vault backup: 2026-05-05 16:45:34

This commit is contained in:
2026-05-05 16:45:34 -04:00
parent d0527ac4f6
commit f85a71beb4
24 changed files with 1226 additions and 41 deletions
+2 -1
View File
@@ -24,5 +24,6 @@
"pdf-plus", "pdf-plus",
"copy-document-as-html", "copy-document-as-html",
"templater-obsidian", "templater-obsidian",
"wikipedia-search" "wikipedia-search",
"obsidian-toggle-list"
] ]
+16
View File
@@ -77,5 +77,21 @@
], ],
"key": "S" "key": "S"
} }
],
"obsidian-toggle-list:Progress Checklist-Next": [
{
"modifiers": [
"Alt"
],
"key": "A"
}
],
"obsidian-toggle-list:Progress Checklist-Prev": [
{
"modifiers": [
"Alt"
],
"key": "X"
}
] ]
} }
+40
View File
@@ -0,0 +1,40 @@
{
"pop_state": {
"popon": false,
"hot": false,
"incr": 0
},
"plot": false,
"cmd_list": [
{
"index": 0,
"name": "Progress Checklist",
"tmp_name": "Command 0",
"bindings": [
0
],
"isPopOver": true
}
],
"setup_list": [
{
"index": 0,
"all_states": "* [ ]\n* [/]\n* [x]",
"states": [
"* [ ]",
"* [/]",
"* [x]"
],
"sorteds": [
"* [ ]",
"* [/]",
"* [x]"
],
"states_dict": {}
}
],
"registedCmdName": [
"Progress Checklist-Next",
"Progress Checklist-Prev"
]
}
File diff suppressed because it is too large Load Diff
+10
View File
@@ -0,0 +1,10 @@
{
"id": "obsidian-toggle-list",
"name": "ToggleList",
"version": "1.2.7",
"minAppVersion": "0.15.0",
"description": "Toggle the list/checklist with custom states/prefixes and suffixes",
"author": "Lite C",
"authorUrl": "https://github.com/thingnotok/obsidian-toggle-list/",
"isDesktopOnly": false
}
+10 -1
View File
@@ -14,6 +14,10 @@
"user_scripts_folder": "scripts", "user_scripts_folder": "scripts",
"enable_folder_templates": true, "enable_folder_templates": true,
"folder_templates": [ "folder_templates": [
{
"folder": "timestamped",
"template": "templates/timestamped.md"
},
{ {
"folder": "periodic/daily", "folder": "periodic/daily",
"template": "templates/daily.md" "template": "templates/daily.md"
@@ -54,5 +58,10 @@
"startup_templates": [ "startup_templates": [
"templates/startup.md" "templates/startup.md"
], ],
"intellisense_render": 1 "intellisense_render": 1,
"ignore_folders_on_creation": [
{
"folder": ""
}
]
} }
+1 -1
View File
@@ -7,7 +7,7 @@ up: "[[conest-projects]]"
Project Status: Warranty Project Status: Warranty
Region: DIV-4 Dan Bacon Region: DIV-4 Dan Bacon
Building Type: High Rise Building Type: High-Rise
Contract Type: Design Build Contract Type: Design Build
Units: 454 Units: 454
Square Feet: 545,051 Square Feet: 545,051
+1 -1
View File
@@ -6,7 +6,7 @@ up: "[[conest-projects]]"
--- ---
# 1990 K Street # 1990 K Street
High rise apartment High-rise apartment
## My Role ## My Role
+1 -1
View File
@@ -6,7 +6,7 @@ up: "[[conest-projects]]"
--- ---
# Charlotte South End Hotel # Charlotte South End Hotel
High rise hotel High-rise hotel
[[2026-03-09_15-50-49|Pre-Takeoff Confirmation]] [[2026-03-09_15-50-49|Pre-Takeoff Confirmation]]
+4 -2
View File
@@ -36,7 +36,7 @@ up: "[[takeoff-scripts]]"
* **Length** = _Match Fire Alarm takeoff Length_ * **Length** = _Match Fire Alarm takeoff Length_
* **Count** = _Match Fire Alarm takeoff Count_ * **Count** = _Match Fire Alarm takeoff Count_
### Stairwell Riser Every 2 Floors ### Stairwell Riser (Every 2 Floors)
1. * `Area` = "Typical - Stairwells Building Even Levels" 1. * `Area` = "Typical - Stairwells Building Even Levels"
@@ -64,8 +64,10 @@ Weatherhead for antenna. One per building.
