id: risk-oriented-estimating
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent/entry-point
|
||||
- destiny/fleeting
|
||||
- status/incomplete
|
||||
- topic/estimating
|
||||
- topic/risk
|
||||
@@ -37,36 +37,6 @@ of critiquing common practice.
|
||||
|
||||
%%
|
||||
|
||||
## Prioritizing Tasks
|
||||
|
||||
ROE prioritizes estimating tasks by their contribution to _cost certainty_.
|
||||
|
||||
### Estimating as Risk Mitigation
|
||||
|
||||
* reduce risk of wasted estimation effort due to bid loss
|
||||
(prefer lower bid)
|
||||
* reduce risk of project overrun
|
||||
(prefer higher bid)
|
||||
|
||||
Estimating resources are allocated by Return on Mitigation (RoM)
|
||||
|
||||
## Determining Necessary Detail
|
||||
|
||||
ROE determines the appropriate level of [[estimating-detail]]
|
||||
given an organization's [[risk#Risk Tolerance]].
|
||||
|
||||
### EVI Takeoff
|
||||
|
||||
Expected value of information (EVI)
|
||||
|
||||
### Takeoff Optimization
|
||||
|
||||
For systems where EVI analysis determines manual takeoff is still necessary,
|
||||
optimizations can be made to decrease the required effort of takeoff,
|
||||
and thus the opportunity cost of takeoff.
|
||||
|
||||
See [[optimal-estimating-patterns]] for more.
|
||||
|
||||
## Potential Objections
|
||||
|
||||
Objections to the use of historical data in new estimates are not unfounded.
|
||||
|
||||