--- title: Fire Alarm Takeoff tags: - occupational/takeoff - status/draft - type/guide up: "[[takeoff-scripts]]" aliases: - fire alarm takeoff --- # Fire Alarm Takeoff > [!important] > Complete [[conest-emergency-systems-research]] before beginning takeoff. > [!info] > This note is intended for practice specific to [[pdi-estimating]]. > See [[fire-alarm]] for information about fire alarm systems. * `System` = "FA - Fire Alarm" ## Assembly Selection Free Air < PVC in Slab < EMT * _High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.[^1] * _Mid Rise, High Density (Wood frame):_ Free air, conduit only where required. [^1]: [[2026-02-26_10-06-19]] ## Backbone Include [[sleeving-takeoff]] as necessary. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/... ### Fire Command Center 1. * `Area` = As shown. * `Phase` = As shown. .../`HEAD END EQUIP`/`... HEAD END` ### Generator Room 1. * `Area` = Same as FACR. * `Phase` = Same as FACR. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`GENERATOR ROOM ...` ### Fire Pump Room 1. * `Area` = Same as FACR. * `Phase` = Same as FACR. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FIRE PUMP ROOM ...` ### Elevator Control Rooms > Also "Elevator Machine Room (EMR)" * `Area` = Same as FACR. * `Phase` = Same as FACR. For each Elevator Control Room (ECR): 1. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`ELEV CONTROL ROOM ...` * **Count** = 1 2. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FACR TO ELEV CONTROL RM ...` * **Length** = Length measured from the most distant points of the FACR and ECR. * Input adder length to reach the level of the ECR (Minimum 15ft). ### Elevator Shafts * `Area` = Same as FACR. * `Phase` = Same as FACR. For each elevator shaft: 1. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`ELEV SHAFT ...` * **Count** = 1 2. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FACR TO ELEV SHAFT ...` * **Length** = Length measured from the most distant points of the FACR and elevator shaft. * Input adder length to reach the level of the shaft (Minimum 15ft). > [!important] Counting Elevator Shafts > Adjacent elevators may be in the same or parallel shafts. > Count the shafts accordingly: > > ```none > +-----------------------------+--------------------------------+ > | | | > | || +--------+ +--------+ || | || +--------+ || +--------+ || | > | || | Elev 1 | | Elev 2 | || | || | Elev 1 | || | Elev 2 | || | > | || +--------+ +--------+ || | || +--------+ || +--------+ || | > | ||=======================|| | ||============||============|| | > | 1 shaft | 2 shafts | > +-----------------------------+--------------------------------+ > ``` ### FACR to Stairwells > [!info] > This is for the Flow/Tamper modules in the stairwells For each stairwell: 1. * `Area` = Same as FACR. * `Phase` = Same as FACR. .../`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FACR TO STAIRWELLS 1" CONDUIT ...` * **Length** = Length measured from the most distant points of the FACR and stairwell. * Input adder length to reach the level of the stairwell (Minimum 15ft). ## Terminal Cabinets `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`TERMINAL CABINET`/`ACE D ACCESSORY CABINET ENCLOSURE ...` * _Garden Style, High Density:_ (2) 1"C * _High Rise:_ (2) 2"C 1. Horizontal: * `Area` = Same as FACR. `... HORIZONTAL RUN` * **Length** = Length measured from FACR to all electrical rooms 2. Vertical: * `Area` = "Typical - Building All Levels" `... RISER` * **Length** = 10ft > [!important] > [[sleeving-takeoff]] ## Annunciator Panels > [!info] Also Known As > * Fire Alarm Annunciator (FAA) > * Fire Alarm Annunciator Panel (FAAP) 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`ANNUNCIATORS`/`REMOTE SERIAL ANNUNCIATOR ...` * **Length** = Length measured from the FACR to FAA or Lobby ## Central Monitoring Loop * `System` = "FAR - Fire Alarm Loop" > [!important] > Garden Style only. > > Fire Alarm Control Panels from each building will send a signal to a central location. > > In case of an emergency, > the fire department will go to the central fire alarm station > and find out what the issue is. ## Devices Takeoff should always(?) use the `DOES NOT INCLUDE COST OF DEVICES AND CABLE` assemblies, since we will always(?) have a fire alarm quote. ### Smoke Detectors 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...` * **Count:** As shown, otherwise (1) every stairwell at every level. ### Pull Stations 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`PULL STATION - ...` * **Count:** As shown, otherwise (1) every stairwell at every level and every exterior exit. ### Flow/Tamper Switches 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES ...`/`ADDRESSABLE DUAL MONITOR MODULE - FLOW/TAMPER - ...` (No free-air) * **Count:** As shown, otherwise (1) every stairwell at every level. ### Magnetic Door Holders 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`MAGNETIC DOOR HOLDER - ...` * **Count:** As shown, otherwise (2) every set of double doors. (Typical of elevator lobbies and corridors) ### Horns, Speakers, and Strobes 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`INDOOR HORN STROBE - ...` _Design Build (method 1):_ * Count every 75 ft, * measure with circles on Bluebeam * or divide relevant SF area by 4415[^2] * every elevator lobby, and * every BOH room on the first floor and garage levels. [^2]: $\pi(\frac{75}{2})^2 \approx 4415$ _Design Build (alternative method):_ * 15ft from end of corridor, * then every 50ft ## Fire/Smoke Dampers (FSD's) > [!info] > Refers to fire, smoke, and combination fire/smoke dampers. In [[pdi-building-types#High Rise|high-rise construction]], usually found on every level with units. > [!tip] > If possible, use > * `Area` = "Typical - Fire Smoke Dampers" > with quantity per level as shown. For each damper, take off both 1. * `System` = "FA - Fire Alarm" `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES ...`/`ADDRESSABLE OUTPUT RELAY CONTROL MODULE ...` 2. * `System` = "EL - Electrical" `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`FSD ...`