--- id: aliases: [] tags: - occupational/systems/subfeeds --- # Subfeeds ## Sequence ### 1. Estimate preparation 1. Read about the project specifications and construction type * Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget) * Deck Thickness * Corridor Ceiling type 2. In the drawings, locate: * Unit Panel Schedules * Unit Load Calculations * Riser Diagram * Subfeed schedule (if present) ### 2. Takeoff 1. Determine wiring method | Construction Type | Wiring Method | Subfeed Options | | ----------------- | ------------- | --------------- | | 1,2 | MC Cable | MC, PVC, EMT | | 3,4,5 | NM Cable | SER, EMT | %% TODO: Create flow chart for wiring methods. Some cases to mention: * Deck thickness (minimum 3x conduit outer diameter) * Renovations (may not be able to run in slab) %% 2. Route subfeeds to the Meter Centers using appropriate adder lengths > [!tip] > Identify if and where typicals can be used 3. Assign material to lengths and apply Voltage drop if applicable 4. Pigtails and Wireway Troughs if applicable ### 3. Extension (Review and Checking) 1. Use the extension tab to determine the Correct Quantity