diff --git a/.obsidian/plugins/obsidian-linter/data.json b/.obsidian/plugins/obsidian-linter/data.json index 4195a36..50eb710 100644 --- a/.obsidian/plugins/obsidian-linter/data.json +++ b/.obsidian/plugins/obsidian-linter/data.json @@ -32,7 +32,7 @@ }, "insert-yaml-attributes": { "enabled": true, - "text-to-insert": "id:\naliases: []\ntitle:\ntags: []" + "text-to-insert": "title:\ntags: []" }, "move-tags-to-yaml": { "enabled": false, diff --git a/conest-projects.md b/conest-projects.md new file mode 100644 index 0000000..07af2ba --- /dev/null +++ b/conest-projects.md @@ -0,0 +1,9 @@ +--- +id: +aliases: [] +title: ConEst Projects +tags: [] +--- +# ConEst Projects + +Link target for [[conest]] projects. diff --git a/hilltop-gardens.md b/hilltop-gardens.md new file mode 100644 index 0000000..c800d34 --- /dev/null +++ b/hilltop-gardens.md @@ -0,0 +1,116 @@ +--- +id: +aliases: [] +title: Hilltop Gardens +tags: [] +up: "[[conest-projects]]" +--- +# Hilltop Gardens + +6 buildings + clubhouse +3 building types + +## ConEst Questions + +### Area Breakdowns + +Since residential building types have corridors +it will be necessary to create Areas for each level. + +## Bid Questions + +### Voltage Drop + +VOLTAGE DROP CALCULATIONS ON ALL FEEDERS AND BRANCH CIRCUITS +HAVE BEEN PERFORMED IN ACCORDANCE WITH THE STATE OF FLORIDA 2023 FBC ENERGY CONSERVATION C405.5.3. +THE CONTRACTOR IS RESPONSIBLE TO BE FAMILIAR WITH THE 2020 FBC ENERGY CONSERVATION +AND SHALL UPSIZE THE CONDUCTORS FOR FEEDER AND BRANCH CIRCUITS +BASED ON THE ACTUAL ROUTING IN THE FIELD. + +### Floor Boxes + +> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 25 +> RECEPTACLES WHICH ARE SHOWN WALL MOUNTED ON THE ELECTRICAL DRAWINGS +> ON WALLS WHICH, ON THE ARCHITECTURAL DRAWINGS AND ELEVATIONS +> ARE SHOWN AS GLASS OR PARTITIONS, +> SHALL BE FLUSH FLOOR DUPLEX RECEPTACLES +> MOUNTED ADJACENT TO BASE OR WALLS. + +**C405.10 Voltage drop.** +The total voltage drop across the combination of customer-owned service conductors, +feeder conductors and branch circuit conductors +shall not exceed 5 percent. + +### Wiring Method Selection + +[[wiring-method-selection]] + +> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32 +> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS. +> RACEWAYS IN SLAB-ON-GRADE OR BELOW GRADE SHALL BE SCHEDULE 40 PVC. +> TRANSITIONS FROM BELOW TO ABOVE GRADE +> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET +> OR APPROVED EQUIVALENT PROTECTION. +> MET FITTINGS SHALL BE MALLEABLE IRON OR STEEL. +> CONNECTORS SHALL BE INSULATED THROAT TYPE. + +#### Cable Uses + +> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32 +> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS. + +> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 27 +> STEEL TYPE "MC" CABLE #12 AWG AND #10 AWG +> WITH A FULL-SIZED GROUNDING CONDUCTOR +> MAY BE USED WHERE PERMITTED +> BY BOTH THE N.E.C. AND LOCAL ORDINANCE, +> IN THE FOLLOWING APPLICATIONS: +> * A. IN WALLS FOR HORIZONTAL DEVICE CONNECTION ONLY. +> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE). + +#### Rigid Elbows + +Rigid elbows are required, +but neither proposal mentions them. + +> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32 +> TRANSITIONS FROM BELOW TO ABOVE GRADE +> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET +> OR APPROVED EQUIVALENT PROTECTION. + +#### Fire Alarm Wiring Methods + + + +### Differences in Scope Between Customers + +2 Customers +KAST Construction +Hedrick Brothers Construction +Different scope + +DAS Conduit in separate bid item + +#### Awarded to Hedrick Brothers? + +BPM +2026-03-23 Nicole Bisbee: +Per correspondence from KAST +“Please note that KAST has **not** been awarded this project. +It appears