--- id: aliases: [] tags: - occupational - occupational/systems/fire-alarm --- # Fire Alarm ## Sequence ### 1. Estimate preparation 1. Initial the OneNote 2. Read about the project specifications and construction type 3. Find Fire Alarm plans (if present) 4. Locate the following rooms: * Fire Command Center (FCC) * Generator Room * Fire Pump Room * Elevator Control Rooms * Elevator Shafts * Stairwells ### 2. Takeoff #### Riser ##### Fire Command Center {Building Type} Head End CA.30.23.X ##### Generator Room CA.30.22.2 ##### Fire Pump Room CA.30.22.4 ##### FACR to Elevator Shafts Elevator Shafts (CA.30.22.8) FACR TO ELEV SHAFT 1 ½" (CA.30.22.10/11) Measure Length from the most distant points of the FACR and each shaft. Input adder length to reach the bottom of the pit (Minimum 15ft adder). ``` | 1 shaft | 2 shafts | | || +--------+ +--------+ || | || +--------+ || +--------+ || | | || | Elev 1 | | Elev 2 | || | || | Elev 1 | || | Elev 2 | || | | || +--------+ +--------+ || | || +--------+ || +--------+ || | | ||=======================|| | ||============||============|| | | | | ``` ##### FACR to Elevator Control Rooms Elevator Control Room (CA.30.22.6) FACR/FCC TO ELEV CONTROL ROOM (CA.30.22.13/14) * Measure the Horizontal and Vertical Distance from the FACR to the ECR. * Use Typicals for the vertical riser. (Ex// 10' per floor) ##### FACR to Stairwells FACR TO STAIRWELLS 1" PVC (CA.30.22.17) * Measure from the furthest end of FACR to the furthest end of the stairwell to find length * This is for the Flow/Tamper modules in the stairwells ##### Terminal Cabinets TERMINAL CABINETS (2) 2" EMT/PVC (CA.30.26.X) Horizontal: * Measure from the Fire Command room to all electrical rooms Vertical: * Use 10ft Riser in Typical * GA or HD - 1" conduit / HR - (2) 2" conduits) ##### Annunciator Panels * Fire Alarm Annunciator (FAA), * Fire Alarm Annunciator Panel (FAAP) ANNUNCIATORS (CA.30.27.2/3) Remote Serial Annunciator, LCD Display - PVC * Measure from the Fire Command Room to FAA or Lobby ##### Sleeving #### Devices 1. Takeoff floor plans in order 2. Takeoff enlarged drawings ##### Smoke Detectors _Design Build:_ Count every stairwell at every level. ##### Pull Stations _Design Build:_ Count every stairwell at every level and every exterior exit. ##### Flow-Tamper Switches No free air. if wood frame, take off as EMT. _Design Build:_ Count every stairwell at every level. ##### Magnetic Door Holders Mech Connection - PVC AL Flex - 20 A _Design Build:_ Count every set of double doors. (Typical of elevator lobbies and corridors) ##### Speaker Strobes _Design Build:_ * Count every 75 ft, * measure with circles on Bluebeam * or divide relevant SF area by 4415 * $\pi(\frac{75}{2})^2 \approx 4415$ * every elevator lobby, * and every BOH room on the first floor and garage levels. #### Fire Smoke Dampers (FSD's) Take off both FA and Electrical * Misc Assemblies ### 3. Extension (Review and Checking) * Sleeving