vault backup: 2025-12-17 17:03:56
This commit is contained in:
@@ -1,42 +1,71 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: Consolidate Estimating Thoughts
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/fleeting
|
||||
- status/incomplete
|
||||
- topic/estimating
|
||||
- topic/meta
|
||||
- type/task
|
||||
- authorship/original
|
||||
title: Consolidate Estimating Thoughts
|
||||
---
|
||||
# Consolidate Estimating Thoughts
|
||||
|
||||
My notes on construction estimating
|
||||
are currently disparate, disjointed, and redundant
|
||||
My notes on [[construction-estimating]]
|
||||
are currently disparate, disjointed, and redundant.
|
||||
|
||||
## TODO
|
||||
|
||||
### Legitimate Subtopics
|
||||
|
||||
* [[estimating-methodologies]]
|
||||
* [[construction-estimating-software]]
|
||||
* [[history-of-construction-estimating]]
|
||||
* [[labor-factoring]]
|
||||
|
||||
### New Cross-Topics
|
||||
|
||||
Remove estimating-specific content from irrelevant notes.
|
||||
|
||||
Create and use cross-topic notes for complex thoughts:
|
||||
|
||||
* [[actuarial-science-for-construction-estimating]]
|
||||
* [[risk-oriented-estimating]]
|
||||
|
||||
* [[risk-management-for-construction-estimating]]
|
||||
* [[risk-oriented-estimating]]: resource allocation
|
||||
|
||||
* [[auction-theory-for-construction-estimating]]
|
||||
* [[bid-process-strategy]]
|
||||
|
||||
* [[game-theory-for-construction-estimating]]
|
||||
* [[estimating-culture]]: estimator incentives
|
||||
|
||||
* [[project-management-for-construction-estimating]]
|
||||
* [[separating-estimating-concerns]]
|
||||
|
||||
* [[ambiguity-in-construction-estimating]]
|
||||
|
||||
* [[nontraditional-computing-for-construction-estimating]]
|
||||
* [[optimal-estimating-patterns]]
|
||||
|
||||
* [[object-oriented-programing-for-construction-estimating]]
|
||||
* [[assembly-philosophy]] - pare down
|
||||
* [[software-based-estimating]]
|
||||
* [[optimal-estimating-patterns]]
|
||||
|
||||
* [[statistical-modeling-for-construction-estimating]]
|
||||
|
||||
* [[transparency-in-construction-estimating]]
|
||||
* [[estimating-ethics]]
|
||||
|
||||
### Orphaned Notes
|
||||
|
||||
* [[estimating-philosophy]]
|
||||
* [[purpose-of-construction-estimating]]
|
||||
* [[traditional-estimating-methods]]
|
||||
|
||||
## Relevant Notes
|
||||
|
||||
![[estimating-thoughts.base]]
|
||||
|
||||
## Orphaned Topics
|
||||
|
||||
### Naming Conventions (Use Case vs. Description)
|
||||
|
||||
Related: [[realism-vs-instrumentalism]]
|
||||
|
||||
Naming by use case is intuitive for those without estimating or field experience,
|
||||
but has the side effect that those accustomed to the names
|
||||
will inevitably _treat them as descriptive_.
|
||||
|
||||
| Use Case | Description |
|
||||
| ------------------- | ------------- |
|
||||
| Hi-Hat | Daisy-Chain |
|
||||
| Furnished By Others | Rough-In Only |
|
||||
![[estimating-thoughts.base#fleeting]]
|
||||
|
||||
Reference in New Issue
Block a user