--- id: aliases: [] tags: - occupational/systems/switchgear --- # Switchgear ## Sequence ### 1. Estimate preparation 1. Initial the OneNote 2. In the drawings, locate: * Riser Diagrams * House Panels 3. Copy over default Temporary Assemblies from sandbox job ### 2. Takeoff 1. Build Items in Distribution: * Panelboards * Switchboards * Meter centers * Generators * Transfer switches * Generator connection cabinets 2. Takeoff Common Assemblies: * XFMRs * Disconnect switches 3. Takeoff Items in Item Database: * Wireway (Trough/Gutter) 4. Takeoff Temp Assemblies: * CT Cabinet * Meter * Fire Pump * Fire Pump Controller When building panelboards/switchboards, add terminations according to an example from the schedules. **Do not include feeder terminations.** Items to Avoid: * Tap Boxes * Bus Duct * Vault Room * Anything FPL * Grounding * Elevator Room #### SPD's/TVSS's Labor only: ~1.5hrs #### Panelboards `DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/... #### Enclosed Circuit Breakers Treat as disconnect switch. #### Generators Add `GENERATOR SET UP` #### Generator Connection Cabinets Use a Distribution Panel of equal amps. #### Transfer Switches > "300A ATS" ##### Transfer Switches 1200A+ Use 1200A MTS/ATS, and add: * ==CA.33.14.AMPS== * Factor 1 = 3 * ==Delete 1200A== #### Meter Centers `SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION` Adjust Factor 1 for meter stacks, delete zeroed items. ### 3. Extension (Review and Checking) 1. Generator * Ensure takeoff is in the generator Area and System breakdowns * Put location, quantity, and type on OneNote