--- id: aliases: [] title: 2026-01-13 tags: - authorship/original - destiny/permanent - status/draft - type/periodic/daily dg-publish: true --- # 2026-01-13 ## 2026-01-13 11:28 #occupational ### 2100 Crystal Drive ConEst Manager Review #### Josh's Review Order 1. Backwards from Final Pricing through rest of closeout, 1. Equipment: Cost = 1% of total cost - systems quotes? 2. briefly check Extension, 3. Takeoff: 1. Feeders 2. Subfeeds 3. Units > [!failure] > Quad USB's in Units were taken off as standard receptacles. #### Lighting Control Follow up to [[2026-01-09#Lighting Control]] Josh stated my takeoff was correct per drawings, but that concessions would need to be made for the scope as sold by [[pdi-estimating#Bid Estimating|Bid]]. At his direction I've removed dimming from BOH and corridor spaces. The remaining takeoff will remain, a $4/sf budget for a lighting control system for those areas was added. I stated that our proposal was deceptive for stating lighting control was included to which Josh agreed. 2021 IECC applies. Josh wants [[pdi-pre-takeoff-confirmation]] to ask if lighting control is "as shown" or "to code", I objected that "to code" as interpreted by Bid is not necessarily _to code_ in truth. Truly, they need to just tell us what they included. The customer would appreciate it too, I'm sure. #### Bonus Incentivized Inter-Departmental Conflict During the review a ~~project manager~~ came to Josh to ask for a revision to a WBS > [!aside] > Sunset WBS: Engineer did not approve aluminum EMT