1.0 KiB
1.0 KiB
id, aliases, tags, title
| id | aliases | tags | title | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Area of Refuge (AoR) Takeoff |
Area of Refuge (AoR) Takeoff
Important
Complete emergency-systems-research before beginning takeoff.
[!info] See emergency-communications-systems for information about Two-Way and AoR communication systems.
Horizontal
Area: Same as Fire Command Room
FIRE ALARM & DAS SYSTEMS/TWO WAY COMMUNICATION ASSEMBLIES/...
-
Length: Per drawings if shown, otherwise use longer of
- FCR to elevator lobbies
- FCR to stairwells
-
Count: Number of boxes run to. Per drawings if shown, otherwise use the greater of:
- Count of elevators
- Count of stairwells
Vertical
Area: "Typical - Building All Levels"
FIRE ALARM & DAS SYSTEMS/TWO WAY COMMUNICATION ASSEMBLIES/...
- Length: 15ft x count
- Count: match Horizontal