vault backup: 2026-05-05 16:45:34
This commit is contained in:
Vendored
+2
-1
@@ -24,5 +24,6 @@
|
||||
"pdf-plus",
|
||||
"copy-document-as-html",
|
||||
"templater-obsidian",
|
||||
"wikipedia-search"
|
||||
"wikipedia-search",
|
||||
"obsidian-toggle-list"
|
||||
]
|
||||
Vendored
+16
@@ -77,5 +77,21 @@
|
||||
],
|
||||
"key": "S"
|
||||
}
|
||||
],
|
||||
"obsidian-toggle-list:Progress Checklist-Next": [
|
||||
{
|
||||
"modifiers": [
|
||||
"Alt"
|
||||
],
|
||||
"key": "A"
|
||||
}
|
||||
],
|
||||
"obsidian-toggle-list:Progress Checklist-Prev": [
|
||||
{
|
||||
"modifiers": [
|
||||
"Alt"
|
||||
],
|
||||
"key": "X"
|
||||
}
|
||||
]
|
||||
}
|
||||
@@ -0,0 +1,40 @@
|
||||
{
|
||||
"pop_state": {
|
||||
"popon": false,
|
||||
"hot": false,
|
||||
"incr": 0
|
||||
},
|
||||
"plot": false,
|
||||
"cmd_list": [
|
||||
{
|
||||
"index": 0,
|
||||
"name": "Progress Checklist",
|
||||
"tmp_name": "Command 0",
|
||||
"bindings": [
|
||||
0
|
||||
],
|
||||
"isPopOver": true
|
||||
}
|
||||
],
|
||||
"setup_list": [
|
||||
{
|
||||
"index": 0,
|
||||
"all_states": "* [ ]\n* [/]\n* [x]",
|
||||
"states": [
|
||||
"* [ ]",
|
||||
"* [/]",
|
||||
"* [x]"
|
||||
],
|
||||
"sorteds": [
|
||||
"* [ ]",
|
||||
"* [/]",
|
||||
"* [x]"
|
||||
],
|
||||
"states_dict": {}
|
||||
}
|
||||
],
|
||||
"registedCmdName": [
|
||||
"Progress Checklist-Next",
|
||||
"Progress Checklist-Prev"
|
||||
]
|
||||
}
|
||||
+1033
File diff suppressed because it is too large
Load Diff
@@ -0,0 +1,10 @@
|
||||
{
|
||||
"id": "obsidian-toggle-list",
|
||||
"name": "ToggleList",
|
||||
"version": "1.2.7",
|
||||
"minAppVersion": "0.15.0",
|
||||
"description": "Toggle the list/checklist with custom states/prefixes and suffixes",
|
||||
"author": "Lite C",
|
||||
"authorUrl": "https://github.com/thingnotok/obsidian-toggle-list/",
|
||||
"isDesktopOnly": false
|
||||
}
|
||||
+10
-1
@@ -14,6 +14,10 @@
|
||||
"user_scripts_folder": "scripts",
|
||||
"enable_folder_templates": true,
|
||||
"folder_templates": [
|
||||
{
|
||||
"folder": "timestamped",
|
||||
"template": "templates/timestamped.md"
|
||||
},
|
||||
{
|
||||
"folder": "periodic/daily",
|
||||
"template": "templates/daily.md"
|
||||
@@ -54,5 +58,10 @@
|
||||
"startup_templates": [
|
||||
"templates/startup.md"
|
||||
],
|
||||
"intellisense_render": 1
|
||||
"intellisense_render": 1,
|
||||
"ignore_folders_on_creation": [
|
||||
{
|
||||
"folder": ""
|
||||
}
|
||||
]
|
||||
}
|
||||
+1
-1
@@ -7,7 +7,7 @@ up: "[[conest-projects]]"
|
||||
|
||||
Project Status: Warranty
|
||||
Region: DIV-4 Dan Bacon
|
||||
Building Type: High Rise
|
||||
Building Type: High-Rise
|
||||
Contract Type: Design Build
|
||||
Units: 454
|
||||
Square Feet: 545,051
|
||||
|
||||
+1
-1
@@ -6,7 +6,7 @@ up: "[[conest-projects]]"
|
||||
---
|
||||
# 1990 K Street
|
||||
|
||||
High rise apartment
|
||||
High-rise apartment
|
||||
|
||||
## My Role
|
||||
|
||||
|
||||
@@ -6,7 +6,7 @@ up: "[[conest-projects]]"
|
||||
---
|
||||
# Charlotte South End Hotel
|
||||
|
||||
High rise hotel
|
||||
High-rise hotel
|
||||
|
||||
[[2026-03-09_15-50-49|Pre-Takeoff Confirmation]]
|
||||
|
||||
|
||||
@@ -36,7 +36,7 @@ up: "[[takeoff-scripts]]"
|
||||
* **Length** = _Match Fire Alarm takeoff Length_
|
||||
* **Count** = _Match Fire Alarm takeoff Count_
|
||||
|
||||
### Stairwell Riser Every 2 Floors
|
||||
### Stairwell Riser (Every 2 Floors)
|
||||
|
||||
1. * `Area` = "Typical - Stairwells Building Even Levels"
|
||||
|
||||
@@ -64,8 +64,10 @@ Weatherhead for antenna. One per building.
