--- id: aliases: [] tags: - destiny/permanent - occupational - status/draft - type/guide title: Pre-Takeoff Confirmation --- # Pre-Takeoff Confirmation The purpose of the pre-takeoff confirmation is to address potential discrepancies between the requirements of the project documents and the scope included in the bid team's proposed price. > [!example] Example provided by Joel Jansen 2025-09-18 > Good morning, > > Please see below and confirm the documents we plan to use while we takeoff Alta Watkins are correct. > > * Plans & Specs, > * Drawings: GMP, 2025-09-11 > * Project Manual: GMP Specifications, 2025-09-11 > * Proposal: 2025-07-03 > > Also, please confirm: > > 1. Are there any variations from the drawings that we need to include in our takeoff? > 2. Any accepted/pending alternates? > 3. We are currently taking off **Full Take Off**. > 4. Feeders/Subfeeds will be per Schedule on drawings (AL +100 A). > > * Feeders -- PVC UG, EMT OH. > * Subfeeds -- MC for metal stud units, SER all other units. > * VD -- As shown for subfeeds, 2% Feeders > > Units: > * Devices -- Standard Duplex/Toggle > * USB Rec -- As shown, plus 1 per bedroom (Type A & C). > * Studs -- Metal in M units, Wood all other locations. > * Telecom -- 30" UDP, CAT6. (use 28" in takeoff) > * Smoke Det -- 120V > > Fire Alarm: > * Pathways: Free Air > * 2Way: Included > > Electrical: > * Devices: Decora Amenities, Duplex/Toggle BOH > > Fixtures: > * Cable: LV in Amenity Areas > * Occupancy Sensor: Local > > Thank you,