--- id: 2026-03-26T08:49:49-0400 title: 2026-03-26 08:49:49 tags: - status/draft - occupational daily: "[[2026-03-26]]" date-created: 2026-03-26T08:49:49-04:00 --- # 2026-03-26 08:49:49 ## 1990 K Street Senior Review Follow-up to [[2026-03-20_13-44-59#2026-03-20 13:44:59]]. Comments by [[joel-jansen]] relevant to my takeoff for [[1990-k-street]]: ### Lighting Control Assemblies Relevant to [[lighting-controls-takeoff]]: Lighting control assembly selection for the project was contentious because PDS excluded the system due to lack of information, but the drawings painted as exact a picture as one could ask for prior to construction. > Design shows digital control, dimming controlled by occ sensors in stairwells, corridors. \ > ---E021 AUTOMATED LIGHTING CONTROL - SEQUENCES OF OPERATIONS > > Proposal excludes digital lighting control due to lack of information. \ > ---Proposal 2026-01-22, Pricing Alternates > > Spec 260923 - LIGHTING CONTROL DEVICES \ > Spec 260936 - MODULAR DIMMING CONTROLS In conversation with Joel, we agreed that I would use the "FBO" assemblies with the assumption that an LV system would be budgeted. > [!quote] 1990 K Street ConEst OneNote, "Lighting Control" > Takeoff to use FBO assemblies (rough-in, cable, and device labor). \ > ---Joel Jansen 2026-02-11 11:05 After direction I'm not clear on, Joel switched these to the device labor and material assemblies. [[lighting-controls-research]] ### Feeder Schedule 5"C Relevant to [[feeders-takeoff]]: Feeder schedule calls for 5 inch conduit for certain tags which PDI's schedule uses 4 inch for. I did not respect this in the takeoff, Joel intends to substitute. *** **\[2026-03-26 09:36\]** After conversation with [[christian-pereiro]], Joel substituted all EMT feeders for MC cable. Christian stated that [[pdi-bid-estimating|they]] would qualify the substitution in their next proposal and raised that 5 inch EMT does not exist in our database anyway[^1]. [^1]: It doesn't exist at all. See [[nfpa-70_358_emt#358.20(B) Maximum.|NEC 358.20(B)]].