1.5 KiB
1.5 KiB
title, tags, aliases
| title | tags | aliases | |||||
|---|---|---|---|---|---|---|---|
| Full Takeoff |
|
|
Full Takeoff
Info
Prerequisites
- pdi-conest-project-setup
- pre-takeoff-research
- pdi-pre-takeoff-confirmation
- conest-unit-matrix
- conest-wbs-setup
- conest-accubid-setup
Sequence
[!important] Disclaimer These scripts are intended to cover all cases, but can not possibly. Gaps should be filled and variations should be corrected.
Stage 1
Stage 2
- units-takeoff
- fixtures-takeoff
- lighting-controls-takeoff
- electrical-takeoff
- telecom-takeoff
- low-voltage-takeoff
- fire-alarm-takeoff
- two-way-takeoff
- distributed-antenna-systems-takeoff
- misc-budgets-takeoff
- temp-power-takeoff