--- id: aliases: [] tags: - destiny/permanent - occupational - status/incomplete - type/guide title: PDI Labor Plan --- # PDI Labor Plan 1. Fill out project basics 2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area) 3. Move everything in BUILDING FA systems into FA phase * Create a Phase named: "Fire Alarm" * Check system and Bid Item * Scroll through each and select all line items `FA - ...` * Change Breakdown to "Fire Alarm" phase 4. Separate all Phases into their proper corresponding "Labor Factor" * Check Phase box * Start scrolling through beginning with N/A * Change breakdown of everything in each phase to the proper labor factor * Do not move Temp Power (buckets) or site 5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan 6. Select the "Phase / Sort Code" extension view 7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases 8. Go into each Sort code to find the count for each unit item | Code | Description | | ---- | -------------------- | | 200 | rough | | 300 | trim | | 400 | rough wire and cable | 9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right * Anything you make adjustments to, highlight red so it can be reviewed 10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab * For the floor counts, if there are multiple buildings, add their total level count together * 2 buildings that each have 10 floors, input 20 for "number of floors - building * Add any useful description to the naming * Can change "Other" to something more prevalent on the project * "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans) * "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5 11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)