--- tags: - occupational/takeoff - status/draft - type/guide title: Telecom --- # Telecom > [!info] Scope > * Telephone > * Data > * Cable TV > [!important] > Not to be confused with [[low-voltage-takeoff]]. ## Note: Empty Conduit Where `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... is specified, `FEEDER CONDUIT AND WIRE`/... is also acceptable. ## "Site Low Voltage Duct Bank" 1. * `Area` = "2 - Site" * `Phase` = "Site" * `System` = "LVD - Site Low Voltage Ductbank" * `Bid Item` = "1 - Site" `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... * Size and quantity per proposal > drawings > assume (4) 4"C * **Length** = Length measured from MDF to 5ft beyond building footprint _Garden Style:_ Outside of every building > [!important] Long-Radius Elbows > Note requirements for long-radius elbows, > substitute items as necessary. ### Telecom Vaults "Quazite Box" polymer concrete enclosure 1. `TEMPORARY ITEMS`/`Quazite Box ...` * **Material Price** = 1000.00 * **Labor Hours** = 12.00 * **Sort Code ?** = 200 Alternative 1. `COMMON ASSEMBLIES`/`POLES / EXCAVATION / CORING / UG PULL BX`/`MANHOLES / PULL BOXES / EXCAVATION / CONCRETE`/`QUAZITE UG PULL BOXES`/... ## Backbone Riser * `Phase` = "Building - BOH ..." * `System` = "TC - Telecom Backbone" (2) 4"C or (4) 4"C if not shown ### Horizontal Backbone 1. * `Drawing` = Telecom riser diagram * `Area` = Area of riser room `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... * **Length** = Length measured from MDF to IDF * Input adder length to reach the level of the IDF (Minimum 15ft). ### Vertical Backbone 1. * `Drawing` = Telecom riser diagram * `Area` = "Typical - Building All Levels" `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... * Delete elbows if unnecessary. * **Length** = Height between floors (Minimum 15ft) ## Telecom Backboard As shown on plans, only if not excluded in proposal. 1. * `Phase` = "Building - BOH ..." * `System` = "TC - Telecom Backbone" `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD` * **Count** = As shown ## Corridor Conduit (Unit MSDE to IDF) One Takeoff per Area per level 1. `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/... * **Length** = Average of subfeed lengths * # of Units * **Count** = # of Units ## Inner Duct For future use (e.g. fiber) 1. `TEMPORARY ITEMS`/`MaxCell 3" 3 Cell` * **Material Price** = 450.00/C * **Labor Hours** = 12.00/C _Alternative:_ 1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)` ## Devices As shown on plans. Ignore scope shared with [[electrical-takeoff|electrical]]. (e.g. floor boxes) 1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/... * .../`BOH / AMENITY ASSEMBLIES` * .../`SCREWLESS DECORA COVERS UNITS / BOH` * .../`ROUGH IN ASSY` If _system_ is included, take off _both_ rough-in and device assemblies in amenity areas. If rough-in is included, always provide backboxes and conduit stub-ups for outlets in other than units, even if qualified as "free-air per code" or similar.[^1] [^1]: [[2026-03-25_08-14-59#"Free-Air Per Code"]]