8.4 KiB
id, aliases, tags, title
| id | aliases | tags | title | |||||
|---|---|---|---|---|---|---|---|---|
|
Fixture Designations |
Fixture Designations
This note details creation of fixture designations for use in fixtures-takeoff.
Naming
Format
<phase-abbr> - <assembly>(\: <subtype>)?( - <fixture-labor>)? \(<wiring-method>\)( <wm-descriptor>)* <branch-length>ft
[!example]
A - Surface: Pendant - 2.0hrs (MC) LV 20ft
Order
Use empty designations to separate phases.
[!example]
*** Hotel Units *** HU - Surface = 1.0hrs - #12 MC+LV 20ft HU - Surface = 1.5hrs - #12 MC+LV 20ft HU - Surface: Pendant = 2.0hrs - #12 MC+LV 20ft HU - Surface: J-Box For Future Fixture = 1.0hrs - #12 MC+LV 20ft HU - Recessed = 1.0hrs - #12 MC+LV 20ft *** Condo Units *** CU - Surface: Tape = 1.0hrs - #12 MC+LV 25ft CU - Surface: Wall = 1.0hrs - #12 MC+LV 25ft
Fixture Labor
| Fixture Type | Labor |
|---|---|
| Paddle Fan | 1.5 hr/ea. |
| Pendant | 1-4 hr/ea. |
| Strip/Cove | 0.5 hr/6ft |
| Site Poles | 1.5 hr/ea. |
| Festoon | 2.0 hr/ea. |
| All Others | 1.0 hr/ea. |
Fixture Branch Length
| Case | Standard Length |
|---|---|
| Site/Courtyard | 50ft |
| Garage | 50ft |
| BOH | 40ft |
| Corridors | 40ft |
| Interior Amenity | 40ft |
| Office/Retail | 50ft |
| Exterior Amenity | 50ft |
| Units | 20ft |
| Undercabinet Fixtures | 10ft |
| Stairwells | ? |
| Kitchen | ? |
Reduce as appropriate.
Fixture Branch Wire size
| Case | Wire Size |
|---|---|
| Site/Courtyard | #10 |
| Garage | #10 |
| NM Cable | #141 |
| All Others | #12 |
Garage
Fixtures
Use ENT assemblies unless forbidden by spec.
FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/GARAGE FIXTURE ENT W/#10 - STEEL OCT RING
FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING
If PVC is required, use following assemblies:
| Case | Assembly Path |
|---|---|
| Ceiling | FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
| Wall | FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP |
Homeruns
System= "EL - Electrical"
Use 1 Homerun for every 3 circuits in Garage
Use assembly COMMON ASSEMBLIES/Device Homeruns in Slab/Deck
Surface Mount
[!info] Surface Mount Fixtures
- Wall Mount (Sconce)
- Pendant
- Linear
- Tape
- Track
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/SQ BOX, ROUND P RING & MNTG BRKT... |
| PVC in Ceiling | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
| PVC in Wall | PVC/ENT ASSEMBLIES/3/4" PVC W/ 3#12 - STL BOX/TILE RING |
| EMT | EMT ASSEMBLIES/... - SQ BOX & ROUND P RING |
Note
Use lighting control cable assemblies in Amenity areas
Tape Lighting
Also called "cove" or "strip" lighting, however those terms are less specific and potentially confusing.
Use item FIXTURE LABOR 1/2HR
and change Fct 1 to match the calculated labor
(1 hour per 12 feet).
Note
Tape lighting length is limited by the "max power length" of the model (usually measured in millimeters). Max power length is usually 5000-15000mm (~16-49ft) depending on luminous output and voltage.
Separate these fixtures by labor, not length
*** Back of House ***
B - Surface: Tape = 0.5hr (01-06ft) - MC #12 40ft
B - Surface: Tape = 1.0hr (07-12ft) - MC #12 40ft
_
*** Interior Amenity ***
IA - Surface: Tape = 0.5hr (01-06ft) - MC+LV #12 40ft
IA - Surface: Tape = 1.0hr (07-12ft) - MC+LV #12 40ft
IA - Surface: Tape = 1.5hr (13-18ft) - MC+LV #12 40ft
IA - Surface: Tape = 2.0hr (19-24ft) - MC+LV #12 40ft
IA - Surface: Tape = 2.5hr (25-30ft) - MC+LV #12 40ft
IA - Surface: Tape = 3.0hr (31-36ft) - MC+LV #12 40ft
IA - Surface: Tape = 3.5hr (37-42ft) - MC+LV #12 40ft
IA - Surface: Tape = 4.0hr (43-48ft) - MC+LV #12 40ft
IA - Surface: Tape = 4.5hr (49-54ft) - MC+LV #12 40ft
Recessed
[!info] Recessed Fixtures
- recessed downlight
- recessed linear
- wall grazer
- troffer
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/HI HAT - ... |
| MC Cable | MC ASSEMBLIES/HI HAT - ... |
For crowded puck light areas: measure length between fixtures, round up to the nearest 5ft
Note
"HI HAT" refers to a recessed can fixture.
Undercabinet Fixtures
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/UNDER CABINET - ... |
| MC Cable | MC ASSEMBLIES/UNDER CABINET - ... |
Note
Takeoff 2 fixtures if jumping over oven
Paddle Fans
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/FAN RATED OCT BOX W/ BAR HNGR - ... |
| PVC | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
Stairwells & Elevators
PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY
Facade
Phase= "Facade"
Length and Labor will be more than a normal fixture in BOH/Amenity
| Fixture Type | Labor (hrs) |
|---|---|
| Non-Linear | 2 |
| Linear | [See tape lighting](#Tape Lighting) |
3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP
Length per Unit= Distance to panel
Porte Cochere (Drive up Area)
Create its own breakout in WBS, and phase in Accubid
[!quote] This is not technically exposed or drop ceiling, but still use PVC
Site & Courtyard
Important
Coordinate with landscape
Breakdowns
System= "FML - Site Fixtures Material & Labor"
Pole Lights
FIXTURE ACCESSORIES/SITE POLE ASSEMBLIES/...
Add subassemblies for stub-outs, pole, base, and grounding as appropriate.
Festoon Lighting
[!info] Also Known As
- string lighting
- market lighting
- catenary lighting
FIXTURE LABOR/FIXTURE LABOR 2HRFESTOON & ROOF ASSEMBLIES/FESTOON CABLE HANGER & EYE BOLTS - LENGTH
- Length per Unit = Light string length
COURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...
- Length per Unit = Distance to panel + 15ft
Other Fixture Types
| Fixture Type | Path (FIXTURE ACCESSORIES/COURTYARDS & LANDSCAPE/...) |
|---|---|
| Step Light | .../STEP FIX, 3/4" CONDUIT - PVC40 - ... |
| Bollard | .../BOLLARD, 3/4" CONDUIT - PVC40 - ...2 |
| Up-light | .../PERMA POST, 3/4" CONDUIT - PVC40 - ... |
| In-grade up-light | .../3/4" CONDUIT - PVC40, IMC Elbow, ... |
| Fixtures built into cabanas/pergolas | .../ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ... |
| Handrail light | .../ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40, IMC ELBOW - ... |
FAA Lighting
FIXTURE LABOR/FIXTURE LABOR 1HRFESTOON & ROOF ASSEMBLIES/Aircraft Warning, 3/4" Conduit GRC/PVC 2#10, 1#10G