--- id: 2025-11-18T16:33:00-0500 title: 2025-11-18 16:33:?? tags: - status/draft - occupational/closeout daily: "[[2025-11-18]]" --- # 2025-11-18 16:33:?? ## Elliot St. ConEst Senior Review %% Transcription of notes taken while reviewing [[elliott-st-hotel]] with [[joel-jansen]]. %% Adorne USB Heating Designation was built with standard device. Subbed for Adorne. Subbed standard duplex receptacles in guestrooms for Adorne. Confirmed fixture branch length changes including Garage Note: It is not usually necessary to count emergency fixtures separately. Use minimum 1 hour for tape lights, except in units (minimum 0.5hr). Final Pricing adjustments: * Warranty, * CIP (see proposal) Added putty pads. Fire stopping budget = $25-35 per Unit. Robotic Total Station hours: match Structural Foreman. For contracts 5--15 million dollars: Equipment Cost $$\approx$$ 1% of Contract Value Mid Atlantic: 1 trip per month Offsite Parking: see bid sheet Project Executive time same as Oversight. When calculating durations for indirect labor, round down. * Rough Foreman * Trim Foreman * Amenity Foreman LV/FA Foreman: get hours from systems quote. Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm" Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.