--- id: 2026-01-08T13:33:34-0500 title: 2026-01-08 13:33:34 tags: - occupational/closeout daily: "[[2026-01-08]]" --- # 2026-01-08 13:33:34 ## 2100 Crystal Drive Takeoff Review Notes on my takeoff for [[2100-crystal-drive]] as reviewed with [[joel-jansen]]: ### Generators > [!failure] > Generators were erroneously broken down in switchgear. [[switchgear-takeoff#Generator|Generator]] ### Switchgear Switchgear cost comp "\\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls" Includes * submetering * coordination study ### Composite Cleanup 1 day per week $$ \text{Average Weeks Per Month} = $$ > It occurs to me I don't know all the rules of our calendar > [Gregorian calendar - Wikipedia](https://en.wikipedia.org/wiki/Gregorian_calendar) ### Temp Power $10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]] [[temp-power-takeoff]] ### Unit Typicals I asked Joel about using unit typicals as described in [[2025-12-19_10-44-01]]. He stated that would be acceptable.