the project will be undertaken by Hedrick Brothers.” + +Most recent proposal to KAST is 2026-02-26. +Assuming this one can be ignored. + +### AIC Ratings + +> [!quote] E.4.X.1 "RISER NOTES" (B) +> ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER. +> MAIN BREAKER AIC RATING IS 65K. +> UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K. +> SEE ATTACHED DETAIL ON SHEET E-6.4 FOR FURTHER DETAILS. + +### Lighting Inverters + +> E.2.1.1 "KEY NOTES" 2 +> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER. diff --git a/nfpa-70_200_grounded-conductors.md b/nfpa-70_200_grounded-conductors.md new file mode 100644 index 0000000..e69de29 diff --git a/periodic/daily/2026-04-19.md b/periodic/daily/2026-04-19.md new file mode 100644 index 0000000..309b757 --- /dev/null +++ b/periodic/daily/2026-04-19.md @@ -0,0 +1,12 @@ +--- +id: 2026-04-19 +aliases: [] +title: 2026-04-19 +tags: [] +weekly: "[[2026w17]]" +monthly: "[[2026-04]]" +quarterly: "[[2026q2]]" +previous: "[[2026-04-18]]" +dg-publish: true +--- +# 2026-04-19 diff --git a/periodic/daily/2026-04-20.md b/periodic/daily/2026-04-20.md new file mode 100644 index 0000000..d3316d2 --- /dev/null +++ b/periodic/daily/2026-04-20.md @@ -0,0 +1,12 @@ +--- +id: 2026-04-20 +aliases: [] +title: 2026-04-20 +tags: [] +weekly: "[[2026w17]]" +monthly: "[[2026-04]]" +quarterly: "[[2026q2]]" +previous: "[[2026-04-19]]" +dg-publish: true +--- +# 2026-04-20 diff --git a/timestamped/2026-02-11_12-12-16.md b/timestamped/2026-02-11_12-12-16.md index ad7c068..3e478e8 100644 --- a/timestamped/2026-02-11_12-12-16.md +++ b/timestamped/2026-02-11_12-12-16.md @@ -6,6 +6,7 @@ tags: - occupational - status/draft daily: "[[2026-02-11]]" +up: "[[conest-pre-takeoff-email-template]]" dg-publish: true --- # 2026-02-11 12:12:16 diff --git a/timestamped/2026-03-09_15-50-49.md b/timestamped/2026-03-09_15-50-49.md index caf6845..043c0b0 100644 --- a/timestamped/2026-03-09_15-50-49.md +++ b/timestamped/2026-03-09_15-50-49.md @@ -5,8 +5,9 @@ title: 2026-03-09 15:50:49 tags: - status/draft daily: "[[2026-03-09]]" -date-created: 2026-03-09T15:50:49-04:00 +up: "[[conest-pre-takeoff-email-template]]" dg-publish: true +date-created: 2026-03-09T15:50:49-04:00 --- # 2026-03-09 15:50:49 diff --git a/timestamped/2026-04-20_08-31-52.md b/timestamped/2026-04-20_08-31-52.md new file mode 100644 index 0000000..69e5ed9 --- /dev/null +++ b/timestamped/2026-04-20_08-31-52.md @@ -0,0 +1,35 @@ +--- +id: 2026-04-20_08-31-52 +aliases: [] +title: 2026-04-20_08-31-52 +tags: [] +daily: "[[2026-04-20]]" +dg-publish: true +--- +# 2026-04-20_08-31-52 + +## ConEst Schedule Meeting + +[[conest-schedule-meeting]] + +[[hilltop-gardens]] +Jared DeFanti and [[zane-meyers]] + +### ConEst Town Hall Meeting Announcement + +next two weeks + +All one presentation +Plan to update every year + +#### Agenda + +High-Level + +Process changes + +Accubid Anywhere + +#### Also Planned + +Team outing announcement diff --git a/timestamped/2026-04-20_08-58-40.md b/timestamped/2026-04-20_08-58-40.md new file mode 100644 index 0000000..0125066 --- /dev/null +++ b/timestamped/2026-04-20_08-58-40.md @@ -0,0 +1,134 @@ +--- +id: 2026-04-20_08-58-40 +aliases: [] +title: 2026-04-20_08-58-40 +tags: [] +daily: "[[2026-04-20]]" +up: "[[conest-pre-takeoff-email-template]]" +dg-publish: true +--- +# 2026-04-20_08-58-40 + +## Hilltop Gardens Pre-Takeoff Email + +%% +Implementation of [[conest-pre-takeoff-email-template]] +for [[hilltop-gardens]]. +%% + +Hello Team, + +Below is a comprehensive list of means & methods for Hilltop Gardens. +Please confirm you have received this email and respond with any questions or comments. + +* **Delivery Method:** Plans & Specs %% Plans & Specs, Design Build, Design Assist, P&S with Approved VE %% +* **Document Stage:** Permit %% DD, CD, Permit, GMP, Bid, Awarded %% +* **Drawings Date:** 2025-12-12 %% Date %% +* **Project Manual Date:** N/A %% Date %% +* **Proposal Date:** 2026-02-25 %% Date %% +* **Takeoff Request Stage:** Full Takeoff %% Stage 1, Full takeoff, etc. %% + +### Project Specification Callouts + +%% Put page of Drawing or PM after answer %% + +* Conduit Execution Plans: + * EMT Fittings: Not specified. + * Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_ + * PVC slab-on-grade, below grade only. