vault backup: 2026-05-05 16:45:34

This commit is contained in:
2026-05-05 16:45:34 -04:00
parent d0527ac4f6
commit f85a71beb4
24 changed files with 1226 additions and 41 deletions
+1 -1
View File
@@ -56,4 +56,4 @@ $$
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
$$
High Rise .110--.120 hr/sqft
High-Rise .110--.120 hr/sqft
+1 -1
View File
@@ -36,7 +36,7 @@ as confirmed by [[joel-jansen]]:
> Confirmed, follow Pre-Takeoff email.
>
> In general,
> for [[pdi-building-types#High Rise|High Rise]] projects,
> for [[pdi-building-types#High Rise|high-rise]] projects,
> assume Free-Air devices will not be allowed
> in other than [[units-takeoff|Units]].
+42
View File
@@ -0,0 +1,42 @@
---
id: 2026-05-05T11:53:09-0400
title: 2026-05-05 11:53:09
tags: []
daily: "[[2026-05-05]]"
---
# 2026-05-05 11:53:09
Direction from [[joel-jansen|Joel]]
on acceptable [[conest|ConEst]] takeoff
for [[emergency-communications-systems]]
received while working on [[hilltop-gardens|Hilltop Gardens]].
## Two-Way Horizontal
Relevant to [[two-way-takeoff]]:
> [!quote] Ben O'Brien's OneNote: Takeoff/(FA RISER + 2-WAY)
> * Horizontal:
> * Length:
> * If shown on Plans (FA/Systems/ etc.)
> * based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer)
> [!quote] [[joel-jansen]] via Microsoft Teams @ 2026-05-05 12:12
> it defaults to elevator lobbies
> when no dedicated area of refuge is defined.
> stairwells they are required for buildings 5 floors
> AND when the inside door of the stair going to the floor locks
> so then they would be required every 5th floor
>
> from our FA team
## DAS Corridor Assemblies
Relevant to [[distributed-antenna-systems-takeoff]]:
> [!quote] [[joel-jansen]] at around 2026-05-05 11:50 (pp.)
> Corridor assemblies are usually only necessary for _cellular_ DAS,
> because Life Safety DAS, especially as designed PDI,
> does not usually require remote antennas.