--- id: 2026-05-05T11:53:09-0400 title: 2026-05-05 11:53:09 tags: [] daily: "[[2026-05-05]]" --- # 2026-05-05 11:53:09 Direction from [[joel-jansen|Joel]] on acceptable [[conest|ConEst]] takeoff for [[emergency-communications-systems]] received while working on [[hilltop-gardens|Hilltop Gardens]]. ## Two-Way Horizontal Relevant to [[two-way-takeoff]]: > [!quote] Ben O'Brien's OneNote: Takeoff/(FA RISER + 2-WAY) > * Horizontal: > * Length: > * If shown on Plans (FA/Systems/ etc.) > * based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer) > [!quote] [[joel-jansen]] via Microsoft Teams @ 2026-05-05 12:12 > it defaults to elevator lobbies > when no dedicated area of refuge is defined. > stairwells they are required for buildings 5 floors > AND when the inside door of the stair going to the floor locks > so then they would be required every 5th floor > > from our FA team ## DAS Corridor Assemblies Relevant to [[distributed-antenna-systems-takeoff]]: > [!quote] [[joel-jansen]] at around 2026-05-05 11:50 (pp.) > Corridor assemblies are usually only necessary for _cellular_ DAS, > because Life Safety DAS, especially as designed PDI, > does not usually require remote antennas.