|
||||
## Horizontal
|
||||
|
||||
> [!important]
|
||||
> Usually only for cellular DAS.
|
||||
> Usually only for cellular DAS.[^1]
|
||||
> Confirm takeoff requirement with [[pdi-bid-estimating|Bid]].
|
||||
|
||||
[^1]: [[2026-05-05_11-53-09]]
|
||||
|
||||
1. .../`CORRIDORS ...`
|
||||
* **Length** = Length measured for every corridor/garage
|
||||
|
||||
@@ -36,7 +36,7 @@ All systems currently listed in this note
|
||||
are described as "two-way communication systems".
|
||||
|
||||
Those listed directly below have no overlap:
|
||||
* stairway communication systems --- [[ibc_s0403#403.5.3.1 Stairway communication system.|IFC 403.5.3.1]]
|
||||
* stairway communication systems (high-rise only) --- [[ibc_s0403#403.5.3.1 Stairway communication system.|IFC 403.5.3.1]]
|
||||
* elevator landing communication systems --- [[ibc_s1009#1009.8 Two-way communication.|IFC 1009.8]]
|
||||
* area of refuge communication systems --- [[ibc_s1009#1009.6.5 Two-way communication.|IFC 1009.6.5]]
|
||||
* emergency responder communication coverage system -- [[ifc_s0510#SECTION 510---EMERGENCY RESPONDER RADIO COVERAGE|IFC Section 510]]
|
||||
|
||||
@@ -87,7 +87,7 @@ For each elevator shaft:
|
||||
> Adjacent elevators may be in the same or parallel shafts.
|
||||
> Count the shafts accordingly:
|
||||
>
|
||||
> ```
|
||||
> ```none
|
||||
> +-----------------------------+--------------------------------+
|
||||
> | | |
|
||||
> | || +--------+ +--------+ || | || +--------+ || +--------+ || |
|
||||
@@ -133,6 +133,9 @@ For each stairwell:
|
||||
`... RISER`
|
||||
* **Length** = 10ft
|
||||
|
||||
> [!important]
|
||||
> [[sleeving-takeoff]]
|
||||
|
||||
## Annunciator Panels
|
||||
|
||||
> [!info] Also Known As
|
||||
@@ -199,11 +202,11 @@ _Design Build (alternative method):_
|
||||
> [!info]
|
||||
> Refers to fire, smoke, and combination fire/smoke dampers.
|
||||
|
||||
In [[pdi-building-types#High Rise|high rise construction]],
|
||||
In [[pdi-building-types#High Rise|high-rise construction]],
|
||||
usually found on every level with units.
|
||||
|
||||
> [!tip]
|
||||
> If possible, use
|
||||
> If possible, use
|
||||
> * `Area` = "Typical - Fire Smoke Dampers"
|
||||
> with quantity per level as shown.
|
||||
|
||||
|
||||
+9
-5
@@ -37,11 +37,15 @@ up: "[[conest-projects]]"
|
||||
* [x] Backbone
|
||||
* [x] Homeruns
|
||||
* [-] [[low-voltage-takeoff]]
|
||||
* [ ] [[fire-alarm-takeoff]]
|
||||
* [ ] [[two-way-takeoff]]
|
||||
* [ ] [[distributed-antenna-systems-takeoff]]
|
||||
* [?] [[lightning-protection-takeoff]]
|
||||
* [ ] [[misc-budgets-takeoff]]
|
||||
* [x] [[fire-alarm-takeoff]]
|
||||
* [x] [[two-way-takeoff]]
|
||||
* [?] Stairwells? Elevator lobbies? Both? See [[2026-05-05_11-53-09]].
|
||||
* [x] [[distributed-antenna-systems-takeoff]]
|
||||
* [-] Corridor assemblies
|
||||
* [-] [[lightning-protection-takeoff]]
|
||||
* Not mentioned in drawings or proposal,
|
||||
no cost included in Bid Sheet.
