--- id: 2026-06-04T13:20:08-0400 title: 2026-06-04 13:20:08 tags: [] daily: "[[2026-06-04]]" --- # 2026-06-04 13:20:08 ## 303 Mariposa Residence [[conest-manager-review]] for [[303-mariposa-residence]] lead by [[josh-ford]] as ConEst Manager attended by [[joel-jansen]] as ConEst Senior Estimator and [[jared-defanti]] and [[zane-meyers]] as ConEst Estimators. ### Temporary Power > "Do they really need \$10,000 for temp power?" \$2,500 and 50hrs ### Site Lighting Pole Bases > "I would leave it if it's for the bollards. It can't be that much." ### Site Low Voltage Duct Bank Josh okayed assumptions for site runs secondaries ### Putty Pads add putty pads equal to device boxes ### Feeders %% is run from inverter to EM diff size from MDP to inverter? %% ### Dimmable Receptacles > Lutron Homeworks devices are thicker, > need deep boxes. ### Lighting/Shade Controls [[lighting-controls-takeoff]] #### Trough `COMMON ASSEMBLIES`/`DISTRIBUTION`/`LIGHTING CONTROL PANEL INSTALLATION`/`_ - LIGHTING CONTROL PANEL INSTALLATION & TROUGH - ...` used 4 section changed labor time from 4 to 6 added 500ft \#12/2 NM ### Telecom > "I'm surprised this isn't a certified system" Changed assumed Cat5e to Cat6 > "I feel like we don't ever install Cat5 anymore" > > "A house on the upper range like this isn't going to go with Cat5" AV Coordination.pdf TV Specs: 3 Cat6 ### Fire Alarm Leaving smokes despite direction for budgetary purposes. ### Closeout #### Labor Plan > "I don't think you can even do a labor plan." > "Just leave it all at 100%." > "I use World (Electric) for everything, I don't care where it is." #### Subs Excavation $5,000 Wireways, Troughs: $1,250 #### General Expenses Lower Office Supplies to $2,500 Delete Customer Development ##### Duration Approved Labor Plan says 16 months Removed all under "Jobs > \$3mil COGs" Josh said he removed COGs with Aaron's direction on a job sold at \$3.8 million. #### Equipment Removed two-way radio #### Material Pricing > Josh: "Put \$400 for the Quazite." \ > Joel: "I put \$1,200." \ > Josh: "You put \$1,200? Okay put \$500." ### Conclusion surprised by high margin, checked bid takeoff found large cost difference in relocation budget