Grounding Takeoff
This script is intended to cover both electrical and telecom grounding in lieu of detail sufficient for standard takeoff (e.g. a grounding riser).
Note that the material provided in this system is intended to be budgetary, not especially consistent with the actual install.
System Grounding
Area= "01 - Feeders/Risers Building"
-
COMMON ASSEMBLIES/GROUNDING/GND = \#3/0 & 1" CONDUIT - EMT- Length: Perimeter of the main electrical rooms plus length to each riser.
- Count: Total number of electrical rooms
-
COMMON ASSEMBLIES/GROUNDING/(3) ... x 10' CU CLAD GRD ROD & 4"X12" GND BAR- Count: 1
Riser
-
Area= "Typical - Building All Electrical Riser Rooms"
COMMON ASSEMBLIES/GROUNDING/GND = \#3/0 & 1" CONDUIT - EMT- Length: 15
- Count: 1
Telecom Ground Bridge
-
Area= "01 - Feeders/Risers Building"
COMMON ASSEMBLIES/GROUNDING/TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN- Count: Only as shown
Pool Bonding
Important
This scope is included here for its similarity in content. It may be more appropriate in electrical-takeoff
[!quote] joel-jansen 2026-01-20T16:30 (pp.) josh-ford prefers it in electrical, but I'm not concerned. So long as it's named "Pool Bonding" it's fine.
-
Area= Contentious
COMMON ASSEMBLIES/GROUNDING/`GND = #3/0 ...- Length: Perimeter of the pool plus length to nearest riser.
- Count: 1?