--- id: 2026-03-10T13:51:32-0400 title: 2026-03-10 13:51:32 tags: - status/draft date-created: 2026-03-10T13:51:32-04:00 daily: "[[2026-03-10]]" --- # 2026-03-10 13:51:32 ## Charlotte South End Hotel Spec Interpretation Spec interpretation notes for [[charlotte-south-end-hotel]] with clarification by [[joel-jansen]]: ### EMT Fittings > [!quote] Spec 260510 2.4(E) > EMT - Electrical metallic tubing, "thin wall" zinc coated steel, enameled interior, ANSI C80.3, UL-797, > assembled using concrete tight and rain tight gland-ring compression threaded type fittings > except where alternate type fittings are allowable by the NEC > and authorities have jusrisdiction \[sic\]. > [!quote] Spec 260510 2.4(N)(2) > EMT connectors - Provide gland ring compression threaded fittings, except- > * a. Concrete tight double set screw type connectors > are acceptable in 2 1/2-inch and larger sizes > in dry locations only. > [!quote] Joel Jansen 2026-03-10 (pp.) > Takeoff as specified ### Liquid-Tight Conduit > [!quote] Spec 260510 2.4(G) > Liquid-tight flexible metallic raceway > shall be similar to standard flexible steel conduit > except encased in liquid tight neoprene outer jacket. No definition is provided for a liquid-tight flexible non-metallic raceway > [!quote] Spec 260510 2.4(G)(7) (text decoration added) > Provide _liquid-tight flexible conduit_ > for each motor and rotating device for power and control, ~~computer room~~[^1] > and for other equipment requiring adjustments or removal for service > in mechanical rooms or where subject to moisture or weather. > [!quote] Joel Jansen 2026-03-10 (pp.) > Assume LFMC. [^1]: I feel fairly confident this is erroneous. ### Voltage Drop > [!quote] Spec 260510 2.2(C)(4) (text decoration added) > Sizing of conductors and conduits > shall be solely the responsibility of the Contractor > and shall be based on the NEC, [[nfpa-70_310_conductors_for_general_wiring|Article 310]]. > Ampacity shall be equal to, or greater than, the required load specified. > ==Voltage drop shall be no greater than that allowed by the NEC.== > [!quote] Dwg. E00-00 "GENERAL PRICING NOTES" Note 9 > PROVIDE ALLOWANCE TO UPSIZE FEEDERS/BRANCH CIRCUITS > (OVER 100 FEET FOR 120/208V, OVER 200 FEET FOR 277/480V) > FOR A MAXIMUM OF 3% VOLTAGE DROP. ### Lighting Control #### Corridors Corridors may or may not have included digital control > [!quote] LEED Checklist, item "Interior Lighting" (Project Manual p. 23) > Option 1: **Lighting Control:** > Provide adjustable lighting controls > for **90% of individual occupant spaces** > with at least 3 lighting levels or scenes (on, off, mid-level). > Provide control for **all shared multi-occupant spaces**. Checklist assumes this point. *** > [!quote] Typical Unit Corridor Occupancy Sensor Callout (Ref dwg. E03-06 thru E03-14) > OCCUPANCY SENSORS TO DIM CORRIDOR LTG TO 50% WHEN NO OCCUPANCY > [!quote] Dwg. E06-01 "LIGHTING CONTROL NARRATIVE" > **SPACE TYPE** Corridor is shown only with captive key card control #### Units > [!quote] LD03-XX Typical Master Switch Callout > MASTER - TO CONTROL ENTRY AND ROOM ONLY. > ELECTRICAL ENGINEER TO SPECIFY ENERGY CODE COMPLIANT “MASTER OFF” > FOR THE REQUIRED GUESTROOM LOADS. > GMLD RECOMMENDS LUTRON’S "CODE-SMART" SYSTEM > ... Lighting control quote does not include master switches > [!quote] PDR Lutron Lighting Control Quote 2025-12-10 > (13) Pre-Assembled Processor Panel, > (14) Athena Centralized Din Lighting Control Panel, > (14) DALI ESN Panel, > (14) QS Sensor Module, > (4) Touchscreen, > (112) QS Wired Keypads, > (2) Partition Sensor, > (31) Wired Occupancy Sensor, > (2) 5 Contact Closure Inputs and 5 Relay Outputs These are captured as a budget > [!quote] 2025.12.09 - Charlotte South End Hotel - Bid Sheet v16-4-2, "Add-On Items" > master switch in guestrooms - TBD | $ 72,023 *** > [!quote] Proposal 2025-12-12, Pricing Summary > Lighting Controls – Lutron (turnkey) $ 850,000 Assuming that this line includes master switches based on sum of quote and switch allowance > [!quote] PDR Lutron Lighting Control Quote 2025-12-10, Pricing Summary –Turnkey > Lighting Control: Lutron $ 738,400.00 ### EV Chargers > [!quote] Proposal 2025-12-12, Alternates > Add: (21) EV-Capable and (3) EV-Installed per Building Connected $ 38,000 Panel LG's schedule (E06-13) shows (10) 40A/2P circuits with description "EV CHARGER". These circuits are not shown on the electrical set, nor are any chargers besides.