--- id: aliases: [] tags: - destiny/permanent - status/draft - type/guide - authorship/original - occupational/takeoff title: Pre-Takeoff Confirmation --- # Pre-Takeoff Confirmation The purpose of the pre-takeoff confirmation is to address potential discrepancies between the requirements of the project documents and the scope included in the bid team's proposed price. > [!important] > Complete [[pre-takeoff-research]] > before sending the confirmation. > [!example] Example provided by Joel Jansen 2025-09-18, edited > Good morning, > > Please see below and confirm the documents we plan to use > while we takeoff Alta Watkins are correct. > > * Plans & Specs, > * Drawings: GMP, 2025-09-11 > * Project Manual: GMP Specifications, 2025-09-11 > * Proposal: 2025-07-03 > * Takeoff Stage: **Full Take Off** > > Also, please confirm: > > 1. Are there any variations from the drawings that we need to include in our takeoff? > 2. Any accepted/pending alternates? > > Feeders: > * Size per Schedule on drawings (AL +100 A). > * PVC UG, EMT OH. > > Subfeeds: > * MC for metal stud units, SER all other units > > Voltage Drop: As shown for subfeeds, 2% Feeders > > Units: > * Devices: Standard Duplex/Toggle > * USB Rec's: As shown, plus 1 per bedroom (Type A & C). > * Studs: Metal in M units, Wood all other locations. > * Telecom: 30" UDP, CAT6. (use 28" in takeoff) > * Smoke Detection: 120V > > Fire Alarm: > * Pathways: Free Air > * 2-Way: Included > > Electrical: > * Devices: Decora Amenities, Duplex/Toggle BOH > > Fixtures: > * Cable: LV in Amenity Areas > * Occupancy Sensors: Local > > Thank you,