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_ + %% GRC, coupling specs, etc. %% + +* Wire: AL 1 AWG and above. _---E.4.X.X "WIRE SCHEDULE KEY NOTE"_ + %% Copper or Aluminum, Acceptable Manufacturers %% +* Cable Uses: Devices only, homeruns in conduit. _---E.0.X.1 - "ELECTRICAL NOTES" Note 27_ + %% Branch Homeruns %% +* Steel Box Depth: Not specified. + %% 1-1/2", 2-1/8" %% +* Floor Boxes: _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_ + * Box Material: Hubbell B-2529 (stamped steel). + %% Box: PVC, Sheet metal, Cast iron %% + * Cover Material: Hubbell S-3725 (brass). + %% Covers: Brass, Aluminum %% +* Wiring Devices: All 20A Toggle/Duplex. _---E.0.X.1 "ELECTRICAL NOTES" Note 45_ +* Switchboards/Panelboards: %% Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings %% + * Bus Material: Copper. _---E.0.X.1 "ELECTRICAL NOTES" Notes 66(G), 67(G)_ + * Breaker Type: + * General Panelboards: Bolt-On. _---E.0.X.1 "ELECTRICAL NOTES" Note 66(E)_ + * Unit Load Centers: Plug-In. _---E.0.X.1 "ELECTRICAL NOTES" Note 67(E)_ + * Interrupting Current Ratings: "ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER. + MAIN BREAKER AIC RATING IS 65K. + UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K." + _---E.4.X.1 "RISER NOTES" Note (B)_ + +* Transformers: + * Winding Material: Not specified. + * K-Rating: Not specified. + %% Windings AL or CU, K-rating %% +* Generator: N/A. + %% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %% + +### Project Drawing/Detail Callouts + +* Describe conflicts between drawings / proposal: + %% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %% + +* Cost drivers in details not shown elsewhere on plans: + +### PDI System Execution Plan + +* Primaries: Conduit and wiring excluded. _---Proposal 2026-02-25_ + %% Installation only, (9) 6" PVC %% +* Secondaries: PVC with RMC stub-ups. AL wiring. + %% PVC UG, GRC Stub-ups, AL %% +* Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD. + %% PVC UG, EMT OH, AL over 100A, 2% VD %% +* Unit Subfeeds: PVC in-slab. AL wiring. 2% VD. + %% MC OH AL, VD per Chart on E5.01 %% +* Units: 20A Toggle/Duplex, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells + %% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %% +* Telecom: + %% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %% +* EV Chargers: + %% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %% +* Fire Alarm: 120V smokes in units. + %% Free-air where allowed by code. EMT Risers. %% +* DAS: Pathways, conduit, wiring excluded. + %% Conduit only, Per PDI DAS Design %% +* Low Voltage: + %% Free-air where allowed by code. Stub-ups to accessible ceilings. %% + +### Lighting Control + +* Scope: Per plans. + %% Code Minimum per Energy Code Assigned, P&S, PDI Design %% + +* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %% + * BOH: Line voltage + * Corridor: Digital standalone + * Amenity: Line voltage + * Site/Landscape: Line voltage + * Garage: Line voltage + +### Tasks/Quotes Needed for WBS + + + +%% All of these and Switchgear quote? %% + +* Electrical Constructability Review +* Electrical VDC +* Coordination Study %% _Design Build:_ Not needed. %% +* DAS Public Safety Raceway Design + + + +Thank you,