--- id: aliases: [] tags: - authorship/original - destiny/permanent - occupational/takeoff/telecom - status/draft - type/guide title: Telecom --- # Telecom > [!info] Scope > * Telephone > * Data > * Cable TV > [!important] > Not to be confused with [[low-voltage-takeoff]]. ## "Site Low Voltage Duct Bank" * Conduit from outside of building to MDF | | | | ---------- | --------------------------------- | | `Area` | "2 - Site" | | `Phase` | "Site" | | `System` | "LVD - Site Low Voltage Ductbank" | | `Bid Item` | "1 - Site" | `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT` Size and quantity per proposal > drawings > assume (4) 4"C * **Length** = Length measured from MDF to 5ft beyond building footprint _Garden Style:_ Outside of every building > [!important] Long-Radius Elbows > Note requirements for long-radius elbows, > substitute items as necessary. ### Telecom Vaults "Quazite Box" polymer concrete enclosure `TEMPORARY ITEMS`/... * **Material Price** = 1000.00 * **Labor Hours** = 12.00 * **Sort Code**? = 200 `COMMON ASSEMBLIES`/`POLES / EXCAVATION / CORING / UG PULL BX`/`MANHOLES / PULL BOXES / EXCAVATION / CONCRETE`/... ## Backbone Riser (2) 4"C or (4) 4"C ULO | | | | --------- | ------------------------------- | | `Phase` | "Building - BOH ..." | | `System` | "TC - Telecom Backbone" | Add sleeves ### Horizontal Backbone | | | | --------- | --------------------- | | `Drawing` | Telecom riser diagram | | `Area` | Area of riser room | * **Length** = Length measured from MDF to IDF. * Input adder length to reach the level of the IDF (Minimum 15ft). ### Vertical Backbone | | | | --------- | ------------------------------- | | `Drawing` | Telecom riser diagram | | `Area` | "Typical - Building All Levels" | * **Length** = Length between floors (15ft ULO) ## Telecom Backboard As shown on plans. | | | | -------- | ------------------------------- | | `Phase` | "Building - BOH ..." | | `System` | "TC - Telecom Backbone" | `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD` ## Corridor Conduit (Unit MSDE to IDF) Empty conduit, either of * `FEEDER CONDUIT AND WIRE`/... * `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... One Takeoff per Area per level * **Length** = Average of subfeed lengths × # of Units * **Count** = # of Units ## Inner Duct For future use (e.g. fiber) `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)` ## Devices As shown on plans. Ignore floor boxes, other electrical scope. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/... * .../`BOH / AMENITY ASSEMBLIES` * .../`SCREWLESS DECORA COVERS UNITS / BOH` * .../`ROUGH IN ASSY` If system is included, take off _both_ rough-in and device assemblies in amenity areas.