vault backup: 2025-08-14 17:02:10
This commit is contained in:
+8
-8
@@ -1,5 +1,13 @@
|
|||||||
{
|
{
|
||||||
"recentFiles": [
|
"recentFiles": [
|
||||||
|
{
|
||||||
|
"basename": "feeder-sizing",
|
||||||
|
"path": "feeder-sizing.md"
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"basename": "README",
|
||||||
|
"path": "README.md"
|
||||||
|
},
|
||||||
{
|
{
|
||||||
"basename": "feeders",
|
"basename": "feeders",
|
||||||
"path": "feeders.md"
|
"path": "feeders.md"
|
||||||
@@ -8,10 +16,6 @@
|
|||||||
"basename": "psn-distribution-list",
|
"basename": "psn-distribution-list",
|
||||||
"path": "psn-distribution-list.md"
|
"path": "psn-distribution-list.md"
|
||||||
},
|
},
|
||||||
{
|
|
||||||
"basename": "README",
|
|
||||||
"path": "README.md"
|
|
||||||
},
|
|
||||||
{
|
{
|
||||||
"basename": "estimator-skills",
|
"basename": "estimator-skills",
|
||||||
"path": "estimator-skills.md"
|
"path": "estimator-skills.md"
|
||||||
@@ -195,10 +199,6 @@
|
|||||||
{
|
{
|
||||||
"basename": "telecom",
|
"basename": "telecom",
|
||||||
"path": "telecom.md"
|
"path": "telecom.md"
|
||||||
},
|
|
||||||
{
|
|
||||||
"basename": "software-based-estimating",
|
|
||||||
"path": "software-based-estimating.md"
|
|
||||||
}
|
}
|
||||||
],
|
],
|
||||||
"omittedPaths": [],
|
"omittedPaths": [],
|
||||||
|
|||||||
@@ -0,0 +1,20 @@
|
|||||||
|
---
|
||||||
|
id:
|
||||||
|
aliases: []
|
||||||
|
tags:
|
||||||
|
- status/fleeting
|
||||||
|
---
|
||||||
|
# Feeder Sizing
|
||||||
|
|
||||||
|
> [!cite] 250.122 Size of Equipment Grounding Conductors
|
||||||
|
> **(A) General.** Copper, aluminum, or copper-clad aluminum
|
||||||
|
> equipment grounding conductors of the wire type
|
||||||
|
> shall not be smaller than shown in Table 250.122,
|
||||||
|
> but in no case shall they be required to be larger
|
||||||
|
> than the circuit conductors supplying the equipment...
|
||||||
|
|
||||||
|
Apparently in the 2026 NEC First Draft Meetings,
|
||||||
|
Code Making Panel 5 clarified that the equipment grounding conductor (EGC)
|
||||||
|
never needs to be larger than the largest ungrounded conductor in any raceway
|
||||||
|
when installed in parallel.
|
||||||
|
I can not find a source to verify this.
|
||||||
Reference in New Issue
Block a user