--- id: 2026-01-13T11:28:14-0500 title: 2026-01-13 11:28:14 tags: - occupational/closeout - occupational/takeoff - status/draft daily: "[[2026-01-13]]" --- # 2026-01-13 11:28:14 ### 2100 Crystal Drive: ConEst Manager Review [[conest-manager-review]] for [[2100-crystal-drive]] lead by [[josh-ford]], attended by [[joel-jansen]] and myself. #### Josh's Review Order 1. Backwards from Final Pricing through rest of closeout, 1. Equipment: Cost = 1% of total cost - systems quotes? 2. briefly check Extension, 3. Takeoff: 1. Feeders 2. Subfeeds 3. Units > [!failure] > Quad USB's in Units were taken off as standard receptacles. #### Lighting Control Follow-up to [[2026-01-09_10-00-03#Lighting Control]]. Relevant to [[lighting-controls-takeoff]]. Josh stated my takeoff was correct per drawings, but that concessions would need to be made for the scope as sold by [[pdi-bid-estimating|Bid]]. At his direction I've removed dimming from BOH and corridor spaces. The remaining takeoff will remain, a $4/sf budget for a lighting control system for those areas was added. I stated that our proposal was deceptive for stating lighting control was included to which Josh agreed. 2021 IECC applies. Josh wants [[pdi-pre-takeoff-confirmation]] to ask if lighting control is "as shown" or "to code", I objected that "to code" as interpreted by Bid is not necessarily _to code_ in truth. Truly, they need to just tell us what they included. The customer would appreciate it too, I'm sure. #### Bonus Incentivized Inter-Departmental Conflict During the review a ~~project manager~~ came to Josh to ask for a revision to a WBS > [!aside] > Sunset WBS: Engineer did not approve aluminum EMT Bid receives bonuses based on _awarded GP_ ([[markup-vs-margin|margin]]), thus they are incentivized to underestimate cost. [[pdi-operations|Ops]] receives bonuses based on _positive GP variance_, thus they are incentivized to overestimate cost.