# 2026-01-09 10:00:03 ### 2100 Crystal Drive `#600 ? WHITE ?` had incorrect sort codes. #### Lighting Control I took off lighting per plans (E510) in spite of proposal stating "local control". Will have to be changed. #### Labor Factor Fire Alarm Switchgear Feeders Subfeeds Corridors Amenity Retail Units #### Fixtures > [!failure] > Several fixtures were erroneously based on NM cable. I built some fixtures with \#12/3 in areas with emergency lighting to be an unswitched hot. Joel is having me change them to \#12/2. #### Units > [!failure] > One unit type typical was missing `Area` quantities. > Another had no takeoff. #### Labor Plan $$ \mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening} $$ High Rise .110--.120 hr/sqft