--- id: aliases: [] tags: [] --- # Feeders * Use 15ft adders for site runs (primaries, secondaries, etc.), as opposed to standard 10ft adder, to account for variability. ## Cable Support > [!quote] 300.19 Supporting Conductors in Vertical Raceways. > **(A) Spacing Intervals -- Maximum.** > Conductors in vertical raceways shall be supported > if the vertical rise exceeds the values in Table 300.19(A). > At least one support method shall be provided for each conductor > at the top of the vertical raceway or as close to the top as practical. > Intermediate supports shall be provided > as necessary to limit supported conductor lengths > to not greater than those values specified in Table 300.19(A). > [!cite] Table 300.19(A) Spacings for Conductor Supports > > | Conductor Size | Aluminum or Copper-Clad Aluminum | Copper | > | -------------------------------- | --------------------------------:| ------:| > | 18 AWG through 8 AWG | 100ft | 100ft | > | 6 AWG through 1/0 AWG | 200ft | 100ft | > | 2/0 AWG through 4/0 AWG | 180ft | 80ft | > | Over 4/0 AWG through 350 kcmil | 135ft | 60ft | > | Over 350 kcmil through 500 kcmil | 120ft | 50ft | > | Over 500 kcmil through 750 kcmil | 95ft | 40ft | > | Over 750 kcmil | 85ft | 35ft | ## Sleeving Provide sleeves for all feeder conduits passing through floors. * ID.31 Hilti * P = Plastic => Concrete * M = Metal => Wood Frame * Round 1" to 2"