--- id: 2026-03-09T15:50:49-04:00 aliases: [] title: 2026-03-09 15:50:49 tags: - authorship/original - destiny/permanent - status/draft - type/timestamped daily: "[[2026-03-09]]" date-created: 2026-03-09T15:50:49-04:00 dg-publish: true monthly: "[[2026-03]]" quarterly: "[[2026-Q1]]" weekly: "[[2026-W11]]" yearly: "[[2026]]" --- # 2026-03-09 15:50:49 %% Implementation of [[conest-pre-takeoff-email-template]] %% Hello Team, Below is a comprehensive list of means & methods for Charlotte South End Hotel. Please confirm you have received this email and respond with any questions or comments. * **Delivery Method:** Plans & Specs * **Document Stage:** Issue for Permit * **Drawings Date:** 2026-02-27 * **Project Manual Date:** 2026-02-27 * **Proposal Date:** 2025-12-12 * **Takeoff Request Stage:** Full Takeoff ### Project Specification Callouts * **Conduit:** %% GRC, coupling specs, etc. %% * **Wire:** * Material: Aluminum 100A and larger _---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)_ * Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_ * Encore Wire * General Cable * Okonite * Paranite * Pirelli * Senator * Southwire * **MC Cable:** * Application: Concealed feeders and branch circuits _---Spec XXXXXX (p. XXXX)_ %% Branch homeruns only; Not permitted %% * Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_ * Alflex * AFC * America Metal Moulding * Encore Wire * Southwire * ==Conductors: Copper _---Spec XXXXXX (p. XXXX)_== * ==Armor: Steel _---Spec XXXXXX (p. XXXX)_== * ==Jacket: PVC _---Spec XXXXXX (p. XXXX)_== * **Steel Box Depth:** * Telecom: 2-1/8" _---Spec XXXXXX (p. XXXX)_ * Security: 2-1/8" _---Spec XXXXXX (p. XXXX)_ * Other Applications: Not specified %% 1-1/2", 2-1/8" %% * **Floor Boxes:** Sheet metal with brass or aluminum covers _---Spec XXXXXX (p. XXXX)_ * **Wiring Devices:** * Units: * Current rating: Unspecified. Assuming 15A for takeoff. * Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff. %% 15A Decora %% * BOH/Common Areas: * Current rating: Unspecified. Assuming 20A for takeoff. * Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff. %% 20A Toggle/Duplex %% * **Switchboards:** * Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_ * ??? * Bus Material: ??? _---Spec XXXXXX (p. XXXX)_ * Interrupting Current Rating: ??? * **Distribution Panelboards:** * Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_ * ??? * Bus Material: ??? _---Spec XXXXXX (p. XXXX)_ * Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_ %% Snap-on, bolt on %% * Interrupting Current Rating: ??? * **Load Centers:** * Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_ * ??? * Bus Material: ??? _---Spec XXXXXX (p. XXXX)_ * Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_ %% Snap-on, bolt on %% * Interrupting Current Rating: ??? * **Transformers:** * Winding Material: ??? _---Spec XXXXXX (p. XXXX)_ * K-Rating: ??? %% Windings AL or CU, K-rating %% * **Generator:** (1) 500kW Diesel * Enclosure Specs: ??? _---Dwg. E014_ * Remote Tank: ??? * Tank Size: ??? _---Spec XXXXXX (p. XXXX)_ * Load Banks: ??? _---Spec XXXXXX (p. XXXX)_ * Acceptable Manufacturers: _---Spec 263213-3 (p. 2323)_ * Caterpillar Tractor Co. * Cummins/Power Generation * Kohler Power Systems (MTU Engine Only) * MTU On-Site Energy ### Project Drawing/Detail Callouts * Describe conflicts between drawings / proposal: %% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %% * Cost drivers in details not shown elsewhere on plans: ### PDI System Execution Plan * **Primaries:** %% Installation only, (9) 6" PVC %% * **Secondaries:** * %% PVC UG, GRC Stub-ups, AL %% * **Feeders:** PVC UG, EMT OH; Size and material per E05-10 schedule ==(Transformer primaries and secondaries all copper)== %% PVC UG, EMT OH, AL over 100A, 2% VD %% %% Emergency Feeds MI Cable %% * **Unit Subfeeds:** ??? %% MC OH AL, VD per Chart on E5.01 %% * **Units:** * ??? %% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %% * **Telecom:** * ??? %% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %% * **EV Chargers:** ??? %% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %% * **Fire Alarm:** ??? %% Free-air where allowed by code. EMT Risers. %% * **DAS:** ??? %% Conduit only, Per PDI DAS Design %% * **Low Voltage:** Free-air where allowed by code. %% Free-air where allowed by code. Stub-ups to accessible ceilings. %% ### Lighting Control * **Basis of Takeoff:** ??? _---???_ %% Code Minimum per Energy Code Assigned, P&S, PDI Design %% * **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_ * %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %% ### Tasks/Quotes Needed for WBS %% Delete any completed %% * Electrical Constructability Review * Electrical VDC * Coordination Study * DAS Public Safety Raceway Design Thank you,