- type/philosophy
|
||||
title: Traditional Estimating Methods
|
||||
---
|
||||
# Traditional Estimating Methods
|
||||
# Orthodox Construction Estimating
|
||||
|
||||
Also "single-point estimation"
|
||||
as opposed to the standard three-point.
|
||||
@@ -19,7 +19,7 @@ are those [[construction-estimating]] methods that produce:
|
||||
|
||||
Such methods lack the ability to intelligently express [[uncertainty]].
|
||||
|
||||
### Limitations of Traditional Estimating Methods
|
||||
### Limitations of Orthodox Methods
|
||||
|
||||
Traditional estimating methods,
|
||||
sometimes referred to as "Detailed Takeoff",
|
||||
|
||||