--- id: 2026-01-09T10:00:03-0500 title: 2026-01-09 10:00:03 tags: - occupational daily: "[[2026-01-09]]" --- # 2026-01-09 10:00:03 ## 2100 Crystal Drive Closeout Notes on [[2100-crystal-drive]] as reviewed with [[joel-jansen]]: ### Extension `#600 ? WHITE ?` had incorrect sort codes. ### Lighting Control Relevant to [[lighting-controls-takeoff]]: I took off lighting per plans (E510) in spite of proposal stating "local control". Will have to be changed. ### Labor Factor Fire Alarm Switchgear Feeders Subfeeds Corridors Amenity Retail Units ### Fixtures Relevant to [[fixtures-takeoff]]: > [!failure] > Several fixtures were erroneously based on NM cable. I built some fixtures with \#12/3 in areas with emergency lighting to be an unswitched hot. Joel is having me change them to \#12/2. ### Units > [!failure] > One unit type typical was missing `Area` quantities. > Another had no takeoff. ### Labor Plan Relevant to [[pdi-labor-plan]]: $$ \mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening} $$ High-Rise .110--.120 hr/sqft