Labor Plan

Anova - The Pearl Multifamily Tower

pdi-labor-plan

PDI Sort Codes

Accubid item breakdown PDI SORT CODES

Code Description
100 Slab-Deck
200 Rough
250 Rough (Fire alarm trough?)
300 Trim
400 Wire-Cable
500 Fixtures
600 Distribution

Labor Factor Adjustment


\text{Desired Factor} = \text{Current Factor} \times \frac{\text{Desired Value}}{\text{Current Value}}

\text{New Labor Factor} = \text{Current Labor Factor} \times \frac{\text{Labor Plan Hours}}{\text{Accubid Hours}}

Garage Slab/Deck

"PDI Sort Code, Bid Item, Phase"

Building Slab/Deck

"PDI Sort Code, Bid Item, Phase"

Common Areas = Total Slab & Deck Labor

Calculate Factor and apply to column Slab-Deck

Labor Factor
BLDG - CORRIDOR Slab-Deck, All Others
BLDG - BOH Slab-Deck, All Others
GARAGE Slab-Deck, All Others
UNITS Slab-Deck, Rough, Trim, Fixtures
SUBFEEDS Slab-Deck, All Others
GEAR Not adjusted
FEEDERS Not adjusted
FIRE ALARM Slab-Deck, All Others
AMENITY Slab-Deck, All Others
RETAIL Slab-Deck, All Others
OFFICE Slab-Deck, All Others
KITCHEN Slab-Deck, All Others
FACADE Slab-Deck, All Others
TEMP POWER Not adjusted?
SITE Not adjusted?

Garage, Other than 100: Slab/Deck

"Phase, PDI Sort Code"

Drill into "Garage"

SELECT SUM(Labor_Hrs)
FROM Extension
WHERE PDI_SORT_CODES != 100;

Garage = Total
^ Garage (rough, trim, fix, f/a, ect..)
Total Hours

Calculate Factor and apply to all columns other than Slab-Deck

Units

Electrical Rough (Elec. 200, 400 & 600)