--- id: aliases: [] tags: - occupational/systems/low-voltage - type/guide --- # Low Voltage ## Info * Security/Intrusion Detection * Access Control * CCTV * Audio-Visual * Wi-Fi Not to be confused with [[telecom]]. ### Routing #### Exposed Ceilings EMT to accessible space? PVC to MDF? #### Devices #### Daisy Chaining how many devices (if any) ## Sequence ### 1. Preparation 1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility: * Cabling * Conduit & Pathways * Sleeving 2. In the drawings, locate: * Floor plans where LV scope is shown * LV Details 3. Read about the project specifications and construction type 4. Fill out OneNote ### 2. Takeoff 1. Takeoff devices as shown throughout the building 2. Takeoff riser conduit as needed ### 3. Review 1. Sleeving for riser