--- id: aliases: [] tags: - destiny/permanent - occupational - status/incomplete - type/guide - authorship/original title: Pre-Takeoff Research --- # Pre-Takeoff Research > [!important] Requirement Precedence > In case of conflict: > Requirements of the plans and specs > are superseded by the terms of our proposal, > which are superseded by specific direction from the bid team. > [!aside] "Plans & Specs" > The oft repeated "per plans and specs" is a gross oversimplification: > The RFP documents are more likely than not > to have one or more irreconcilable contradictions, > or some instance of [[gold-plating]] too egregious to accept. > When ConEst takes of a project "per plans and specs", > we are taking off _Bid's interpretation_ of the RFP documents, > which they must be able to articulate. Seek to use the cheapest method, as determined by Senior Construction Estimator and Database Administrator, as allowed for the situation. * [[wiring-method-selection]] * [[wiring-device-research]] * [[emergency-systems-research]] * [[low-voltage-raceway-selection]] ## General 1. Read about the project specifications and construction type 2. Locate Equipment Schedules Read about the project specifications and construction type: * Deck thickness * Wiring methods * Conductor material * Wire terminations (set-screw acceptable or compression required?) Locate: * Riser Diagram * Feeder Schedule (if present) * Main Electrical rooms and panel locations 1. Locate Unit panels and relevant keynotes * bus amps 2. Read about the project specifications and construction type * partition framing (wood or metal studs) * stud depth * wiring methods (NM or MC) * wiring device plates (decora or standard) * wiring device specs (are 15A devices allowed or minimum N5-20R) * equipment (20A Kitchen and bath) Low Voltage 1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility: * Cabling * Conduit & Pathways * Sleeving 2. In the drawings, locate: * Floor plans where LV scope is shown * LV Details 3. Read about the project specifications and construction type 4. Fill out OneNote ## Voltage Drop Unless explicitly stated in the plans or specs, conductors are to be sized according to the relevant schedule, _without respect for voltage drop_. ### Subfeeds 1. Read about the project specifications and construction type * Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget) * Corridor Ceiling type 2. In the drawings, locate: * Unit Panel Schedules * Unit Load Calculations * Riser Diagram * Subfeed schedule (if present)