## Horizontal ## Horizontal
> [!important] > [!important]
> Usually only for cellular DAS. > Usually only for cellular DAS.[^1]
> Confirm takeoff requirement with [[pdi-bid-estimating|Bid]]. > Confirm takeoff requirement with [[pdi-bid-estimating|Bid]].
[^1]: [[2026-05-05_11-53-09]]
1. .../`CORRIDORS ...` 1. .../`CORRIDORS ...`
* **Length** = Length measured for every corridor/garage * **Length** = Length measured for every corridor/garage
+1 -1
View File
@@ -36,7 +36,7 @@ All systems currently listed in this note
are described as "two-way communication systems". are described as "two-way communication systems".
Those listed directly below have no overlap: Those listed directly below have no overlap:
* stairway communication systems --- [[ibc_s0403#403.5.3.1 Stairway communication system.|IFC 403.5.3.1]] * stairway communication systems (high-rise only) --- [[ibc_s0403#403.5.3.1 Stairway communication system.|IFC 403.5.3.1]]
* elevator landing communication systems --- [[ibc_s1009#1009.8 Two-way communication.|IFC 1009.8]] * elevator landing communication systems --- [[ibc_s1009#1009.8 Two-way communication.|IFC 1009.8]]
* area of refuge communication systems --- [[ibc_s1009#1009.6.5 Two-way communication.|IFC 1009.6.5]] * area of refuge communication systems --- [[ibc_s1009#1009.6.5 Two-way communication.|IFC 1009.6.5]]
* emergency responder communication coverage system -- [[ifc_s0510#SECTION 510---EMERGENCY RESPONDER RADIO COVERAGE|IFC Section 510]] * emergency responder communication coverage system -- [[ifc_s0510#SECTION 510---EMERGENCY RESPONDER RADIO COVERAGE|IFC Section 510]]
+5 -2
View File
@@ -87,7 +87,7 @@ For each elevator shaft:
> Adjacent elevators may be in the same or parallel shafts. > Adjacent elevators may be in the same or parallel shafts.
> Count the shafts accordingly: > Count the shafts accordingly:
> >
> ``` > ```none
> +-----------------------------+--------------------------------+ > +-----------------------------+--------------------------------+
> | | | > | | |
> | || +--------+ +--------+ || | || +--------+ || +--------+ || | > | || +--------+ +--------+ || | || +--------+ || +--------+ || |
@@ -133,6 +133,9 @@ For each stairwell:
`... RISER` `... RISER`
* **Length** = 10ft * **Length** = 10ft
> [!important]
> [[sleeving-takeoff]]
## Annunciator Panels ## Annunciator Panels
> [!info] Also Known As > [!info] Also Known As
@@ -199,7 +202,7 @@ _Design Build (alternative method):_
> [!info] > [!info]
> Refers to fire, smoke, and combination fire/smoke dampers. > Refers to fire, smoke, and combination fire/smoke dampers.
In [[pdi-building-types#High Rise|high rise construction]], In [[pdi-building-types#High Rise|high-rise construction]],
usually found on every level with units. usually found on every level with units.
> [!tip] > [!tip]
+9 -5
View File
@@ -37,11 +37,15 @@ up: "[[conest-projects]]"
* [x] Backbone * [x] Backbone
* [x] Homeruns * [x] Homeruns
* [-] [[low-voltage-takeoff]] * [-] [[low-voltage-takeoff]]
* [ ] [[fire-alarm-takeoff]] * [x] [[fire-alarm-takeoff]]
* [ ] [[two-way-takeoff]] * [x] [[two-way-takeoff]]
* [ ] [[distributed-antenna-systems-takeoff]] * [?] Stairwells? Elevator lobbies? Both? See [[2026-05-05_11-53-09]].
* [?] [[lightning-protection-takeoff]] * [x] [[distributed-antenna-systems-takeoff]]
* [ ] [[misc-budgets-takeoff]] * [-] Corridor assemblies
* [-] [[lightning-protection-takeoff]]
* Not mentioned in drawings or proposal,
no cost included in Bid Sheet.
