7.5 KiB
id, aliases, tags
| id | aliases | tags | |
|---|---|---|---|
|
Fixture Designations
Naming
Format
<phase-abbr> - <assembly>(\: <subtype>)?( - <fixture-labor>)? \(<wiring-method>\)( <wm-descriptor>)* <branch-length>ft
[!example]
A - Surface: Pendant - 2.0hrs (MC) LV 20ft
Order
Use empty designations to separate phases.
[!example]
*** Hotel Units *** HU - Surface (MC) LV 20ft HU - Surface - 1.5hrs (MC) LV 20ft HU - Surface: Pendant - 2.0hrs (MC) LV 20ft HU - Surface: J-Box For Future Fixture (MC) LV 20ft HU - Recessed (MC) LV 20ft *** Condo Units *** CU - Surface: Tape - 1.0hrs (MC) LV 25ft CU - Surface: Wall (MC) LV 25ft
Fixture Labor
| Fixture Type | Labor |
|---|---|
| Paddle Fan | 1.5 hrs/ea |
| Pendant | 1-4 hrs/ea1 |
| Strip/Cove | 0.083 hrs/ft |
| Site Poles | 1.5 hrs/ea |
| Festoon | 2 hrs/ea |
| All Others | 1 hrs/ea |
Fixture Branch Length
| Case | Standard Length |
|---|---|
| Site/Courtyard | 50ft1 |
| Garage | 50ft |
| BOH | 40ft |
| Corridors | 40ft |
| Interior Amenity | 40ft2 |
| Office/Retail | 50ft |
| Exterior Amenity | 50ft |
| Units | 20ft |
Fixture Branch Wire size
| Case | Wire Size |
|---|---|
| Site/Courtyard | #101 |
| Garage | #10 |
| NM Cable | #142 |
| All Others | #12 |
Garage
Fixtures
Use ENT Assembly unless spec requires otherwise.
PVC/ENT ASSEMBLIES/GARAGE FIXTURE ENT W/#10 - STEEL OCT RING
PVC/ENT ASSEMBLIES/GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING
If PVC, use following assemblies:
| Case | Assembly Path |
|---|---|
| Ceiling | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
| Wall | PVC/ENT ASSEMBLIES/... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP |
Homeruns
System= "EL - Electrical"
Use 1 Homerun for every 3 circuits in Garage
Use assembly Common Assemblies/Device Homeruns in Slab/Deck
Surface Mount
[!info] Surface Mount Fixtures
- Wall Mount (Sconce)
- Pendant
- Linear
- Tape
- Track
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/SQ BOX, ROUND P RING & MNTG BRKT... |
| PVC in Ceiling | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
| PVC in Wall | PVC/ENT ASSEMBLIES/3/4" PVC W/ 3#12 - STL BOX/TILE RING |
| EMT | EMT ASSEMBLIES/... - SQ BOX & ROUND P RING |
Note
Use lighting control cable assemblies in Amenity areas
Tape Lighting
Also called "cove" or "strip", however those terms are less specific and potentially confusing.
Use item FIXTURE LABOR 1/2HR
and change Fct 1 to match the calculated labor.
Note
Tape lighting length is limited by the "max power length" of the model (usually measured in millimeters). Max power length is usually 5000 to 15000 mm (about 16 to 49 ft) depending on luminous output and voltage.
Separate these fixtures by labor, not length
A - Surface: Tape - 0.5hr (01-06ft) - MC #12 40ft
A - Surface: Tape - 1.0hr (07-12ft) - MC #12 40ft
A - Surface: Tape - 1.5hr (13-18ft) - MC #12 40ft
A - Surface: Tape - 2.0hr (19-24ft) - MC #12 40ft
A - Surface: Tape - 2.5hr (25-30ft) - MC #12 40ft
A - Surface: Tape - 3.0hr (31-36ft) - MC #12 40ft
A - Surface: Tape - 3.5hr (37-42ft) - MC #12 40ft
A - Surface: Tape - 4.0hr (43-48ft) - MC #12 40ft
A - Surface: Tape - 4.5hr (49-54ft) - MC #12 40ft
Recessed
[!info] Recessed Fixtures
- recessed downlight
- recessed linear
- wall grazer
- troffer
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/HI HAT - ... |
| MC Cable | MC ASSEMBLIES/HI HAT - ... |
For crowded puck light areas: measure length between fixtures, round up to the nearest 5ft
Note
"HI HAT" refers to a recessed can fixture.
Undercabinet Fixtures
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/UNDER CABINET - ... |
| MC Cable | MC ASSEMBLIES/UNDER CABINET - ... |
Note
Takeoff 2 fixtures if jumping over oven
Use 10ft #12/2 for MC & NM
Paddle Fans
| Wiring Method | Assembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/FAN RATED OCT BOX W/ BAR HNGR - ... |
| PVC | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
Stairwells & Elevators
PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY
Facade
Phase= "Facade"
Length and Labor will be more than a normal fixture in BOH/Amenity
| Fixture Type | Labor (hrs) |
|---|---|
| Non-Linear | 2 |
| Linear | [See tape lighting](#Tape Lighting) |
3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP
Length per Unit= Distance to panel
Porte Cochere (Drive up Area)
Create its own breakout in WBS, and phase in Accubid
[!quote] This is not technically exposed or drop ceiling, but still use PVC
FAA Lighting
FIXTURE LABOR/FIXTURE LABOR 1HRFESTOON & ROOF ASSEMBLIES/Aircraft Warning, 3/4" Conduit GRC/PVC 2#10, 1#10G
Site & Courtyard
Breakdowns
System: "FML - Site Fixtures Material & Labor"
Fixture Assemblies
| Fixture Type | Assembly Path |
|---|---|
| Step Light | COURTYARDS & LANDSCAPE/STEP FIX, 3/4" CONDUIT - PVC40 - ... |
| Bollard | COURTYARDS & LANDSCAPE/BOLLARD, 3/4" CONDUIT - PVC40 - ...1 |
| Up-light | COURTYARDS & LANDSCAPE/PERMA POST, 3/4" CONDUIT - PVC40 - ... |
| In-grade up-light | COURTYARDS & LANDSCAPE/3/4" CONDUIT - PVC40, IMC Elbow, ... |
| Fixtures built into cabanas/pergolas | COURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ... |
| Handrail light | COURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...2 |
Festoon Lighting
AKA "string" or "market" lights
FIXTURE LABOR/FIXTURE LABOR 2HRFESTOON & ROOF ASSEMBLIES/FESTOON CABLE HANGER & EYE BOLTS - LENGTH
Length per Unit= Light string lengthCOURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...
Length per Unit= Distance to panel + 15ft