--- id: 2026-02-05T12:14:47-0500 title: 2026-02-05 12:14:47 tags: - status/draft - topic/construction/electrical daily: "[[2026-02-05]]" --- # 2026-02-05 12:14:47 NM and SE cable are never permitted in Type III, IV, or IV construction. [[nfpa-70_338_se-cable#338.10(B)(4) Installation Methods for Branch Circuits and Feeders.|338.10(B)(4)(a)(1)]] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|334.12(A)(1)]]