* [x] [[misc-budgets-takeoff]]
* [ ] [[temp-power-takeoff]] * [ ] [[temp-power-takeoff]]
## ConEst Questions ## ConEst Questions
+1 -1
View File
@@ -32,7 +32,7 @@ Building elements are noncombustible[^1]
### Type I-A: Protected Fire-Resistive Non-Combustible ### Type I-A: Protected Fire-Resistive Non-Combustible
Common of [[pdi-building-types#High Rise|high rise]] Common of [[pdi-building-types#High Rise|high-rise]]
and [[ibc-occupancy-classifications#Group I Institutional|Group I]] occupancies. and [[ibc-occupancy-classifications#Group I Institutional|Group I]] occupancies.
* 3hr Exterior Walls * 3hr Exterior Walls
+12 -1
View File
@@ -10,6 +10,16 @@ title: SECTION 403---HIGH-RISE BUILDINGS
--- ---
# SECTION 403---HIGH-RISE BUILDINGS # SECTION 403---HIGH-RISE BUILDINGS
%%
> [!quote] [[ibc_ch02]]
> **HIGH-RISE BUILDING.**
> A building with an occupied floor
> located more than 75 feet (22 860 mm)
> above the lowest level of fire department vehicle access.
%%
## 403.1 Applicability. ## 403.1 Applicability.
High-rise buildings shall comply with Sections 403.2 through 403.6. High-rise buildings shall comply with Sections 403.2 through 403.6.
@@ -18,7 +28,8 @@ High-rise buildings shall comply with Sections 403.2 through 403.6.
## 403.4 Emergency systems. ## 403.4 Emergency systems.
The detection, alarm and emergency systems of high-rise buildings shall comply with Sections 403.4.1 through 403.4.8. The detection, alarm and emergency systems of high-rise buildings
shall comply with Sections 403.4.1 through 403.4.8.
%% TODO %% %% TODO %%
+1 -1
View File
@@ -32,7 +32,7 @@ If no quote is available:
* **Downlead locations** = building corners + additional locations * **Downlead locations** = building corners + additional locations
such that downlead spacing is not greater than 100ft such that downlead spacing is not greater than 100ft
* Minimum 10 locations for High Rise * Minimum 10 locations for High-rise
* **Total downlead conduit length** = building height * downlead locations * **Total downlead conduit length** = building height * downlead locations
+1 -1
View File
@@ -17,7 +17,7 @@ and even less for dormitories.
%% TODO %% %% TODO %%
> [!info] > [!info]
> A high rise building has an occupied floor more than 75 feet > A high-rise building has an occupied floor more than 75 feet
> above the lowest level of fire department vehicle access. > above the lowest level of fire department vehicle access.
### Mid Rise ### Mid Rise
+10
View File
@@ -0,0 +1,10 @@
---
id: 2026-05-05
title: 2026-05-05
tags: []
weekly: "[[2026w19]]"
monthly: "[[2026-05]]"
quarterly: "[[2026q2]]"
previous: "[[2026-05-04]]"
---
# 2026-05-05
@@ -34,7 +34,7 @@ but the reader should be assumed not to be especially skeptical.
#### User Story #### User Story
Frank is estimating a 20-story high rise Frank is estimating a 20-story high-rise
and notices that their are roughly, but not exactly, and notices that their are roughly, but not exactly,
the same number of receptacles in the corridors of levels 2 to 19. the same number of receptacles in the corridors of levels 2 to 19.
Frank starts a new takeoff for duplex receptacles, Frank starts a new takeoff for duplex receptacles,
+7 -2
View File
@@ -36,7 +36,7 @@ up: "[[takeoff-scripts]]"
_Garden Style:_ _Garden Style:_
* Takeoff: .../`TEMPORARY POWER - T POLE (EACH)`[^1] * Takeoff: .../`TEMPORARY POWER - T POLE (EACH)`[^1]
* **Count** = 1 per 150ft per building * **Count** = 1 per building
_All others:_ _All others:_
* Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)` * Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
@@ -47,7 +47,12 @@ up: "[[takeoff-scripts]]"
* `System` = "TPD - Temp Power Distribution (Gag. & Bldg.)" * `System` = "TPD - Temp Power Distribution (Gag. & Bldg.)"
* `BidItem` = "2 - Garage" * `BidItem` = "2 - Garage"
Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)` _Garden Style:_
* Takeoff: .../`TEMPORARY POWER - T POLE (EACH)`
* **Count** = 1 per building
_All others:_
* Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
* **Count** = Garage GSF * **Count** = Garage GSF
[^1]: Field constructed assembly of receptacles. [^1]: Field constructed assembly of receptacles.
