
Use 1200A and add an additional `TRANSFER SWITCH` item
|
||||
to make up the remaining amps.
|
||||
|
||||
#### Meter Centers
|
||||
## Meter Centers
|
||||
|
||||
`SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION`
|
||||
|
||||
Adjust Factor 1 for meter stacks, delete zeroed items.
|
||||
|
||||
### 3. Review
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||
|
||||