|
||||
* [x] [[misc-budgets-takeoff]]
|
||||
* [ ] [[temp-power-takeoff]]
|
||||
|
||||
## ConEst Questions
|
||||
|
||||
@@ -32,7 +32,7 @@ Building elements are noncombustible[^1]
|
||||
|
||||
### Type I-A: Protected Fire-Resistive Non-Combustible
|
||||
|
||||
Common of [[pdi-building-types#High Rise|high rise]]
|
||||
Common of [[pdi-building-types#High Rise|high-rise]]
|
||||
and [[ibc-occupancy-classifications#Group I Institutional|Group I]] occupancies.
|
||||
|
||||
* 3hr Exterior Walls
|
||||
|
||||
+12
-1
@@ -10,6 +10,16 @@ title: SECTION 403---HIGH-RISE BUILDINGS
|
||||
---
|
||||
# SECTION 403---HIGH-RISE BUILDINGS
|
||||
|
||||
%%
|
||||
|
||||
> [!quote] [[ibc_ch02]]
|
||||
> **HIGH-RISE BUILDING.**
|
||||
> A building with an occupied floor
|
||||
> located more than 75 feet (22 860 mm)
|
||||
> above the lowest level of fire department vehicle access.
|
||||
|
||||
%%
|
||||
|
||||
## 403.1 Applicability.
|
||||
|
||||
High-rise buildings shall comply with Sections 403.2 through 403.6.
|
||||
@@ -18,7 +28,8 @@ High-rise buildings shall comply with Sections 403.2 through 403.6.
|
||||
|
||||
## 403.4 Emergency systems.
|
||||
|
||||
The detection, alarm and emergency systems of high-rise buildings shall comply with Sections 403.4.1 through 403.4.8.
|
||||
The detection, alarm and emergency systems of high-rise buildings
|
||||
shall comply with Sections 403.4.1 through 403.4.8.
|
||||
|
||||
%% TODO %%
|
||||
|
||||
|
||||
@@ -32,7 +32,7 @@ If no quote is available:
|
||||
|
||||
* **Downlead locations** = building corners + additional locations
|
||||
such that downlead spacing is not greater than 100ft
|
||||
* Minimum 10 locations for High Rise
|
||||
* Minimum 10 locations for High-rise
|
||||
|
||||
* **Total downlead conduit length** = building height * downlead locations
|
||||
|
||||
|
||||
@@ -17,7 +17,7 @@ and even less for dormitories.
|
||||
%% TODO %%
|
||||
|
||||
> [!info]
|
||||
> A high rise building has an occupied floor more than 75 feet
|
||||
> A high-rise building has an occupied floor more than 75 feet
|
||||
> above the lowest level of fire department vehicle access.
|
||||
|
||||
### Mid Rise
|
||||
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-05
|
||||
title: 2026-05-05
|
||||
tags: []
|
||||
weekly: "[[2026w19]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-04]]"
|
||||
---
|
||||
# 2026-05-05
|
||||
@@ -34,7 +34,7 @@ but the reader should be assumed not to be especially skeptical.
|
||||
|
||||
#### User Story
|
||||
|
||||
Frank is estimating a 20-story high rise
|
||||
Frank is estimating a 20-story high-rise
|
||||
and notices that their are roughly, but not exactly,
|
||||
the same number of receptacles in the corridors of levels 2 to 19.
|
||||
Frank starts a new takeoff for duplex receptacles,
|
||||
|
||||
@@ -36,7 +36,7 @@ up: "[[takeoff-scripts]]"
|
||||
|
||||
_Garden Style:_
|
||||
* Takeoff: .../`TEMPORARY POWER - T POLE (EACH)`[^1]
|
||||
* **Count** = 1 per 150ft per building
|
||||
* **Count** = 1 per building
|
||||
|
||||
_All others:_
|
||||
* Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
@@ -47,8 +47,13 @@ up: "[[takeoff-scripts]]"
|
||||
* `System` = "TPD - Temp Power Distribution (Gag. & Bldg.)"
|
||||
* `BidItem` = "2 - Garage"
|
||||
|
||||
Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
* **Count** = Garage GSF
|
||||
_Garden Style:_
|
||||
* Takeoff: .../`TEMPORARY POWER - T POLE (EACH)`
|
||||
* **Count** = 1 per building
|
||||
|
||||
_All others:_
|
||||
* Takeoff: .../`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
* **Count** = Garage GSF
|
||||
|
||||
[^1]: Field constructed assembly of receptacles.
|
||||
Sometimes called a "spider box".
|
||||
|
||||
@@ -56,4 +56,4 @@ $$
|
||||
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
|
||||
$$
|
||||
|
||||
High Rise .110--.120 hr/sqft
|
||||
High-Rise .110--.120 hr/sqft
|
||||
|
||||
@@ -36,7 +36,7 @@ as confirmed by [[joel-jansen]]:
|
||||
> Confirmed, follow Pre-Takeoff email.
