vault backup: 2026-05-05 16:45:34

This commit is contained in:
2026-05-05 16:45:34 -04:00
parent d0527ac4f6
commit f85a71beb4
24 changed files with 1226 additions and 41 deletions
+13 -14
View File
@@ -17,25 +17,20 @@ up: "[[takeoff-scripts]]"
> `System` = "FA - Two Way Communication"
%%
It's curious we use the longer of FCR to elevator lobbies/FCR to stairwells
rather than just the total length,
since in high-rises _all_ stairwells with locking doors
require communication systems per
[[ibc_s0403#403.5.3.1 Stairway communication system.]]
%%
## Horizontal
1. * `Area` = Same as Fire Command Room
`FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`2-WAY COMMUNICATION = 1" CONDUIT ...`
**Length** = Per drawings if shown, otherwise use longer of
* FCR to elevator lobbies
* FCR to stairwells
**Length** = Per drawings if shown,
otherwise measure from FCR to every elevator lobby.
For [[pdi-building-types#High Rise|high-rise]] buildings,
_also_ measure from the FCR to every stairwell.[^1]
**Count** = Count of elevator lobbies or stairwells (match length)
**Count** = Count of elevator lobbies and stairwells if high-rise (match length)
[^1]: See [[ibc_s0403#403.5.3.1 Stairway communication system.|IBC 403.5.3.1]].
## Vertical
@@ -46,14 +41,18 @@ require communication systems per
* **Length** = 15ft * Count
* **Count** = match Horizontal
> [!important]
> [[sleeving-takeoff]]
## Firefighter Phone System
> [!important]
> These are ICC definition two-way communication systems,
> redundant with the standard takeoff described above.
> These assemblies can be ignored
> unless given specific direction otherwise.
> Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
> unless given specific direction otherwise.[^2]
[^2]: Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`