--- id: 2026-04-20T08:58:40 title: 2026-04-20 08:58:40 tags: - occupational daily: "[[2026-04-20]]" up: "[[conest-pre-takeoff-email-template]]" --- # 2026-04-20 08:58:40 ## Hilltop Gardens Pre-Takeoff Email %% Implementation of [[conest-pre-takeoff-email-template]] for [[hilltop-gardens]]. %% Hello Team, Below is a comprehensive list of means & methods for Hilltop Gardens. Please confirm you have received this email and respond with any questions or comments. * **Delivery Method:** Plans & Specs %% Plans & Specs, Design Build, Design Assist, P&S with Approved VE %% * **Document Stage:** Permit %% DD, CD, Permit, GMP, Bid, Awarded %% * **Drawings Date:** 2025-12-12 %% Date %% * **Project Manual Date:** N/A %% Date %% * **Proposal Date:** 2026-04-16 %% Date %% * **Takeoff Request Stage:** Full Takeoff %% Stage 1, Full takeoff, etc. %% ### Project Specification Callouts %% Put page of Drawing or PM after answer %% * Conduit Execution Plans: * EMT Fittings: Not specified. * Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_ * PVC slab-on-grade, below grade only. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_ %% GRC, coupling specs, etc. %% * Wire: AL 1 AWG and above. _---E.4.X.X "WIRE SCHEDULE KEY NOTE"_ %% Copper or Aluminum, Acceptable Manufacturers %% * Cable Uses: Devices only, homeruns in conduit. _---E.0.X.1 - "ELECTRICAL NOTES" Note 27_ %% Branch Homeruns %% * Steel Box Depth: Not specified. %% 1-1/2", 2-1/8" %% * Floor Boxes: _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_ * Box Material: Hubbell B-2529 (stamped steel). %% Box: PVC, Sheet metal, Cast iron %% * Cover Material: Hubbell S-3725 (brass). %% Covers: Brass, Aluminum %% * Wiring Devices: All 20A Toggle/Duplex. _---E.0.X.1 "ELECTRICAL NOTES" Note 45_ * Switchboards/Panelboards: %% Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings %% * Bus Material: Copper. _---E.0.X.1 "ELECTRICAL NOTES" Notes 66(G), 67(G)_ * Breaker Type: * General Panelboards: Bolt-On. _---E.0.X.1 "ELECTRICAL NOTES" Note 66(E)_ * Unit Load Centers: Plug-In. _---E.0.X.1 "ELECTRICAL NOTES" Note 67(E)_ * Interrupting Current Ratings: "ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER. MAIN BREAKER AIC RATING IS 65K. UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K." _---E.4.X.1 "RISER NOTES" Note (B)_ * Unit load center covers to be white _---E.3.X.X "KEY NOTES" Note 6_ * Transformers: * Winding Material: Not specified. * K-Rating: Not specified. %% Windings AL or CU, K-rating %% * Generator: N/A. %% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %% ### PDI System Execution Plan * Primaries: (2) 4"C install only, conduit furnished by FPL. Wiring excluded. _---Proposal 2026-04-16_ %% Installation only, (9) 6" PVC %% * Secondaries: PVC with RMC stub-ups. AL wiring. %% PVC UG, GRC Stub-ups, AL %% * Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD. %% PVC UG, EMT OH, AL over 100A, 2% VD %% * Unit Subfeeds: PVC in-slab. AL wiring. 3% VD. %% MC OH AL, VD per Chart on E5.01 %% * Units: 20A toggle/duplex, USB rec's, disposals, thermostat wiring. %% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %% * Telecom: * Backbone: (4) 4"C UG, (2) 4"C riser each building. * Units: 1"C to each unit. Assuming 28" MSDE's. Excluding homeruns and cabling. Stub-ups each outlet. %% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %% * EV Chargers: (12) conduit, wire, equipment. _---E.1.X.1, Proposal 2026-04-16_ %% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %% * Fire Alarm: PVC in-slab, below grade. 120V smokes in units. %% Free-air where allowed by code. EMT Risers. %% * DAS: Sleeving and pathways only. %% Conduit only, Per PDI DAS Design %% * Low Voltage: All pathways, conduit, wiring, equipment excluded. %% Free-air where allowed by code. Stub-ups to accessible ceilings. %% ### Lighting Control * Scope: Per plans. See E.6.X.2 "TYPICAL LOW VOLTAGE LIGHTING CONTROLS". %% Code Minimum per Energy Code Assigned, P&S, PDI Design %% * Governing Code: FBC 2023 (IECC 2021) * Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %% * BOH: Line voltage. * Corridor: Digital standalone. * Amenity: Line voltage. * Site/Landscape: Line voltage. * Garage: Line voltage. ### Tasks/Quotes Needed for WBS * Switchgear * Fire Alarm * Electrical Constructability Review * Electrical VDC * Coordination Study %% Design Build: Not needed. %% * DAS Public Safety Raceway Design Thank you,