|
||||
>
|
||||
> In general,
|
||||
> for [[pdi-building-types#High Rise|High Rise]] projects,
|
||||
> for [[pdi-building-types#High Rise|high-rise]] projects,
|
||||
> assume Free-Air devices will not be allowed
|
||||
> in other than [[units-takeoff|Units]].
|
||||
|
||||
|
||||
@@ -0,0 +1,42 @@
|
||||
---
|
||||
id: 2026-05-05T11:53:09-0400
|
||||
title: 2026-05-05 11:53:09
|
||||
tags: []
|
||||
daily: "[[2026-05-05]]"
|
||||
---
|
||||
# 2026-05-05 11:53:09
|
||||
|
||||
Direction from [[joel-jansen|Joel]]
|
||||
on acceptable [[conest|ConEst]] takeoff
|
||||
for [[emergency-communications-systems]]
|
||||
received while working on [[hilltop-gardens|Hilltop Gardens]].
|
||||
|
||||
## Two-Way Horizontal
|
||||
|
||||
Relevant to [[two-way-takeoff]]:
|
||||
|
||||
|
||||
|
||||
> [!quote] Ben O'Brien's OneNote: Takeoff/(FA RISER + 2-WAY)
|
||||
> * Horizontal:
|
||||
> * Length:
|
||||
> * If shown on Plans (FA/Systems/ etc.)
|
||||
> * based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer)
|
||||
|
||||
> [!quote] [[joel-jansen]] via Microsoft Teams @ 2026-05-05 12:12
|
||||
> it defaults to elevator lobbies
|
||||
> when no dedicated area of refuge is defined.
|
||||
> stairwells they are required for buildings 5 floors
|
||||
> AND when the inside door of the stair going to the floor locks
|
||||
> so then they would be required every 5th floor
|
||||
>
|
||||
> from our FA team
|
||||
|
||||
## DAS Corridor Assemblies
|
||||
|
||||
Relevant to [[distributed-antenna-systems-takeoff]]:
|
||||
|
||||
> [!quote] [[joel-jansen]] at around 2026-05-05 11:50 (pp.)
|
||||
> Corridor assemblies are usually only necessary for _cellular_ DAS,
|
||||
> because Life Safety DAS, especially as designed PDI,
|
||||
> does not usually require remote antennas.
|
||||
+13
-14
@@ -17,25 +17,20 @@ up: "[[takeoff-scripts]]"
|
||||
|
||||
> `System` = "FA - Two Way Communication"
|
||||
|
||||
%%
|
||||
It's curious we use the longer of FCR to elevator lobbies/FCR to stairwells
|
||||
rather than just the total length,
|
||||
since in high-rises _all_ stairwells with locking doors
|
||||
require communication systems per
|
||||
[[ibc_s0403#403.5.3.1 Stairway communication system.]]
|
||||
%%
|
||||
|
||||
## Horizontal
|
||||
|
||||
1. * `Area` = Same as Fire Command Room
|
||||
|
||||
`FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`2-WAY COMMUNICATION = 1" CONDUIT ...`
|
||||
|
||||
**Length** = Per drawings if shown, otherwise use longer of
|
||||
* FCR to elevator lobbies
|
||||
* FCR to stairwells
|
||||
**Length** = Per drawings if shown,
|
||||
otherwise measure from FCR to every elevator lobby.
|
||||
For [[pdi-building-types#High Rise|high-rise]] buildings,
|
||||
_also_ measure from the FCR to every stairwell.[^1]
|
||||
|
||||
**Count** = Count of elevator lobbies or stairwells (match length)
|
||||
**Count** = Count of elevator lobbies and stairwells if high-rise (match length)
|
||||
|
||||
[^1]: See [[ibc_s0403#403.5.3.1 Stairway communication system.|IBC 403.5.3.1]].
|
||||
|
||||
## Vertical
|
||||
|
||||
@@ -46,14 +41,18 @@ require communication systems per
|
||||
* **Length** = 15ft * Count
|
||||
* **Count** = match Horizontal
|
||||
|
||||
> [!important]
|
||||
> [[sleeving-takeoff]]
|
||||
|
||||
## Firefighter Phone System
|
||||
|
||||
> [!important]
|
||||
> These are ICC definition two-way communication systems,
|
||||
> redundant with the standard takeoff described above.
|
||||
> These assemblies can be ignored
|
||||
> unless given specific direction otherwise.
|
||||
> Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
|
||||
> unless given specific direction otherwise.[^2]
|
||||
|
||||
[^2]: Confirmed by [[joel-jansen]] 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
|
||||
|
||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`
|
||||
|
||||
|
||||
Reference in New Issue
Block a user