Risk Management for Construction Estimating

Cross-topic of risk-management and construction-estimating.

Estimating as Risk Mitigation

  • reduce risk of wasted estimation effort due to bid loss (prefer lower bid)
  • reduce risk of project overrun (prefer higher bid)

Estimating resources should be allocated according to Return on Mitigation (RoM), that is, their contribution to cost certainty.

\text{Efficiency} = -1 \times \frac{d\sigma}{dt}