+1 -1
View File
@@ -56,4 +56,4 @@ $$
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening} \mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
$$ $$
High Rise .110--.120 hr/sqft High-Rise .110--.120 hr/sqft
+1 -1
View File
@@ -36,7 +36,7 @@ as confirmed by [[joel-jansen]]:
> Confirmed, follow Pre-Takeoff email. > Confirmed, follow Pre-Takeoff email.
> >
> In general, > In general,
> for [[pdi-building-types#High Rise|High Rise]] projects, > for [[pdi-building-types#High Rise|high-rise]] projects,
> assume Free-Air devices will not be allowed > assume Free-Air devices will not be allowed
> in other than [[units-takeoff|Units]]. > in other than [[units-takeoff|Units]].
+42
View File
@@ -0,0 +1,42 @@
---
id: 2026-05-05T11:53:09-0400
title: 2026-05-05 11:53:09
tags: []
daily: "[[2026-05-05]]"
---
# 2026-05-05 11:53:09
Direction from [[joel-jansen|Joel]]
on acceptable [[conest|ConEst]] takeoff
for [[emergency-communications-systems]]
received while working on [[hilltop-gardens|Hilltop Gardens]].
## Two-Way Horizontal
Relevant to [[two-way-takeoff]]:
> [!quote] Ben O'Brien's OneNote: Takeoff/(FA RISER + 2-WAY)
> * Horizontal:
> * Length:
> * If shown on Plans (FA/Systems/ etc.)
> * based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer)
> [!quote] [[joel-jansen]] via Microsoft Teams @ 2026-05-05 12:12
> it defaults to elevator lobbies
> when no dedicated area of refuge is defined.
> stairwells they are required for buildings 5 floors
> AND when the inside door of the stair going to the floor locks
> so then they would be required every 5th floor
>
> from our FA team
## DAS Corridor Assemblies
Relevant to [[distributed-antenna-systems-takeoff]]:
> [!quote] [[joel-jansen]] at around 2026-05-05 11:50 (pp.)
> Corridor assemblies are usually only necessary for _cellular_ DAS,
> because Life Safety DAS, especially as designed PDI,
> does not usually require remote antennas.
+13 -14
View File
@@ -17,25 +17,20 @@ up: "[[takeoff-scripts]]"
> `System` = "FA - Two Way Communication" > `System` = "FA - Two Way Communication"
%%
It's curious we use the longer of FCR to elevator lobbies/FCR to stairwells
rather than just the total length,
since in high-rises _all_ stairwells with locking doors
require communication systems per
[[ibc_s0403#403.5.3.1 Stairway communication system.]]
%%
## Horizontal ## Horizontal
1. * `Area` = Same as Fire Command Room 1. * `Area` = Same as Fire Command Room
`FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`2-WAY COMMUNICATION = 1" CONDUIT ...` `FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`2-WAY COMMUNICATION = 1" CONDUIT ...`
**Length** = Per drawings if shown, otherwise use longer of **Length** = Per drawings if shown,
* FCR to elevator lobbies otherwise measure from FCR to every elevator lobby.
* FCR to stairwells For [[pdi-building-types#High Rise|high-rise]] buildings,
_also_ measure from the FCR to every stairwell.[^1]
**Count** = Count of elevator lobbies or stairwells (match length) **Count** = Count of elevator lobbies and stairwells if high-rise (match length)
[^1]: See [[ibc_s0403#403.5.3.1 Stairway communication system.|IBC 403.5.3.1]].
## Vertical ## Vertical
@@ -46,14 +41,18 @@ require communication systems per
* **Length** = 15ft * Count * **Length** = 15ft * Count
* **Count** = match Horizontal * **Count** = match Horizontal
> [!important]
> [[sleeving-takeoff]]
## Firefighter Phone System ## Firefighter Phone System
> [!important] > [!important]
> These are ICC definition two-way communication systems, > These are ICC definition two-way communication systems,
> redundant with the standard takeoff described above. > redundant with the standard takeoff described above.
> These assemblies can be ignored > These assemblies can be ignored
> unless given specific direction otherwise. > unless given specific direction otherwise.[^2]
> Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
[^2]: Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...` `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`